Summary
PL2019135
GOPPERT ACRES, 2ND PLAT, LOTS 3-8
Final Plat
City Council
04/03/2019
GOPPERT DUSTY L & KRISTINA N
Locations
Reviews
Review Type Outcome Est. Completion Completed
Planning Review No Comments 06/03/2019 07/22/2019
Shannon McGuire N/A
Traffic Review No Comments 06/03/2019 07/16/2019
Michael Park N/A
Engineering Review Approved with Conditions 06/03/2019 07/16/2019
Sue Pyles N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
07/10/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
07/10/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/10/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
07/10/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
07/10/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
07/10/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
07/10/2019

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
Fire Review Complete 06/03/2019 07/15/2019
Jim Eden N/A
Misc.
Resolved
07/15/2019

Change the street name to 15th Circle or Court.
GIS Review No Comments 06/03/2019 07/11/2019
Kathy Kraemer N/A
Corrective Action Required
07/11/2019

Lot size legend does not correspond to plat.
Engineering Review Approved with Conditions 07/02/2019 06/27/2019
Kent Monter N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
06/27/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
06/27/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/27/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
06/27/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
06/27/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
06/27/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
06/27/2019

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
Traffic Review No Comments 07/02/2019 06/18/2019
Michael Park N/A
Planning Review Corrections 07/02/2019 06/17/2019
Shannon McGuire N/A
Corrective Action Required
06/17/2019

Please remove “proposed” from all labels throughout the plat document.
Corrective Action Required
06/17/2019

Please add a statement establishing ownership and maintenance responsibility for all common area tracts, private easements, or other non-public areas.
Corrective Action Required
06/17/2019

Please provide a copy of the CC&R’s.
Corrective Action Required
06/21/2019

Revise the Mayor's name under the signature line to read, William A. Baird.
Corrective Action Required
06/21/2019

Revise the plat title to read, Goppert Acres, Lots 1A-1F and Tract A. Update all plat title references to reflect the corrected plat title.
GIS Review Corrections 07/02/2019 06/10/2019
Kathy Kraemer N/A
Corrective Action Required
06/10/2019

Please provide ITB on street centerline for SW 15th Ct.
Corrective Action Required
06/10/2019

Since it doesn't appear that there are curves on each side of the cul_de_sac, which would require a return radius, please provide the ITBs on either side of the curve.
Fire Review Corrections 07/02/2019 06/06/2019
Jim Eden N/A
Misc.
Resolved
07/02/2019

Provide a fire hydrant in the cul-de-sac.
Misc.
Corrective Action Required
06/06/2019

Change the street name to 15th Circle or Court.
Planning Review Corrections 05/03/2019 05/03/2019
Shannon McGuire N/A
Corrective Action Required
05/03/2019

Please update the plat name to reflect “Goppert Acres, 2nd Plat, Lots 2A, 3-7 & Tract A”. Please update the plat title throughout the plat as needed.
Corrective Action Required
05/03/2019

Please remove “proposed” from all sidewalk and easement labels.
Corrective Action Required
05/03/2019

Please add a statement establishing ownership and maintenance responsibility for all common area tracts, private easements, or other non-public areas.
Corrective Action Required
05/03/2019

Please update the City signature block to reflect Ryan Elam’s correct title as “Director of Development Services”
Corrective Action Required
05/03/2019

Please update the Planning Commission Secretary to reflect Dana Arth.
Corrective Action Required
05/03/2019

Please provide a copy of the CC&R’s.
Corrective Action Required
05/03/2019

Please remove the sidewalk note that states, “There are no current sidewalks on the subject property”.
Corrective Action Required
05/03/2019

Detail “A” seems to cut off Lots 3 & 8. Please expand this drawing to include to full limits of those lots.
Corrective Action Required
05/03/2019

Please label each lot with its address as follows; Lot 3 = 716 Lot 4 = 720 Lot 5 = 724 Lot 6 = 725 Lot 7 = 717 Lot 8 = 713 Tract A = 721
Corrective Action Required
05/03/2019

If Tract A is meant to be a community amenity for the residents to use, please provide an access easement or extend the tract to have street frontage.
Engineering Review Corrections 05/03/2019 05/03/2019
Sue Pyles N/A
Corrective Action Required
05/03/2019

Revise "drainage flow plans on the lots" to "drainage flow plans on the lots, covered by the Master Drainage Plan" in the Drainage Note.
GIS Review Corrections 04/17/2019 04/17/2019
Kathy Kraemer N/A
Corrective Action Required
04/17/2019

Please submit an electronic copy of the plat.
Traffic Review No Comments 04/17/2019 04/11/2019
Michael Park N/A
Fire Review Approved with Conditions 04/02/2019 04/10/2019
Jim Eden N/A
Misc.
Corrective Action Required
04/10/2019

Provide a fire hydrant in the cul-de-sac.
Misc.
Corrective Action Required
04/10/2019

Change the street name to 15th Circle or Court.
Assign Reviewers Complete 04/03/2019 04/08/2019
Joshua Johnson N/A
Hearings
Title Location Date Time
Planning Commission Meeting 07/11/2019 05:00 PM Council Chambers 07/11/2019 05:00 PM
Application Review
Approved
07/11/2019
Documents & Images
Date Uploaded File Type Document Name
04/03/2019 Receipt Receipt for transaction: 2019-001230
04/03/2019 Letter Routing Sheet
05/03/2019 Letter Applicant Letter - FP (DRCF)
05/23/2019 42259dw2_2019-03-06 - Final Plat_2019-05-22
06/06/2019 Letter Resubmittal Routing Sheet
06/21/2019 Drawing Location Map
06/21/2019 Letter Staff Letter
07/02/2019 Letter Applicant Letter - FP (DRCF)
07/09/2019 Plans 42259dw2_2019-07-09 - Final Plat
07/10/2019 Letter Resubmittal Routing Sheet
07/10/2019 Plans 42259dw2_2019-07-09 - Final Plat
07/22/2019 Letter Applicant Letter - FP (DRCF)