Summary
PL2011068
CHICK-FIL-A
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/02/2011
CBL LEES SUMMIT EAST LLC
Locations
Contacts
CBL LEES SUMMIT EAST LLC, Address:2030 HAMILTON PLACE BLVD STE 500  
CHICK-FIL-A, Address:690 NW BLUE PKWY, Phone:(816) 246-2948  
GBC Design, Inc., Address:3378 W Market St.  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 08/01/2011 10/06/2011
Gene Williams, P.E.
Traffic Review No Comments 08/01/2011 08/01/2011
Michael Park
Planning Review No Comments 08/01/2011 07/29/2011
Hector Soto Jr.
Fire Review Complete 08/01/2011 07/28/2011
Jim Eden
Code Statement
Corrective Action Required
07/28/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Marking
Corrective Action Required
07/28/2011

Fire Department- IFC 505.3 Where required by the fire code official, approved signs or other approved notices shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. Signs or notices shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: Maintain existing "no Parking Fire Lane" signage on the access lane to Red Lobster and Olive Garden.
Planning Review Corrections 06/16/2011 06/16/2011
Hector Soto Jr.
Planning Correction
Corrective Action Required
06/16/2011

Mechanical equipment. It isn't clear if all of the roof-top units (RTUs), e.g. HVAC, cooler and freezer condensers, will be fully screened from view by the building's parapets. The UDO requires all RTUs to be fully screened from view by raising the parapets to a height at least equal to the heights of the units being screened. Please submit revised building elevations with the mechanical equipment dashed in, or some type of roof section detail, to clearly show that the RTUs are fully screened by the parapets in accordance with the UDO.
Fire Review Corrections 06/16/2011 06/13/2011
Jim Eden
Code Statement
Corrective Action Required
06/13/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
FDC's
Resolved
07/28/2011

Fire Department-A fire hydrant shall be located within 100 feet of the fire department connection (FDC). The plans show two FDC's. The FDC shall be located within 100 feet of a hydrant and proximall to, or on the building. Extending lines from a hydrant to an apparatus then to the FDC, shall not obstruct access to the buildings to the south. Remove the FDC from the BFV, which is also shown on the wrong side of the vault.
Hydrants
Corrective Action Required
06/13/2011

"Fire Department- IFC 508.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official." Provide a hydrant within 300 feet of the building and to the east of the fire lane to the buildings to the south. Place the hydrant at 2C of drawing PS-1.0 and the FDC on the building.
Engineering Review Corrections 06/16/2011 06/09/2011
Tony Reames
Corrective Action Required
06/09/2011

Contact Benton Haskamp concering the deduct meter on the irrigation line at 816-969-1930
Corrective Action Required
06/09/2011

The Engineer's cost estimate has been accepted. An Engineering Plan Review and Inspection fee of $2,074.99 has been calculated and would need to be paid to the Public Works Department prior to construction beginning.
Traffic Review No Comments 06/16/2011 06/06/2011
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 06/02/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/02/2011 Letter Admin Route Sheet FDP
06/16/2011 Letter Applicant Letter (FDP)
06/16/2011 Letter Applicant Letter (FDP)
06/16/2011 Letter Applicant Letter (FDP)
06/16/2011 Sewer Application
06/16/2011 Sewer Review
06/16/2011 Sewer Permit
06/16/2011 SS Permit
07/25/2011 Letter Admin Re-Route FDP
08/01/2011 Fee Worksheet.xls
08/01/2011 Fee Worksheet.xls
08/02/2011 Letter Approval Letter (Administrative)
08/02/2011 Letter Approval Letter (Administrative)
08/02/2011 Letter Approval Letter (Administrative)
08/02/2011 Fee Worksheet0.xls
08/10/2011 Letter Applicant Letter (FDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home