Permit Application Status

PRSUBD20222424


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20222424
Public Infrastructure
Issued
CLAYTON PROPERTIES GROUP, INC
DEVELOPMENT COMPLETE
FULL DEVELOPMENT OF A 65 LOT SINGLE FAMILY SUBDIVISION
06/02/2022
01/19/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Anthony Nosbush, Address:140 Walnut, Ste 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/02/2022 01/19/2024
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2023
91100C8-Sanitary Sewer Insp Fees $26,927.46 $26,927.46 Paid 12/15/2023
91100C9-Water Insp Fee $22,887.00 $22,887.00 Paid 12/15/2023
9110072-Water Test Fee $1,400.00 $1,400.00 Paid 12/15/2023
9110068-Storm Fee $39,463.65 $39,463.65 Paid 12/15/2023
9110081-Street Inspections $48,230.91 $48,230.91 Paid 12/15/2023
9110071-Site Grading Fee $7,914.00 $7,914.00 Paid 12/15/2023
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $25.00 $0.00 $25.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $200.00 $0.00 $200.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $200.00 $0.00 $200.00 Not Paid


$425.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Sanitary Sewer Construction Inspection Pending
Misc
Informational
04/08/2024
3-20-24 BR Contractor core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 4-8-24 RH. Contractor started placing MH A-10. Hole was dug while on site.
Site Visit Pending
Misc
Informational
06/27/2024
3-4-24 BR Contractor is work on the grading the area. 6-27-24 Dustin A, working on storm
Storm Sewer Construction Inspection Pending
Misc
Informational
07/08/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 7-8-24 PS ESS setting storm line 2900, storm boxes 2910, 2911 set with 30" HDPE placed. Excavating for install of boxes 2912 and 2913 today
Erosion Control Inspection Pending
Water Line - Construction Inspection Pending
Misc
Informational
09/09/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project.
Water Line - Coliform Test 1 Pending
Misc
Informational
09/13/2024
9-13-24 BR 1st coliform 4 spot samples was taken on water line 1 & line 2.
Water Line - Coliform Test 2 Pending
Misc
Informational
09/16/2024
9-16-24 BR 2nd coliform 4 spot samples was taken on water line 1 & line 2.
Pavement-Stabilized Subgrade Pending
Misc
Informational
09/26/2024
9-26-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Cape Dr.
Water Line - Coliform Test 1 Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Pavement-Curb Construction Pending
Misc
Informational
10/21/2024
10-21-24 BR Contractor poured concrete curbs on SE Cape Dr., SE , SE Ranchland St., Falling Star Dr., SE Sweet Root Dr., SE Rising Sun Dr.
Sidewalk Inspection Pending
Misc
Informational
11/07/2024
11-6-24 BR Contractor (ESS) formed up sidewalk and aggregate is place and compacted on 5 panels at corner of SE Bailey & SE Brownfield Dr. ready for concrete. 11-7-24 BR Sidewalk is constructed to LS specification at corner of SE Bailey & SE Brownfield Dr. passed.
Pavement-Surface Pending
Misc
Informational
11/08/2024
11-8-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on Bailey Farms PKWY & SE Cape Dr.
Sanitary Sewer Construction Inspection Partial 04/08/2024
Misc
Informational
03/20/2024
3-20-24 BR Contractor core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 4-8-24 RH. Contractor started placing MH A-10. Hole was dug while on site.
Site Visit Partial 05/07/2024
Misc
Informational
03/06/2024
3-4-24 BR Contractor is work on the grading the area. 3-7-24 BR No work being done do to weather conditions. 3-11-24 BR Contractor is grading the area. 3-13-24 BR Contractor is grading the area. 3-18-24 BR Contractor is grading the area and sanitary sewer pipe and material arrived on site. 3-25-24 BR Contractor is grading the area. 3-29-24 BR Contractor started working on 2nd construction entrance for future SE Cape Drive road 4-1-24 BR Contractor is grading the area. 4-18-24 BR No work being done do to weather conditions. 4-22-24 BR Contractor started blasting section between MH A-2 to MH A-3. 4-24-24 BR Contractor continue blasting section between MH A-3 to MH A-5 4-29-24 BR No work being done on site do to weather. 5-6-24 BR No work being done do to weather conditions. 5-7-24 BR No work being done do to weather conditions. 5-13-24 BR No work been done do to weather conditions.
Site Visit Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
03/06/2024
3-4-24 BR Contractor is work on the grading the area. 6-27-24 Dustin A, working on storm 7-2-24 BR No work is being done do to site is to wet do to rain events.
Storm Sewer Construction Inspection Partial 7/8/2024 7/8/2024 07/08/2024
Misc
Informational
03/21/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 7-8-24 PS ESS setting storm line 2900, storm boxes 2910, 2911 set with 30" HDPE placed. Excavating for install of boxes 2912 and 2913 today
Water Line - Construction Inspection Partial 8/5/2024 8/5/2024 08/05/2024
Misc
Informational
07/29/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 7-30-24 DA Contractor (ESS) installed 300' of 8'' water line from fire hydrant at STA. 2+17 to STA. 5+00 to 8'' gate valve. 7-31-24 DA Contractor (ESS) installed 400' of 8'' water line from 8'' gate valve to STA. 8+00 to fire hydrant. 8-1-24 BR Contractor (ESS) installed 500' of 8'' water line to 8'' gate valve at STA. 14+40. 8-2-24 BR Contractor (ESS) installed 330' of 8'' water line to fire hydrant at STA. 17.74. 8-5-24 BR Contractor (ESS) installed 300' of 8'' water line on line 3 from STA. 0+68 - STA. 3+00 at fire hydrant. 2nd crew installed 200' of 8'' water line on line 2 from STA. 12+00 - STA. 14+00 at 8x8 tee & fire hydrant.
Water Line - Construction Inspection Partial 8/7/2024 8/7/2024 08/07/2024
Misc
Informational
08/06/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed.
Sanitary Sewer - Air Test Passed 09/09/2024
Misc
Informational
08/23/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 8-22-24 Dustin A, MH B2-B3,K2-K3L3-L4 PASS B12-B13 FAIL 09/09/24 Monday JMJ air test passed B12-B13.
Water Line - Construction Inspection Partial 9/9/2024 9/9/2024 09/09/2024
Misc
Informational
08/07/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project.
Sanitary Sewer - Mandrel Passed 9/9/2024 9/9/2024 09/09/2024
Misc
Informational
08/27/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed 8-27-24 Dustin A, Mandrel B3-B2,B1-B2,A10-b1,K2-K3,L3-L4, and A3-A4 Passed * inverts A3 and K3 failed, needs fixed 09/09/24 Monday JMJ Mandrel passed for B12 to B13.
Water Line - Hydrostatic Test Passed 9/10/2024 9/10/2024 09/10/2024
Misc
Informational
09/10/2024
9-10-24 BR Contractor preformed a hydrostatic test on water line 1 & 2 which is the 1st 4000 line installed. Both water line pass ready for chlorination & disinfection
Water Line - Coliform Test 1 Passed 9/13/2024 9/13/2024 09/16/2024
Misc
Informational
09/13/2024
9-13-24 BR 1st coliform 4 spot samples was taken on water line 1 & line 2. 9-16-24 BR 1st coliform test samples was pass.
Sanitary Sewer - Mandrel Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/26/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed 8-27-24 Dustin A, Mandrel B3-B2,B1-B2,A10-b1,K2-K3,L3-L4, and A3-A4 Passed * inverts A3 and K3 failed, needs fixed 9-16-24 BR Inverts are fixed on MH A-3 & MH K-3.
Sanitary Sewer - Mandrel Passed 8/26/2024 8/26/2024 09/16/2024
Misc
Informational
08/26/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed
Sanitary Sewer - Air Test Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/22/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 8-22-24 Dustin A, MH B2-B3,K2-K3L3-L4 PASS B12-B13 FAIL 9-16-24 BR MH B-12 & MH B-13 pass
Sanitary Sewer - Air Test Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/21/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 9-16-24 BR MH A-1 pass
Sanitary Sewer - Air Test Passed 8/20/2024 8/20/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed
Sanitary Sewer - Air Test Passed 8/19/2024 8/19/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed and on MH A-3 pass
Sanitary Sewer - Mandrel Passed 8/23/2024 8/23/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed
Sanitary Sewer - Mandrel Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 9-16-24 BR MH A-3 & MH A-4 pass.
Sanitary Sewer - Vacuum Passed 8/27/2024 8/27/2024 09/16/2024
Misc
Informational
08/23/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL 8-27-24 Dustin A, B3,B2, G1 and L3 Passed
Sanitary Sewer - Vacuum Passed 8/22/2024 8/22/2024 09/16/2024
Misc
Informational
08/22/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL
Sanitary Sewer - Vacuum Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/21/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 9-16-24 BR MH A-13 & MH A-11 pass
Sanitary Sewer - Vacuum Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 9-16-24 BR MH A-7 & MH A-11 pass.
Sanitary Sewer - Vacuum Passed 8/19/2024 8/19/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass..
Sanitary Sewer - Vacuum Passed 09/16/2024
Misc
Informational
08/27/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL 8-27-24 Dustin A, B3,B2, G1 and L3 Passed
Storm Sewer Construction Inspection Partial 9/18/2024 9/18/2024 09/18/2024
Misc
Informational
03/21/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 3-25-24 BR Contractor is breaking rock and digging to get to depth to install box inlet 3801. 6-10-24 BR Contractor (ESS) installed 50' of 36'' HDPE pipe from pond to storm box #2201 and installed storm box #2201 structure. 6-11-24- BR Contractor (ESS) installed 300' of 30'' HDPE pipe to storm box #2204. Storm box #2022, 2023, & 2024 boxes structure are installed. 6-12-24 BR Contractor (ESS) installed 100' of 30'' HDPE pipe to storm box #2205 and structure is installed. Also contractor installed 160' of 15'' HDPE pipe to storm box #2206 and structure is installed. 6-13-24 BR Contractor (ESS) installed 275' of 15'' HDPE pipe from storm box #2206 to storm box #2208. Storm box #2208 structure is installed. 6-17-24 BR Contractor (ESS) installed 110' of 36'' HDPE pipe from storm box #2900 to storm box #2902. Storm boxes structures installed box #2900, box #2901, & box #2902. Contractor installed 110' of 15'' HDPE pipe from storm box #3600 to storm box #3602. Storm boxes structures installed box#3600, box#3601, & box#3602 6-18-24 BR Contractor (ESS) installed 230' of 36'' HDPE pipe from storm box#2902 to storm box#2904. Storm boxes structures installed box#2903 & box#2904. 6-19-24 BR Contractor (ESS) 1st crew installed 120' of 15' RCP from storm box#2208 to storm box#2209 and box#2209 structure is installed. 2nd crew installed 150' of 36'' HDPE from storm box#2904 to storm box#2905, also installed 110' of 30'' HDPE from storm box#2905 to storm box#2906. 6-20-24 BR Contractor (ESS) installed 210' of 15'' HDPE pipe from storm box#2209 to storm box#2210 and storm box#2210 structure is installed. 6-24-24 BR 1st crew (ESS) installed 200' of 48' RCP pipe with storm boxes #102,103, & 104 structure installed. 2nd crew installed 110' of 36'' HDPE pipe from storm box#2905 to storm box#2906 with box#2906 structure installed. 6-25-24 BR 1st crew (ESS) installed 120' of 30'' HDPE pipe from storm box#2906. Storm boxes# 2907,2908, & 2909 structures are installed. 2nd crew installed 150' of 42'' HDPE pipe from storm box#104. Storm boxes# 105 & 106 structures are installed. 7-10-24 BR 1st crew (ESS) installed 210' of 42'' RCP pipe from storm box#104 to storm box#106. Also storm box#105, box#106 structure is installed. 2nd crew installed 170' of 30'' HDPE pipe from storm box#2913 to storm box#2914. Storm box#2914 structure is installed. 7-11-24 BR Contractor (ESS) installed 220' of 30'' HDPE pipe & 24'' HDPE pipe from storm box#2914 to storm box#2916. Storm box#2915, storm box#2916 structure is installed. 7-12-24 BR 1st crew (ESS) installed 280' of 24'' HDPE pipe & 18'' HDPE pipe from storm box#2916 to storm box#2920. Storm boxes #2917, #2918, #2919, & #2920 structures installed. 2nd crew installed 250' of 36'' HDPE of pipe from storm box#106 to storm box#108. Storm boxes #107 & #108 structures are installed. 7-15-24 BR 1st crew (ESS) installed 300' of 18'' HDPE pipe from storm box#2920 to storm box#2925. Storm boxes #2921, #2922, #2923, #2924, & #2925 structure is installed. 2nd crew installed 220' 42'' HDPE pipe from storm box#106 to storm box#108 with storm box#107, & box#108 structure installed. 7-17-24 BR 1st crew (ESS) installed 275' of 36'' HDPE pipe from storm box #1005 to storm box #1008 with storm boxes #1005, #1006, #1007, & #1008 structure installed. 2nd crew installed 200' of 30'' HDPE pipe from storm box#1801 to storm box#1802. 7-18-24 BR Contractor (ESS) installed 220' of 36' HDPE pipe from storm bx #1802 to storm box#1803 with storm box#1803 structure installed. 7-19-24 BR Contractor (ESS) installed 210' of 36' HDPE pipe from storm box#1803 to storm box#1804 with storm box#1804 structure installed. 9-18-24 BR Contractor (ESS) installed 40' of 15'' RCP pipe from storm box #2203 to storm box # 2401 with both structures installed.
Water Line - Coliform Test 2 Passed 9/16/2024 9/16/2024 09/18/2024
Misc
Informational
09/16/2024
9-16-24 BR 2nd coliform 4 spot samples was taken on water line 1 & line 2. 9-18-24 BR 2nd coliform test came back with pass for water line 1 & line 2.
Water Line - Construction Inspection Partial 9/19/2024 9/19/2024 09/19/2024
Misc
Informational
07/29/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed 300' of 8'' main on line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 8-9-24 BR Contractor (ESS) 1st crew installed 400' of 8'' main on line 13. 2nd crew installed 300' of 8'' main on line 2 STA. 11+00 - STA, 7+00. 8-16-24 BR Contactor (ESS) 400' of 8'' main on line 5 from STA. 0+00 - STA. 4+00. 2nd crew installed 500' of 8'' main on line 2 from STA. 19+00 - STA. 22+00. 8-26-24 BR Contractor (ESS) started excavation on SE Baylie Rd for the existing 16'' water main location for boring under road for 8'' water main connection. 8-27-24 BR Contractor (ESS) installed 300' of 8'' main on line 2 from STA. 6+00 to STA. 3+00. 8-28-24 BR Contractor (ESS) installed 230' of 8'' main on line 2 from STA. 3+00 to STA. 1+00. 2nd crew installed 300' of 8'' main on line 4 from STA. 0+00 - STA. 3+00. Boring contractor started and excavated 30' of pipe under SE Bailey Rd. 8-29-24 BR Contractor (ESS) installed 150' of 8'' main on line 4 from STA. 3+00 - Sta. 5+00 and connected to 8'' main on line 3. Boring contractor excavated 10' of pipe under SE Bailey Rd to reach other side of road. 9-6-24 BR Contractor (ESS) preformed water tie-in at STA. 0+00 with installed 16x8 tee and 8'' & 16'' values on existing 16'' water main at STA. 0+00 on line 1. Also contractor installed 150' of 8'' water main on line 1 from STA. 2+00 to STA. 0+00. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project. 9-11-24 BR Contractor (ESS) preformed chlorination/disinfection test on water line 1 & line 2 which was successful pass. 9-12-24 BR Contractor (ESS) working on final flushing water line 1 & line 2 for water samples. 9-19-24 BR Contractor (ESS) installed 100' of 8'' water main connecting water line 13 to water line 3, water line 2 to water line 3, water line 4 to water line 3, & water line 1 to water line 3.
Water Line - Hydrostatic Test Passed 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
9-26-24 BR Contractor preformed hydrostatic test on remainder water line 13, line 3, & line 2 to LS specification pass. Ready for chlorination.
Pavement-Proof Roll Passed 10/10/2024 10/10/2024 10/10/2024
Misc
Informational
10/10/2024
10-10-24 BR Contractor preformed a poof roll on SE Cape Dr., SE Bailey Farms PKWY, SE Ranchland St., SE Sweet Root Dr., SE Rising Sun Dr.
Sanitary Sewer Construction Inspection Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
04/17/2024
3-20-24 BR Contractor (ESS) core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 3-27-24 BR Contractor (ESS) installed 50' of 12'' DIP from existing manhole to creek. 3-28-24 BR Contractor (ESS) installed 50' of 12'' DIP pipe to MH A-1. Contractor also installed concrete encasement on 12'' DIP that laying under creek grade. MH A-1 was installed and set. 4-3-24 BR Contractor (ESS) installed a invert in existing MH for new 12'' DIP line in existing MH. 4-10-24 BR Contractor(EES) installed MH B-1 and laid 50' of 10'' PVC. KCTE ( Kansas City Testing & Engineering) is the 3rd party contractor testing compaction. 4-11-24 BR Contractor (ESS) installed 100' of 12'' DIP from MH A-1 to MH A-2. There was no encasement installed on 12'' DIP crossing country 16'' water main by approval from City engineer stated 6 inches clearance we are ok in terms of structural integrity. 4-12-24 BR Contractor (ESS) installed 150' of 10'' PVC from MH A-2. 4-15-24 BR Contractor (ESS) installed 50' of 10'' PVC from MH B-2. 4-16-24 BR MH B-2 the barrel is damage and needs to be replace. 4-17-24 BR MH B-2 barrel was replace with new barrel. Also contractor installed 40' of 10'' PVC to MH B-3. 4-24-24 BR Contractor (ESS) installed 50' of 10'' PVC going to MH A-3. 4-30-24 BR Contractor (ESS) installed 100' of 10'' PVC from STA. 3+00 going to MH A-3. 5-1-24 BR Contractor (ESS) installed 100' of 10'' PVC to MH A-3. Also MH A-3 structure installed. 5-9-24 BR Contractor (ESS) installed 100' of 10'' PVC to MH A-3. 5-10-24 BR Contractor(ESS) installed 100' of 10'' PVC to MH A-4. MH A-4 structure installed. 5-14-24 BR Contractor (ESS) installed 50' of 10'' PVC to MH A-5 and install MH A-5 structure. Also contractor installed 25' of 8'' PVC out of MH A-3. 5-15-24 JMJ Contractor (ESS) installed MH C-1 structure and installed 50' to MH C-1. 5-16-24 BR Contractor(ESS) installed 225' of 8'' PVC to MH C-2 and installed MH C-2 structure. Contractor installed 50' of 8' PVC to MH C-3 structure. 5-17-24 BR Contractor (ESS) installed 150' of 10'' PVC from MH A-5 to MH A-6 and installed MH A-6 structure. 5-20-24 BR Contractor (ESS) installed 100' of 10'' PVC from MH A-6 to MH A-7. MH A-7 structure is installed. 5-21-24 BR Contractor (ESS) installed 110' of 10'' PVC from MH A-7 to MH A-8. MH A-8 structure is installed. 5-22-24 BR Contractor (ESS) installed 100' of 8'' PVC from MH A-8 heading to MH D-1. 5-23-24 BR Contractor (EES) installed 110' of services wye from MH A-8. 5-24-24 BR Contractor (ESS) installed 200' of 8' PVC pipe to MH D-1. MH D-1 structure is installed. 5-27-24 BR Contractor (ESS) installed 200' of 10' PVC pipe MH A-9. MH A-9 structure is installed. 5-30-24 BR Contractor (ESS) installed 100' of 10'' PVC pipe out of MH A-9. 6-3-24 BR Contractor (ESS) installed 210' of 10'' PVC pipe to MH A-10 and 150' of service wye. 6-4-24 BR Contractor (ESS) installed 80' of 10'' PVC pipe from MH A-10 and installed MH A-10 structure. 2nd crew installed 125' of 8'' PVC pipe from MH A-9 heading to MH E-1. 6-5-24 BR 1st crew installed 200' of 8'' PVC pipe from MH A-11. 2nd crew installed 150' of 8'' PVC pipe to MH E-1 with 60' of service wyes installed. MH E-1 structure is installed. 6-6-24 BR 1st crew installed MH A-11 structure and 125' of 8'' PVC from MH A-11 with 60' of service wyes installed. 2nd crew installed 150' of 8'' PVC pipe heading to MH K-3. 6-10-24 BR Contractor (ESS) 1st crew installed 50' of 8'' PVC pipe to MH A-11 and MH A-11 structure is installed. 2nd crew installed 25' of 8'' PVC pipe heading to MH K-3. 6-11-24 BR Contractor (ESS) 1st crew installed 250' of 8'' PVC pipe heading to MH A-13. MH A-12 structure is installed. 2nd crew installed 50' of 8'' PVC to MH K-3 and installed structure. Also 2nd crew installed 150' of 8'' PVC pipe from MH L-3 to MH L-4 both structures is installed along with 50' of service wyes. 6-12-24 BR Contractor (ESS) 1st crew installed 250' of 8'' PVC pipe from MH A-12 to MH A13 and structure is installed. 2nd crew installed 200' of 8'' PVC pipe form MH B-12 heading to MH B-13. MH B-12 structure is installed. 6-13-24 BR Contractor (ESS) 1st crew installed 220' of 8'' PVC pipe from MH A-12 to MH G-1. MH G-1 structure is installed. 2nd crew installed 150' of 8'' PVC pipe to MH B-13 and structure is installed. 6-18-24 BR Contractor (ESS) installed 150' of 10'' PVC pipe from MH A-10 to MH B-1. 6-20-24 BR Contractor (ESS) installed 110' of 8'' PVC to MH B-1. Also installed 60' of 8'' PVC pipe heading to MH F-1. 6-21-24 BR Contractor (ESS) installed 100' of 8'' PVC pipe heading to MH F-1. Also MH A-10 cone the rim of MH is damage and needs to be replace for MH A-10. 6-24-24 BR Contractor (ESS) installed 110' of 8'' PVC pipe to MH F-1 and installed MH F-1 structure. 6-25-24 BR Contractor (ESS) has installed all sanitary sewer on Manor section 30 days has been started. 9-10-24 BR Spoke with contractor about concreting the transport hooks with concrete before city water dept can preformed there test. 10-7-24 BR Manhole C-2 is damage to risers do to street crew installing aggregate base for road and damaging MH C-2 and vacuum test needs to be preformed. 10-17-24 BR Contractor fix damage risers and retested vacuum test pass.
Sidewalk Inspection Partial 11/7/2024 11/7/2024 11/07/2024
Misc
Informational
11/07/2024
11-6-24 BR Contractor (ESS) formed up sidewalk and aggregate is place and compacted on 5 panels at corner of SE Bailey & SE Brownfield Dr. ready for concrete. 11-7-24 BR Sidewalk is constructed to LS specification at corner of SE Bailey & SE Brownfield Dr. passed.
Pavement-Stabilized Subgrade Passed 9/30/2024 9/30/2024 11/08/2024
Misc
Informational
09/26/2024
9-26-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Cape Dr. 9-30-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Bailey Farms PKWY.
Pavement-Surface Partial 11/21/2024 11/21/2024 11/21/2024
Misc
Informational
11/08/2024
11-8-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on Bailey Farms PKWY & SE Cape Dr. with 3rd party inspector (Ideker Inc.) getting 93 - 96 compaction. 11-15-24 BR Contractor installed reminder 5'' of KCMMB A-3 asphalt base on SE Cape Dr. with 3rd party inspector (Ideker Inc.) getting 94 - 96 compaction. 11-21-24 BR Contractor poured concrete on SE Cape Dr. entrance with 9'' of 4k KCMMB mix.
Pavement-Curb Construction Passed 11/21/2024 11/21/2024 12/04/2024
Misc
Informational
10/21/2024
10-21-24 BR Contractor poured concrete curbs on SE Cape Dr., SE , SE Ranchland St., Falling Star Dr., SE Sweet Root Dr., SE Rising Sun Dr. 10-28-24 BR Contractor have to correct several storm boxes before pouring more concrete do to storm boxes are to high and need to be cut down to meet curb level. 11-20-24 BR Contractor formed up curbs on SE Cape Dr. entrance with aggregate and compacted. Ready for concrete. 11-21-24 BR Contractor poured cubs on SE Cape Dr. entrance with 4k KCMMB mix. 12-3-24 BR All curb and gutters are installed.
Sanitary Sewer - Camera Test Passed 11/18/2024 12/04/2024
Misc
Informational
11/18/2024
11-15-24 BR Camera test was done by LS water dept. waiting on there results.
Sanitary Sewer - Camera Test Passed 12/18/2024 12/04/2024
Misc
Informational
11/18/2024
11-15-24 BR Camera test was done by LS water dept. waiting on there results.
Erosion Control Inspection Partial 3/4/2025 3/4/2025 03/04/2025
Misc
Informational
02/22/2024
2-20-24 BR Erosion control is partially working need to add more silt fence on Ranson Rd side of the property. 2-22-24 BR Erosion control is up and working order. 2-29-24 BR Erosion control is up and working order. 3-8-24 BR Erosion control is up and working order. 3-15-24 BR Erosion control is up and working order. 3-20-24 BR Erosion control is up and working order 3-25-24 BR Erosion control is up and working order. 4-3-24 BR Erosion control is up and working order. 4-10-24 BR Erosion control is up and working order. 4-15-24 BR Erosion control is up and working order. 4-23-24 BR Erosion control is up and working order. 5-2-24 BR Erosion control is up and working order. 5-6-24 BR Erosion control is up and working order. 5-15-24 BR Erosion control is up and working order. 5-21-24 BR Erosion control is up and working order. 5-23-24 BR Grass needs to be trim on SE Ranson Rd due to grass has covered up silt fence. 6-3-24 BR Erosion control is up and working order grass has been trim to a acceptable height. 6-21-24 BR Erosion control is up and working order. 6-26-24 BR Erosion control is up and working order. 7-3-34 BR Erosion control is up and working order. 7-10-24 BR Erosion control is up and working order. 7-17-24 BR Erosion control is up and working order. 7-27-24 BR Erosion control is up and working order. 8-5-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 8-15-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 8-29-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 9-26-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 10-7-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 10-23-24 BR Erosion control is up and working order. 11-4-24 BR Erosion control is up and working order. 11-15-24 BR Erosion control is up and working order. 11-20-24 BR Erosion control is up and working order. 12-2-24 BR Erosion control is up and working order. 1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order.
Documents & Images
Date Uploaded File Type Document Name
12/15/2023 Receipt Receipt for transaction: 2023-009134
06/30/2022 Engineers Estimate 21-130-EOPC(REV3) Sealed MANOR WATER
12/14/2023 Approved Plans WATER - STAMPED CONSTRUCTION PLANS
12/14/2023 Activity Document FeeWorksheetManorBaileyWater
12/14/2023 Activity Document FeeWorksheetSanitaryManorBailey1st
12/14/2023 Approved Plans SANITARY - STAMPED CONSTRUCTION PLANS
05/19/2022 Engineers Estimate 21-130-EOPC(REV2) Sealed
12/14/2023 Activity Document FeeWorksheetManorBailey1stStreetStorm
05/19/2022 Engineers Estimate 21-130-EOPC(REV2) MANOR MASS GRADINGSealed
06/02/2022 Activity Document FEEWORKSHEETESCManorMassGrading0
12/14/2023 Approved Plans ESC AND MASS GRADING - STAMPED CONSTRUCTION PLANS
12/14/2023 Plans old no longer valid STAMPED CONSTRUCTION PLANS MANOR STREET AND STORM
12/14/2023 Engineers Estimate 21-130-Manor Cost Estimate(REV4)
01/19/2024 Letter DE-Permit
02/20/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/07/2024 Letter INSPECTION SUMMARY
03/08/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/14/2024 Approved Plans APPROVED PLANS FEB 2024
03/18/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/01/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/24/2024 Letter INSPECTION SUMMARY
04/24/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/07/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/10/2024 Letter INSPECTION SUMMARY
05/13/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/24/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/20/2024 Letter INSPECTION SUMMARY
06/20/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home