Planning Application Status

PL2013003




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2013003
SAINT LUKES EAST HOSPITAL BUILDING ADDITION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
01/09/2013
RADIATION ONCOLOGY/UROLOGY BUILDING ADDITION
Locations
Contacts
ACI-BOLAND, INC, Address:11229 Nall, Ste. 140  
SHAFER KLINE & WARREN INC, Address:11250 CORPORATE AVE, Phone:(913) 888-7800  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 10/04/2013 10/02/2013
Jim Eden
Code Statement
Corrective Action Required
10/02/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit. Plan conditions verified at inspection.
Engineering Review Approved with Conditions 10/04/2013 09/30/2013
Jennifer Thompson
DE Engineers Estimate
Corrective Action Required
09/27/2013

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $1,809.24 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
09/27/2013

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
09/27/2013

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
09/27/2013

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
09/27/2013

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
09/27/2013

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
Planning Review No Comments 10/04/2013 09/30/2013
Jennifer Thompson
Traffic Review No Comments 10/04/2013 09/27/2013
Michael Park
Engineering Review Approved with Conditions 09/18/2013 09/18/2013
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
09/18/2013

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $1,809.24 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
09/18/2013

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
09/18/2013

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
09/18/2013

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
09/18/2013

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
09/18/2013

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
Fire Review Corrections 09/18/2013 09/17/2013
Jim Eden
Misc.
Corrective Action Required
09/17/2013

Parking Lot Review- Provide dimensions on the gates going into the parking lot. By scale it does not appear that a fire apparatus will be able to pass through and still clear mirrors and other equipment. 503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm). 503.2.2 Authority. The fire code official shall have the authority to require an increase in the minimum access widths where they are inadequate for fire or rescue operations. 503.6 Security gates. The installation of security gates across a fire apparatus access road shall be approved by the fire chief. Where security gates are installed, they shall have an approved means of emergency operation. The security gates and the emergency operation shall be maintained operational at all times.
Misc.
Corrective Action Required
09/17/2013

503.2.5 Dead ends. Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Recommend a cut through at the north end of the lot, or an approved turn around per IFC Appendix D.
Planning Review Corrections 09/18/2013 09/17/2013
Jennifer Thompson
Corrective Action Required
09/17/2013

The first space when entering the parking lot does not meet our minimum requirements for width. When measured it appears to be around 7-feet in width instead of the 9-foot minimum requirement.
Corrective Action Required
09/17/2013

Will there be any additional parking lot lighting proposed for this portion of the parking lot? If so, please provide lighting specifications.
Corrective Action Required
09/18/2013

When resubmitting revised plans, please submit 6 full size plans and one half size set of plans (this will be a total of 7 sets of plans).
Traffic Review No Comments 09/18/2013 09/13/2013
Michael Park
Fire Review Condition(s) of Approval 03/04/2013 02/27/2013
Jim Eden
Code Statement
Corrective Action Required
02/27/2013

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 03/04/2013 02/25/2013
Michael Park
Planning Review No Comments 03/04/2013 02/25/2013
Jennifer Thompson
Engineering Review Condition(s) of Approval 03/04/2013 02/25/2013
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
02/25/2013

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $1,323.30 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
02/25/2013

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
02/25/2013

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
02/25/2013

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
02/25/2013

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
02/25/2013

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
Fire Review Condition(s) of Approval 02/14/2013 02/14/2013
Jim Eden
Code Statement
Corrective Action Required
02/14/2013

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Planning Review No Comments 02/14/2013 02/14/2013
Jennifer Thompson
Engineering Review Corrections 02/14/2013 02/14/2013
Gene Williams, P.E.
Corrective Action Required
02/14/2013

A dedicated erosion and sediment control plan must be submitted with this project since they are considered separate from the private sanitary sewer improvements. We cannot approve the plan set without a dedicated erosion and sediment control plan for this project.
Corrective Action Required
02/14/2013

The Engineer's Estimate of Probable Construction Costs should be revised to include the erosion and sediment control.
Traffic Review No Comments 02/14/2013 02/12/2013
Michael Park
Engineering Review Corrections 01/24/2013 01/24/2013
Gene Williams, P.E.
Corrective Action Required
01/24/2013

An erosion and sediment control plan appeared to be missing from the Final Development Plan.
Corrective Action Required
01/24/2013

A sealed Engineer's Estimate of Probable Construction Costs should be submitted along with your final submittal. The Engineering Plan Review and Inspection Fee is calculated at 3% of this cost. The estimate should include all items necessary to perform the work (excluding the building).
Traffic Review No Comments 01/24/2013 01/22/2013
Michael Park
Planning Review Corrections 01/24/2013 01/18/2013
Jennifer Thompson
Corrective Action Required
01/18/2013

The driveway, in it's current formation, creates a blind spot/sight distance situation for motorists turning left. If the driveway remains in this formation it should be signed as a right-turn only and as a one-way drive. Staff recommends relocating the driveway to create better sight distance for motorists turning either left or right.
Corrective Action Required
01/18/2013

Provide the lighting specifications for the proposed wall pak lighting.
Corrective Action Required
01/18/2013

The Unified Development Ordinance (UDO) requires the tree caliper size to be 3-inches, please revise the landscape table accordingly.
Fire Review Condition(s) of Approval 01/24/2013 01/15/2013
Jim Eden
Hazardous Materials
Resolved
02/27/2013

Fire Department- A Hazardous Materials Permit may be required for this project. Submit a completed permit application to the Fire Department for review. Provide an updated Hazardous Materials Permit application for the LINNAC. 2/27/2013 No longer using source material.
Code Statement
Corrective Action Required
01/15/2013

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 01/09/2013
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
01/09/2013 Letter Routing Sheet - FDP
02/07/2013 Letter Resubmittal Routing Sheet - FDP
02/25/2013 Letter Resubmittal Routing Sheet - FDP
02/28/2013 fee worksheet pl2013003.xlsx
02/28/2013 EPRIF.pdf
06/21/2013 Letter Applicant Letter - FDP (DFDP)
06/21/2013 Letter Applicant Letter - FDP (DFDP)
06/21/2013 Letter Applicant Letter - FDP (DFDP)
09/11/2013 Letter Resubmittal Routing Sheet - FDP
09/27/2013 Letter Resubmittal Routing Sheet - FDP
03/18/2014 Letter Applicant Letter - FDP (DFDP)
03/18/2014 Letter Applicant Letter - FDP (DFDP)
11/15/2017 Activity Document EPRIF
11/15/2017 Activity Document fee worksheet FDP Revised Sept 2013
11/15/2017 Activity Document fee worksheet pl2013003
11/15/2017 Activity Document fee worksheet REVISED
09/09/2019 Saint Lukes
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents