Permit Application Status

PRSUBD20231337


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20231337
Public Infrastructure
Substantial Completion
COLBERN ROAD INVESTORS LLC
DEVELOPMENT COMPLETE
Colbern Road Investments - Lots 1 & 2: Public Streets & Storm Improvements, Public Sanitary, Public Water., Site Grading.
03/31/2023
11/06/2023
Locations
Contacts
COLBERN ROAD INVESTORS LLC, Address:1325 FAIR MARKET DR  
MATT SCHLICHT, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Mike Atcheson, Address:3170 NE Carnegie Dr, Suite 499, Phone:(816) 795-8100  
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/02/2023 11/02/2023
Scott Ready
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $746.15 $746.15 Paid 09/25/2023
Water Test Fee $200.00 $200.00 Paid 09/25/2023
Right of Way Permit Fee $255.00 $255.00 Paid 09/25/2023
Sanitary Sewer Insp Fees $311.46 $311.46 Paid 09/25/2023
Storm Sewer Inspection Fee $1,165.59 $1,165.59 Paid 09/25/2023
Paved Surface Inspection Fee $6,817.50 $6,817.50 Paid 09/25/2023
Site Grading Fee $750.00 $750.00 Paid 09/25/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Install Street and Stop Signs Pending
ESC - (Vegetation/Ground Cover) Pending
Misc
Informational
02/24/2025
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Vacuum Pending
Water Line - Hydrostatic Test Pending
Water Line - Coliform Test 2 Pending 7/6/2025
Water Line - Abandonment Pending 7/6/2025
Storm Sewer Construction Inspection Pending 7/6/2025
Misc
Informational
03/13/2024
3-12-24 PS Contractor installing storm HDPE and setting box 2-2, STA 2+09.15 at time of inspection. PM Contractor set storm box 2-3 at STA 2+43.15 3-13-24 PS Contractor set storm box 3-1 and ran HDPE connecting box 3-1 to 2-3. PM Contractor set HDPE to storm box 2-2 and HDPE from 2-2 to 2-3, contractor excavating for flared end section 2-4
Water Line - Coliform Test 1 Pending 7/6/2025
Misc
Informational
03/20/2024
Notes added to project by mistake PS
Pavement-Curb Construction Pending 7/6/2025
Misc
Informational
09/16/2024
8-29-24 NS Site visited for proof roll and curb construction and it appears all curb is put in and I will walk it in a couple months to check for any damage.
Sidewalk Inspection Pending 7/6/2025
Water Line - Hydrostatic Test Pending 7/6/2025
Sanitary Sewer - Mandrel Pending 7/28/2025
Sanitary Sewer - Camera Test Pending 8/8/2025
Sanitary Sewer - Camera Test Pending 8/21/2025
Erosion Control Inspection Partial 12/18/2023 12/18/2023
Misc
Informational
12/18/2023
12-18-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/22/2023 12/22/2023
Misc
Informational
12/18/2023
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/2/2024 01/03/2024
Misc
Informational
12/22/2023
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/23/2024 01/23/2024
Misc
Informational
01/03/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues
Water Line - Hydrostatic Test Passed 02/14/2024
Misc
Informational
02/14/2024
test started @8:37 a.m @150psi 9:00 @150 psi 10:00 @150 psi 10:37 @150 psi Passed
Site Visit Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
03/06/2024
3-6-24 PS No activity on site
Site Visit Partial 3/8/2024 3/8/2024 03/08/2024
Misc
Informational
03/06/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site
Water Line - Coliform Test 1 Passed 03/11/2024
Misc
Informational
03/11/2024
3-11-24 NS Site visited and both water samples passed.
Storm Sewer Construction Inspection Partial 3/12/2024 3/12/2024 03/12/2024
Misc
Informational
03/12/2024
3-12-24 PS Contractor installing storm HDPE and setting box 2-2, STA 2+09.15 at time of inspection
Storm Sewer Construction Inspection Partial 3/12/2024 3/12/2024 03/12/2024
Misc
Informational
03/12/2024
3-12-24 PS Contractor installing storm HDPE and setting box 2-2, STA 2+09.15 at time of inspection. PM Contractor set storm box 2-3 at STA 2+43.15
Storm Sewer Construction Inspection Partial 3/13/2024 3/13/2024 03/13/2024
Misc
Informational
03/12/2024
3-12-24 PS Contractor installing storm HDPE and setting box 2-2, STA 2+09.15 at time of inspection. PM Contractor set storm box 2-3 at STA 2+43.15 3-13-24 PS Contractor set storm box 3-1 and ran HDPE connecting box 3-1 to 2-3
Storm Sewer Construction Inspection Partial 3/13/2024 3/13/2024 03/13/2024
Misc
Informational
03/13/2024
3-12-24 PS Contractor installing storm HDPE and setting box 2-2, STA 2+09.15 at time of inspection. PM Contractor set storm box 2-3 at STA 2+43.15 3-13-24 PS Contractor set storm box 3-1 and ran HDPE connecting box 3-1 to 2-3. PM Contractor set HDPE to storm box 2-2 and HDPE from 2-2 to 2-3, contractor excavating for flared end section 2-4
Water Line - Coliform Test 1 Partial 3/19/2024 3/19/2024 03/19/2024
Misc
Informational
03/19/2024
3-19-24 PS first bact (2) samples taken and delievered to keystone lab
Site Visit Partial 3/19/2024 3/19/2024 03/19/2024
Misc
Informational
03/08/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site
Water Line - Coliform Test 1 Partial 03/20/2024
Misc
Informational
03/19/2024
Notes added to project by mistake PS
Site Visit Partial 3/20/2024 3/20/2024 03/20/2024
Misc
Informational
03/19/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site
Site Visit Partial 3/26/2024 3/26/2024 03/26/2024
Misc
Informational
03/20/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site
Erosion Control Inspection Partial 3/26/2024 3/26/2024 03/26/2024
Misc
Informational
01/23/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues
Grading/Excavation/Fill Inspection Passed 3/29/2024 03/29/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that grading is complete
ESC - (Vegetation/Ground Cover) Partial 3/29/2024 03/29/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered
Erosion Control Inspection Partial 3/29/2024 03/29/2024
Misc
Informational
03/26/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues
Install Street and Stop Signs Partial 3/29/2024 03/29/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that work has not been done.
Install Street and Stop Signs Partial 3/29/2024 03/29/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that work has not been done.
Site Visit Partial 4/2/2024 4/2/2024 04/02/2024
Misc
Informational
03/26/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site
Erosion Control Inspection Partial 4/18/2024 04/18/2024
Misc
Informational
03/29/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Failed 6/28/2024 07/17/2024
Misc
Corrective Action Required
07/17/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-17-24 NS Site visited and the erosion control has failed on the east side of lot and have run off in library parking lot and needs to be cleaned up within 24 hours from today
Erosion Control Inspection Partial 7/25/2024 07/25/2024
Misc
Informational
06/28/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 8/6/2024 08/06/2024
Misc
Informational
07/25/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues
Site Visit Partial 8/8/2024 08/08/2024
Misc
Informational
04/02/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain.
ESC - (Vegetation/Ground Cover) Partial 8/8/2024 08/08/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered.
Erosion Control Inspection Partial 8/8/2024 08/08/2024
Misc
Informational
08/06/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues
Erosion Control Inspection Partial 8/22/2024 08/22/2024
Misc
Informational
08/08/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues
Site Visit Partial 8/27/2024 08/27/2024
Misc
Informational
08/08/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on.
Pavement-Proof Roll Passed 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
8-29-24 NS Site visited for a proof roll and it appears it has passed.
Pavement-Curb Construction Partial 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
8-29-24 NS Site visited for proof roll and curb construction and it appears all curb is put in and I will walk it in a couple months to check for any damage.
Site Visit Partial 9/4/2024 09/04/2024
Misc
Informational
08/27/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured.
Install Street and Stop Signs Passed 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
9-13-24 DP. Stop sign, stop bar and arrows have been installed on the new road. The road is being opened today.
Install Street and Stop Signs Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
03/29/2024
3-29-24 NS Site Visited and it appears that work has not been done. 9-13-24 DP. Stop sign, stop bar and arrows have been installed. They crosswalk has not been installed yet but not needed until sidewalk is installed. The new road will be opened today.
Site Visit Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/04/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP
Site Visit Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday.
Sidewalk Inspection Partial 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
09/16/2024
9-16-24 DP. Shane's crew with JK concrete was onsite today and pouring public sidewalk. They were shy on their aggregate depth so pulled forms, dug the area deeper and added 4" of compacted AB3 aggregate. Cross slopes on pre pour were in compliance. The section they had formed, there were approved to pour.
Pavement-Curb Construction Partial 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
09/16/2024
9-16-24 DP. Shane's crew with JK concrete was onsite today and they poured the part of the median deemed for emergency vehicles. They poured it 4" thick and will end up being 2" above finished asphalt. They finished it with white cure. Cure time on this will be 10 days.
Site Visit Partial 9/18/2024 09/18/2024
Misc
Informational
09/13/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today.
Site Visit Partial 9/19/2024 09/19/2024
Misc
Informational
09/18/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today.
Erosion Control Inspection Partial 9/30/2024 09/30/2024
Misc
Informational
08/22/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues
Site Visit Partial 9/30/2024 09/30/2024
Misc
Informational
09/19/2024
3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour.
Erosion Control Inspection Failed 10/11/2024 10/14/2024
Misc
Informational
09/30/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet.
Site Visit Partial 10/10/2024 10/14/2024
Misc
Informational
09/30/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in.
ESC - (Vegetation/Ground Cover) Partial 10/31/2024 10/31/2024
Misc
Informational
08/08/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing
Erosion Control Inspection Partial 10/31/2024 10/31/2024
Misc
Informational
10/14/2024
12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection.
Site Visit Partial 11/8/2024 11/08/2024
Misc
Informational
10/14/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up.
Erosion Control Inspection Partial 11/13/2024 11/13/2024
Misc
Informational
10/31/2024
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed
Site Visit Partial 11/21/2024 11/21/2024
Misc
Informational
11/08/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk.
Site Visit Partial 11/26/2024 11/26/2024
Misc
Informational
11/21/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk. 11-25-24 NS Site visited no work being done and still waiting on utilities to be moved to put in sidewalk and turn lane
Erosion Control Inspection Partial 12/13/2024 12/13/2024
Misc
Informational
11/13/2024
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/13/2024 12/13/2024
Misc
Informational
10/31/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter.
Site Visit Partial 12/13/2024 12/13/2024
Misc
Informational
11/26/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk. 11-25-24 NS Site visited no work being done and still waiting on utilities to be moved to put in sidewalk and turn lane 12-13-24 NS Site Visited and crews have not been working.
Site Visit Partial 12/31/2024 12/31/2024
Misc
Informational
12/13/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk. 11-25-24 NS Site visited no work being done and still waiting on utilities to be moved to put in sidewalk and turn lane 12-13-24 NS Site Visited and crews have not been working. 12-31-24 NS Site visited it appears no work due to rain.
Erosion Control Inspection Partial 12/31/2024 12/31/2024
Misc
Informational
12/13/2024
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/31/2024 12/31/2024
Misc
Informational
12/13/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter.
Erosion Control Inspection Partial 1/25/2025 01/25/2025
Misc
Informational
12/31/2024
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 1/25/2025 01/25/2025
Misc
Informational
12/31/2024
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 1/31/2025 01/31/2025
Misc
Informational
01/25/2025
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues
Site Visit Partial 1/31/2025 01/31/2025
Misc
Informational
12/31/2024
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk. 11-25-24 NS Site visited no work being done and still waiting on utilities to be moved to put in sidewalk and turn lane 12-13-24 NS Site Visited and crews have not been working. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. We are waiting for the plans to be approved for a driveway to the library.
Erosion Control Inspection Partial 2/24/2025 02/24/2025
Misc
Informational
01/31/2025
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 2/24/2025 02/24/2025
Misc
Informational
01/25/2025
3-29-24 NS Site Visited and it appears that some of the ground is covered 8-8-24 NS Site Visited and it appears that ground is still covered. 10-31-24 NS Site Visited and grass is growing 12-13-24 NS Site Visited and grass has stopped growing since it is winter. 12-31-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 2/28/2025 02/28/2025
Misc
Informational
02/24/2025
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues
Site Visit Partial 2/28/2025 02/28/2025
Misc
Informational
01/31/2025
Colburn Road Investments 3-6-24 PS No activity on site 3-8-24 PS No activity on site 3-19-24 PS No activity on site 3-20-24 PS No activity on site 3-26-24 PS No activity on site 4-2-24 PS No activity on site 8-8-24 NS Site Visited and no one is working due to rain. 8-27-24 NS Site Visited and it appears no work is going on. 9-4-24 NS Site visited and it appears that asphalts base has been put down and curb islands have been poured. 9-13-24 DP. The new road has been painted and a stop sign has been installed. It is being opened up today. JK concrete is planning on coming out Monday and will pour the area of the median where the fire trucks and ambulances will be able to cross over. Starting wednesday, the asphalt crew will be able to come and finish patching asphalt. I spoke with Earl and he knows he can start as soon as Wednesday, but didn't know when his schedule will work out but knows it needs to be done ASAP 9-13-24 DP. UPDATE-- The new road was painted this morning with arrows and stop bar. The stop sign has also been installed. They did not paint the crosswalk but the sidewalk hasn’t been installed yet. We will look for the cross walk to be finished when there is a sidewalk. The new road has been opened. I received a call from Susan Berry about some issues with the lane drop and also traffic that is driving eastbound on Colbern turning north onto Rice road though the area that is left out for fire. Mrs. Berry said to block the entrance or install a no left turn sign and Mr. Eden said to leave it open and accessible through the weekend. Redford met me onsite and turned the arrow board off and removed cones which were causing a unnecessary lane drop. They did have a problem installing the no left turn sign since the original plan called for the new road to be opened before closing off the fire truck crossing, which Ryan confirmed. I called Susan Berry back which was out for the weekend so talked to Erin Ralovo. Erin called Michael Park and got confirmation to left the no left turn sign off for the weekend and to leave the fire truck crossing open. On Monday, JK concrete will be onsite to pour the remaining median. Superior Bowen will be in to finish asphalt after Wednesday. 9-18-24 NS Site visited and the crews have put up road signs today. 9-19-24 NS Signs are still up and no work happening today. 9-30-24 NS Site Visited sidewalk crews are working and pouring the sidewalks on the north and south side. I did a inspection on the sidewalks this morning and it appeared that they met city standards to be able to pour. 10-14-24 NS Site visited and crews are putting sidewalk in and will be the second to last that will be done and te crews are waiting on utilities to be moved before they can put the rest of sidewalk and turn lanes in. 11-8-24 NS signs have been put up and curbs have been painted and I am waiting for the stop lights to be put up. 11-21-24 NS Site visited no work being done today and it appears that the traffic lights will be put up next spring 2025 and They are still waiting for utilities to be moved so they can finish up the rest of the sidewalk. 11-25-24 NS Site visited no work being done and still waiting on utilities to be moved to put in sidewalk and turn lane 12-13-24 NS Site Visited and crews have not been working. 12-31-24 NS Site visited it appears no work due to rain. 1-31-25 NS Site visited crews are not working because of rain. We are waiting for the plans to be approved for a driveway to the library. 2-28-25 NS Site visited and it appears trees on the next lot have been removed and crews are getting ready to work on the new driveway.
Erosion Control Inspection Partial 4/23/2025 04/24/2025
Misc
Informational
02/28/2025
Colbern road investments 12-18-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion issues 8-22-24 NS Site Visited and no erosion issues 9-30-24 NS Site Visited and no erosion control issues 10-14-24 NS Silt fence needs to be put back up and repaired around job site with grass seed put down with gutter buddies in every storm inlet. 10-31-24 NS Site Visited and no work has been done since last inspection. 11-6-24 NS Site Visited and still no erosion control has been fixed from. I will contact the developer 11-13-24 NS Site Visited and still no erosion control has been fixed 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-7-25 NS Went by and there is mud in the street and sidewalk. 3-19-25 NS I went by mud has not been put up and no work has started 4-17-25 NS Site visited and it appears that Beir has started work 4-24-25 NS Mud is still on sidewalk and road-way
Sidewalk Inspection Partial 5/14/2025 05/13/2025
Misc
Informational
09/16/2024
9-16-24 DP. Shane's crew with JK concrete was onsite today and pouring public sidewalk. They were shy on their aggregate depth so pulled forms, dug the area deeper and added 4" of compacted AB3 aggregate. Cross slopes on pre pour were in compliance. The section they had formed, there were approved to pour. 5-13-25 NS Site visited, and it appears that work on the Heartland has started and I will not give this a pass until all work is done and all sidewalks have been put in.
Water Line - Construction Inspection Passed 6/23/2025 06/23/2025
Misc
Informational
06/23/2025
6-23-25 NS Site visited, and it appears water has passed.
Sanitary - Material Verification Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Sewer has been tested correctly. Passed
Sanitary Sewer Construction Inspection Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Sewer has been installed correctly. Passed
Sanitary Sewer - Air Test Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Sewer has been tested correctly. Passed
Sanitary Sewer - Mandrel Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Sewer has been tested correctly. Passed
Sanitary Sewer - Vacuum Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Sewer has been tested correctly. Passed
Pavement-Surface Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS Pavement has been installed correctly. Passed
Pavement-Aggregate Base Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS pavement has been installed correctly. Passed
Pavement-Stabilized Subgrade Passed 7/6/2025 07/09/2025
Misc
Informational
07/09/2025
7-7-25 NS pavement has been installed correctly. Passed
Sanitary Sewer Construction Inspection Passed 7/11/2025 07/22/2025
Misc
Informational
07/22/2025
7-22-25 NS Site visited and it appears that sewer has been connected correctly.
Water Line - Construction Inspection Passed 7/6/2025 07/22/2025
Misc
Informational
07/22/2025
7-22-25 NS Site visited and it appears inspection passed at this time.
Pavement-Aggregate Base Passed 7/6/2025 07/22/2025
Misc
Informational
07/22/2025
7-22-25 NS Site visited and it appears inspection passed at this time.
Pavement-Stabilized Subgrade Passed 7/6/2025 07/22/2025
Misc
Informational
07/22/2025
7-22-25 NS Site visited and it appears inspection passed at this time.
Documents & Images
Date Uploaded File Type Document Name
03/31/2023 Approved Plans Colbern Road Investments lots 1 and 2 Public Water Approved 03 31 23
03/15/2023 Engineers Estimate COST ESTIMATE PUBLIC WATER 2023-2-9
03/31/2023 Activity Document Fees PL2022330 Colbern Road Inv Water
06/21/2023 Approved Plans PL2022331 Colbern Rd Investments Lots 1 & 2 Sanitary Approved 06 21 23
06/21/2023 Activity Document Fees PL2022331 Colbern Road Inv. Lots 1 & 2 Sanitary
03/15/2023 Engineers Estimate COST ESTIMATE PUBLIC SANITARY 2022-9-12
09/11/2023 Approved Plans Street and Storm Approved 09 11 23
09/25/2023 Receipt Receipt for transaction:2023-007284
11/06/2023 Letter DE-Permit
01/23/2024 Letter INSPECTION SUMMARY
02/14/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/08/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/26/2024 Letter INSPECTION SUMMARY
03/26/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter DE-Certificate of Substantial Completion Single Lot
11/26/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
01/25/2025 Letter INSPECTION SUMMARY
01/25/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
04/16/2025 Approved Plans Colbern & Rice Signal APPROVED
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter SUBD Punch List
05/14/2025 Letter DE-Certificate of Substantial Completion Single Lot
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
06/23/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/09/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home