Summary


PRSUBD20222424
Public Infrastructure
Final Acceptance
CLAYTON PROPERTIES GROUP, INC
DEVELOPMENT COMPLETE
FULL DEVELOPMENT OF A 65 LOT SINGLE FAMILY SUBDIVISION
06/02/2022
01/19/2024
08/06/2025
Locations
Address
1513 SE FALLING STAR DR, LEES SUMMIT, MO 64081

Address
1509 SE FALLING STAR DR, LEES SUMMIT, MO 64081

Address
1405 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1409 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1413 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1416 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1412 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1408 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1404 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1324 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1320 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1316 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1312 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1308 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1304 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1309 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1313 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1317 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1508 SE FALLING STAR DR, LEES SUMMIT, MO 64081

Address
1512 SE FALLING STAR DR, LEES SUMMIT, MO 64081

Address
1517 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1513 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1509 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1505 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1232 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1228 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1224 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1220 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1216 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1212 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1208 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1204 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1142 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1138 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1134 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1130 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1126 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1122 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1105 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1109 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1113 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1117 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1121 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1131 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1141 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Address
1508 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1512 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1516 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1520 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1521 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1517 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1513 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1509 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1505 SE SWEET ROOT DR, LEES SUMMIT, MO 64081

Address
1504 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1508 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1508 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1512 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1512 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1516 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1516 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1513 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1509 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1505 SE RISING SUN DR, LEES SUMMIT, MO 64081

Address
1504 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1508 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1512 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1516 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1451 SE BAILEY FARMS PKWY, LEES SUMMIT, MO 64081

Address
1420 SE RANSON RD, LEES SUMMIT, MO 64081

Property
337011

Property
337012

Property
337013

Property
337019

Property
337020

Property
337021

Property
337022

Property
337023

Property
337024

Property
337025

Property
337026

Property
337027

Property
337028

Property
337029

Property
337030

Property
337031

Property
337032

Property
337033

Property
337034

Property
337035

Property
337036

Property
337037

Property
337038

Property
337039

Property
337040

Property
337041

Property
337042

Property
337043

Property
337044

Property
337045

Property
337046

Property
337047

Property
337048

Property
337049

Property
337050

Property
337051

Property
337052

Property
337053

Property
337054

Property
337055

Property
337056

Property
337057

Property
337058

Property
337059

Property
337060

Property
337061

Property
337062

Property
337063

Property
337064

Property
337065

Property
337066

Property
337067

Property
337069

Property
337070

Property
337071

Property
337072

Property
337073

Property
337074

Property
337075

Property
337076

Property
337077

Property
337078

Property
337079

Property
337080

Property
337081

Property
337082

Property
337083

Property
337084

Address
1100 SE RANCHLAND ST, LEES SUMMIT, MO 64081

Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Anthony Nosbush, Address:140 Walnut, Ste 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/02/2022 01/19/2024
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2023
Sanitary Sewer Insp Fees $26,927.46 $26,927.46 Paid 12/15/2023
Water Insp Fee $22,887.00 $22,887.00 Paid 12/15/2023
Water Test Fee $1,400.00 $1,400.00 Paid 12/15/2023
Storm Sewer Inspection Fee $39,463.65 $39,463.65 Paid 12/15/2023
Paved Surface Inspection Fee $48,230.91 $48,230.91 Paid 12/15/2023
Site Grading Fee $7,914.00 $7,914.00 Paid 12/15/2023
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 05/07/2024
Misc
Informational
03/06/2024
3-4-24 BR Contractor is work on the grading the area. 3-7-24 BR No work being done do to weather conditions. 3-11-24 BR Contractor is grading the area. 3-13-24 BR Contractor is grading the area. 3-18-24 BR Contractor is grading the area and sanitary sewer pipe and material arrived on site. 3-25-24 BR Contractor is grading the area. 3-29-24 BR Contractor started working on 2nd construction entrance for future SE Cape Drive road 4-1-24 BR Contractor is grading the area. 4-18-24 BR No work being done do to weather conditions. 4-22-24 BR Contractor started blasting section between MH A-2 to MH A-3. 4-24-24 BR Contractor continue blasting section between MH A-3 to MH A-5 4-29-24 BR No work being done on site do to weather. 5-6-24 BR No work being done do to weather conditions. 5-7-24 BR No work being done do to weather conditions. 5-13-24 BR No work been done do to weather conditions.
Site Visit Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
03/06/2024
3-4-24 BR Contractor is work on the grading the area. 6-27-24 Dustin A, working on storm 7-2-24 BR No work is being done do to site is to wet do to rain events.
Water Line - Construction Inspection Partial 8/5/2024 8/5/2024 08/05/2024
Misc
Informational
07/29/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 7-30-24 DA Contractor (ESS) installed 300' of 8'' water line from fire hydrant at STA. 2+17 to STA. 5+00 to 8'' gate valve. 7-31-24 DA Contractor (ESS) installed 400' of 8'' water line from 8'' gate valve to STA. 8+00 to fire hydrant. 8-1-24 BR Contractor (ESS) installed 500' of 8'' water line to 8'' gate valve at STA. 14+40. 8-2-24 BR Contractor (ESS) installed 330' of 8'' water line to fire hydrant at STA. 17.74. 8-5-24 BR Contractor (ESS) installed 300' of 8'' water line on line 3 from STA. 0+68 - STA. 3+00 at fire hydrant. 2nd crew installed 200' of 8'' water line on line 2 from STA. 12+00 - STA. 14+00 at 8x8 tee & fire hydrant.
Water Line - Construction Inspection Partial 8/7/2024 8/7/2024 08/07/2024
Misc
Informational
08/06/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed.
Sanitary Sewer - Air Test Passed 09/09/2024
Misc
Informational
08/23/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 8-22-24 Dustin A, MH B2-B3,K2-K3L3-L4 PASS B12-B13 FAIL 09/09/24 Monday JMJ air test passed B12-B13.
Water Line - Construction Inspection Partial 9/9/2024 9/9/2024 09/09/2024
Misc
Informational
08/07/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project.
Sanitary Sewer - Mandrel Passed 9/9/2024 9/9/2024 09/09/2024
Misc
Informational
08/27/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed 8-27-24 Dustin A, Mandrel B3-B2,B1-B2,A10-b1,K2-K3,L3-L4, and A3-A4 Passed * inverts A3 and K3 failed, needs fixed 09/09/24 Monday JMJ Mandrel passed for B12 to B13.
Water Line - Hydrostatic Test Passed 9/10/2024 9/10/2024 09/10/2024
Misc
Informational
09/10/2024
9-10-24 BR Contractor preformed a hydrostatic test on water line 1 & 2 which is the 1st 4000 line installed. Both water line pass ready for chlorination & disinfection
Water Line - Coliform Test 1 Passed 9/13/2024 9/13/2024 09/16/2024
Misc
Informational
09/13/2024
9-13-24 BR 1st coliform 4 spot samples was taken on water line 1 & line 2. 9-16-24 BR 1st coliform test samples was pass.
Sanitary Sewer - Mandrel Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/26/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed 8-27-24 Dustin A, Mandrel B3-B2,B1-B2,A10-b1,K2-K3,L3-L4, and A3-A4 Passed * inverts A3 and K3 failed, needs fixed 9-16-24 BR Inverts are fixed on MH A-3 & MH K-3.
Sanitary Sewer - Mandrel Passed 8/26/2024 8/26/2024 09/16/2024
Misc
Informational
08/26/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed 8-26-24 Dustin A, mandrel A3-A2 / Passed
Sanitary Sewer - Air Test Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/22/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 8-22-24 Dustin A, MH B2-B3,K2-K3L3-L4 PASS B12-B13 FAIL 9-16-24 BR MH B-12 & MH B-13 pass
Sanitary Sewer - Air Test Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/21/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed 8-21-24 Dustin A, air tests on A1-EX,A10-B1,B1-B2 Pass 9-16-24 BR MH A-1 pass
Sanitary Sewer - Air Test Passed 8/20/2024 8/20/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed and on MH A-3 pass 8-20-24 Dustin A, air tests on A6-A7,A7-A8,A8-D1,A8-A-9,A9-A10,A10-F1A10-A11,A11-A12,A12-G1 Passed
Sanitary Sewer - Air Test Passed 8/19/2024 8/19/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed and on MH A-3 pass
Sanitary Sewer - Mandrel Passed 8/23/2024 8/23/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 8-23-24 Dustin A, mandrel tests on A8-A7,A9-A8,A8-D1,A9-A10,A9-E1,A10-F1,A13-A12,A12-G1,A12-A11,A11-A10 Passed
Sanitary Sewer - Mandrel Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-3 to MH A-4 failed Contractor preformed test on MH A-4 to MH A-5 pass.. 9-16-24 BR MH A-3 & MH A-4 pass.
Sanitary Sewer - Vacuum Passed 8/27/2024 8/27/2024 09/16/2024
Misc
Informational
08/23/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL 8-27-24 Dustin A, B3,B2, G1 and L3 Passed
Sanitary Sewer - Vacuum Passed 8/22/2024 8/22/2024 09/16/2024
Misc
Informational
08/22/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL
Sanitary Sewer - Vacuum Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/21/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 9-16-24 BR MH A-13 & MH A-11 pass
Sanitary Sewer - Vacuum Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 9-16-24 BR MH A-7 & MH A-11 pass.
Sanitary Sewer - Vacuum Passed 8/19/2024 8/19/2024 09/16/2024
Misc
Informational
08/19/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass..
Sanitary Sewer - Vacuum Passed 09/16/2024
Misc
Informational
08/27/2024
8-19-24 BR Contractor preformed test on MH A-4 pass. Also preformed test on MH A-5 pass.. 8-20-24 Dustin A, MH A-7 Fail, MH A-8, D-1,A-9,A-10,F-1 Passed, A-11 Fail, 8-21-24 Dustin A, A13-fail, C1-pass,C2-pass,C3-pass,A2-pass, A2-pass, B1-pass 8-22-24 Dustin A, MH A3,A11,A13,A7,K3,K2B13 PASS B3, L3 FAIL 8-27-24 Dustin A, B3,B2, G1 and L3 Passed
Water Line - Coliform Test 2 Passed 9/16/2024 9/16/2024 09/18/2024
Misc
Informational
09/16/2024
9-16-24 BR 2nd coliform 4 spot samples was taken on water line 1 & line 2. 9-18-24 BR 2nd coliform test came back with pass for water line 1 & line 2.
Water Line - Hydrostatic Test Passed 9/26/2024 9/26/2024 09/26/2024
Misc
Informational
09/26/2024
9-26-24 BR Contractor preformed hydrostatic test on remainder water line 13, line 3, & line 2 to LS specification pass. Ready for chlorination.
Pavement-Proof Roll Passed 10/10/2024 10/10/2024 10/10/2024
Misc
Informational
10/10/2024
10-10-24 BR Contractor preformed a poof roll on SE Cape Dr., SE Bailey Farms PKWY, SE Ranchland St., SE Sweet Root Dr., SE Rising Sun Dr.
Sanitary Sewer Construction Inspection Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
04/17/2024
3-20-24 BR Contractor (ESS) core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 3-27-24 BR Contractor (ESS) installed 50' of 12'' DIP from existing manhole to creek. 3-28-24 BR Contractor (ESS) installed 50' of 12'' DIP pipe to MH A-1. Contractor also installed concrete encasement on 12'' DIP that laying under creek grade. MH A-1 was installed and set. 4-3-24 BR Contractor (ESS) installed a invert in existing MH for new 12'' DIP line in existing MH. 4-10-24 BR Contractor(EES) installed MH B-1 and laid 50' of 10'' PVC. KCTE ( Kansas City Testing & Engineering) is the 3rd party contractor testing compaction. 4-11-24 BR Contractor (ESS) installed 100' of 12'' DIP from MH A-1 to MH A-2. There was no encasement installed on 12'' DIP crossing country 16'' water main by approval from City engineer stated 6 inches clearance we are ok in terms of structural integrity. 4-12-24 BR Contractor (ESS) installed 150' of 10'' PVC from MH A-2. 4-15-24 BR Contractor (ESS) installed 50' of 10'' PVC from MH B-2. 4-16-24 BR MH B-2 the barrel is damage and needs to be replace. 4-17-24 BR MH B-2 barrel was replace with new barrel. Also contractor installed 40' of 10'' PVC to MH B-3. 4-24-24 BR Contractor (ESS) installed 50' of 10'' PVC going to MH A-3. 4-30-24 BR Contractor (ESS) installed 100' of 10'' PVC from STA. 3+00 going to MH A-3. 5-1-24 BR Contractor (ESS) installed 100' of 10'' PVC to MH A-3. Also MH A-3 structure installed. 5-9-24 BR Contractor (ESS) installed 100' of 10'' PVC to MH A-3. 5-10-24 BR Contractor(ESS) installed 100' of 10'' PVC to MH A-4. MH A-4 structure installed. 5-14-24 BR Contractor (ESS) installed 50' of 10'' PVC to MH A-5 and install MH A-5 structure. Also contractor installed 25' of 8'' PVC out of MH A-3. 5-15-24 JMJ Contractor (ESS) installed MH C-1 structure and installed 50' to MH C-1. 5-16-24 BR Contractor(ESS) installed 225' of 8'' PVC to MH C-2 and installed MH C-2 structure. Contractor installed 50' of 8' PVC to MH C-3 structure. 5-17-24 BR Contractor (ESS) installed 150' of 10'' PVC from MH A-5 to MH A-6 and installed MH A-6 structure. 5-20-24 BR Contractor (ESS) installed 100' of 10'' PVC from MH A-6 to MH A-7. MH A-7 structure is installed. 5-21-24 BR Contractor (ESS) installed 110' of 10'' PVC from MH A-7 to MH A-8. MH A-8 structure is installed. 5-22-24 BR Contractor (ESS) installed 100' of 8'' PVC from MH A-8 heading to MH D-1. 5-23-24 BR Contractor (EES) installed 110' of services wye from MH A-8. 5-24-24 BR Contractor (ESS) installed 200' of 8' PVC pipe to MH D-1. MH D-1 structure is installed. 5-27-24 BR Contractor (ESS) installed 200' of 10' PVC pipe MH A-9. MH A-9 structure is installed. 5-30-24 BR Contractor (ESS) installed 100' of 10'' PVC pipe out of MH A-9. 6-3-24 BR Contractor (ESS) installed 210' of 10'' PVC pipe to MH A-10 and 150' of service wye. 6-4-24 BR Contractor (ESS) installed 80' of 10'' PVC pipe from MH A-10 and installed MH A-10 structure. 2nd crew installed 125' of 8'' PVC pipe from MH A-9 heading to MH E-1. 6-5-24 BR 1st crew installed 200' of 8'' PVC pipe from MH A-11. 2nd crew installed 150' of 8'' PVC pipe to MH E-1 with 60' of service wyes installed. MH E-1 structure is installed. 6-6-24 BR 1st crew installed MH A-11 structure and 125' of 8'' PVC from MH A-11 with 60' of service wyes installed. 2nd crew installed 150' of 8'' PVC pipe heading to MH K-3. 6-10-24 BR Contractor (ESS) 1st crew installed 50' of 8'' PVC pipe to MH A-11 and MH A-11 structure is installed. 2nd crew installed 25' of 8'' PVC pipe heading to MH K-3. 6-11-24 BR Contractor (ESS) 1st crew installed 250' of 8'' PVC pipe heading to MH A-13. MH A-12 structure is installed. 2nd crew installed 50' of 8'' PVC to MH K-3 and installed structure. Also 2nd crew installed 150' of 8'' PVC pipe from MH L-3 to MH L-4 both structures is installed along with 50' of service wyes. 6-12-24 BR Contractor (ESS) 1st crew installed 250' of 8'' PVC pipe from MH A-12 to MH A13 and structure is installed. 2nd crew installed 200' of 8'' PVC pipe form MH B-12 heading to MH B-13. MH B-12 structure is installed. 6-13-24 BR Contractor (ESS) 1st crew installed 220' of 8'' PVC pipe from MH A-12 to MH G-1. MH G-1 structure is installed. 2nd crew installed 150' of 8'' PVC pipe to MH B-13 and structure is installed. 6-18-24 BR Contractor (ESS) installed 150' of 10'' PVC pipe from MH A-10 to MH B-1. 6-20-24 BR Contractor (ESS) installed 110' of 8'' PVC to MH B-1. Also installed 60' of 8'' PVC pipe heading to MH F-1. 6-21-24 BR Contractor (ESS) installed 100' of 8'' PVC pipe heading to MH F-1. Also MH A-10 cone the rim of MH is damage and needs to be replace for MH A-10. 6-24-24 BR Contractor (ESS) installed 110' of 8'' PVC pipe to MH F-1 and installed MH F-1 structure. 6-25-24 BR Contractor (ESS) has installed all sanitary sewer on Manor section 30 days has been started. 9-10-24 BR Spoke with contractor about concreting the transport hooks with concrete before city water dept can preformed there test. 10-7-24 BR Manhole C-2 is damage to risers do to street crew installing aggregate base for road and damaging MH C-2 and vacuum test needs to be preformed. 10-17-24 BR Contractor fix damage risers and retested vacuum test pass.
Pavement-Stabilized Subgrade Passed 9/30/2024 9/30/2024 11/08/2024
Misc
Informational
09/26/2024
9-26-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Cape Dr. 9-30-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Bailey Farms PKWY.
Pavement-Curb Construction Passed 11/21/2024 11/21/2024 12/04/2024
Misc
Informational
10/21/2024
10-21-24 BR Contractor poured concrete curbs on SE Cape Dr., SE , SE Ranchland St., Falling Star Dr., SE Sweet Root Dr., SE Rising Sun Dr. 10-28-24 BR Contractor have to correct several storm boxes before pouring more concrete do to storm boxes are to high and need to be cut down to meet curb level. 11-20-24 BR Contractor formed up curbs on SE Cape Dr. entrance with aggregate and compacted. Ready for concrete. 11-21-24 BR Contractor poured cubs on SE Cape Dr. entrance with 4k KCMMB mix. 12-3-24 BR All curb and gutters are installed.
Sanitary Sewer - Camera Test Passed 11/18/2024 12/04/2024
Misc
Informational
11/18/2024
11-15-24 BR Camera test was done by LS water dept. waiting on there results.
Sanitary Sewer - Camera Test Passed 12/18/2024 12/04/2024
Misc
Informational
11/18/2024
11-15-24 BR Camera test was done by LS water dept. waiting on there results.
Erosion Control Inspection Partial 3/4/2025 3/4/2025 03/04/2025
Misc
Informational
02/22/2024
2-20-24 BR Erosion control is partially working need to add more silt fence on Ranson Rd side of the property. 2-22-24 BR Erosion control is up and working order. 2-29-24 BR Erosion control is up and working order. 3-8-24 BR Erosion control is up and working order. 3-15-24 BR Erosion control is up and working order. 3-20-24 BR Erosion control is up and working order 3-25-24 BR Erosion control is up and working order. 4-3-24 BR Erosion control is up and working order. 4-10-24 BR Erosion control is up and working order. 4-15-24 BR Erosion control is up and working order. 4-23-24 BR Erosion control is up and working order. 5-2-24 BR Erosion control is up and working order. 5-6-24 BR Erosion control is up and working order. 5-15-24 BR Erosion control is up and working order. 5-21-24 BR Erosion control is up and working order. 5-23-24 BR Grass needs to be trim on SE Ranson Rd due to grass has covered up silt fence. 6-3-24 BR Erosion control is up and working order grass has been trim to a acceptable height. 6-21-24 BR Erosion control is up and working order. 6-26-24 BR Erosion control is up and working order. 7-3-34 BR Erosion control is up and working order. 7-10-24 BR Erosion control is up and working order. 7-17-24 BR Erosion control is up and working order. 7-27-24 BR Erosion control is up and working order. 8-5-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 8-15-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 8-29-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 9-26-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 10-7-24 BR Need to repair missing section of silt fence on SE Ranson Rd. 10-23-24 BR Erosion control is up and working order. 11-4-24 BR Erosion control is up and working order. 11-15-24 BR Erosion control is up and working order. 11-20-24 BR Erosion control is up and working order. 12-2-24 BR Erosion control is up and working order. 1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order.
Storm Sewer Construction Inspection Passed 9/18/2024 9/18/2024 04/01/2025
Misc
Informational
03/21/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 3-25-24 BR Contractor is breaking rock and digging to get to depth to install box inlet 3801. 6-10-24 BR Contractor (ESS) installed 50' of 36'' HDPE pipe from pond to storm box #2201 and installed storm box #2201 structure. 6-11-24- BR Contractor (ESS) installed 300' of 30'' HDPE pipe to storm box #2204. Storm box #2022, 2023, & 2024 boxes structure are installed. 6-12-24 BR Contractor (ESS) installed 100' of 30'' HDPE pipe to storm box #2205 and structure is installed. Also contractor installed 160' of 15'' HDPE pipe to storm box #2206 and structure is installed. 6-13-24 BR Contractor (ESS) installed 275' of 15'' HDPE pipe from storm box #2206 to storm box #2208. Storm box #2208 structure is installed. 6-17-24 BR Contractor (ESS) installed 110' of 36'' HDPE pipe from storm box #2900 to storm box #2902. Storm boxes structures installed box #2900, box #2901, & box #2902. Contractor installed 110' of 15'' HDPE pipe from storm box #3600 to storm box #3602. Storm boxes structures installed box#3600, box#3601, & box#3602 6-18-24 BR Contractor (ESS) installed 230' of 36'' HDPE pipe from storm box#2902 to storm box#2904. Storm boxes structures installed box#2903 & box#2904. 6-19-24 BR Contractor (ESS) 1st crew installed 120' of 15' RCP from storm box#2208 to storm box#2209 and box#2209 structure is installed. 2nd crew installed 150' of 36'' HDPE from storm box#2904 to storm box#2905, also installed 110' of 30'' HDPE from storm box#2905 to storm box#2906. 6-20-24 BR Contractor (ESS) installed 210' of 15'' HDPE pipe from storm box#2209 to storm box#2210 and storm box#2210 structure is installed. 6-24-24 BR 1st crew (ESS) installed 200' of 48' RCP pipe with storm boxes #102,103, & 104 structure installed. 2nd crew installed 110' of 36'' HDPE pipe from storm box#2905 to storm box#2906 with box#2906 structure installed. 6-25-24 BR 1st crew (ESS) installed 120' of 30'' HDPE pipe from storm box#2906. Storm boxes# 2907,2908, & 2909 structures are installed. 2nd crew installed 150' of 42'' HDPE pipe from storm box#104. Storm boxes# 105 & 106 structures are installed. 7-10-24 BR 1st crew (ESS) installed 210' of 42'' RCP pipe from storm box#104 to storm box#106. Also storm box#105, box#106 structure is installed. 2nd crew installed 170' of 30'' HDPE pipe from storm box#2913 to storm box#2914. Storm box#2914 structure is installed. 7-11-24 BR Contractor (ESS) installed 220' of 30'' HDPE pipe & 24'' HDPE pipe from storm box#2914 to storm box#2916. Storm box#2915, storm box#2916 structure is installed. 7-12-24 BR 1st crew (ESS) installed 280' of 24'' HDPE pipe & 18'' HDPE pipe from storm box#2916 to storm box#2920. Storm boxes #2917, #2918, #2919, & #2920 structures installed. 2nd crew installed 250' of 36'' HDPE of pipe from storm box#106 to storm box#108. Storm boxes #107 & #108 structures are installed. 7-15-24 BR 1st crew (ESS) installed 300' of 18'' HDPE pipe from storm box#2920 to storm box#2925. Storm boxes #2921, #2922, #2923, #2924, & #2925 structure is installed. 2nd crew installed 220' 42'' HDPE pipe from storm box#106 to storm box#108 with storm box#107, & box#108 structure installed. 7-17-24 BR 1st crew (ESS) installed 275' of 36'' HDPE pipe from storm box #1005 to storm box #1008 with storm boxes #1005, #1006, #1007, & #1008 structure installed. 2nd crew installed 200' of 30'' HDPE pipe from storm box#1801 to storm box#1802. 7-18-24 BR Contractor (ESS) installed 220' of 36' HDPE pipe from storm bx #1802 to storm box#1803 with storm box#1803 structure installed. 7-19-24 BR Contractor (ESS) installed 210' of 36' HDPE pipe from storm box#1803 to storm box#1804 with storm box#1804 structure installed. 9-18-24 BR Contractor (ESS) installed 40' of 15'' RCP pipe from storm box #2203 to storm box # 2401 with both structures installed.
Sanitary Sewer Construction Inspection Passed 04/01/2025
Misc
Informational
03/20/2024
3-20-24 BR Contractor core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 4-8-24 RH. Contractor started placing MH A-10. Hole was dug while on site.
Storm Sewer Construction Inspection Passed 7/8/2024 7/8/2024 04/01/2025
Misc
Informational
03/21/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 7-8-24 PS ESS setting storm line 2900, storm boxes 2910, 2911 set with 30" HDPE placed. Excavating for install of boxes 2912 and 2913 today
Water Line - Construction Inspection Passed 4/1/2025 4/1/2025 04/01/2025
Misc
Informational
07/29/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed 300' of 8'' main on line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 8-9-24 BR Contractor (ESS) 1st crew installed 400' of 8'' main on line 13. 2nd crew installed 300' of 8'' main on line 2 STA. 11+00 - STA, 7+00. 8-16-24 BR Contactor (ESS) 400' of 8'' main on line 5 from STA. 0+00 - STA. 4+00. 2nd crew installed 500' of 8'' main on line 2 from STA. 19+00 - STA. 22+00. 8-26-24 BR Contractor (ESS) started excavation on SE Baylie Rd for the existing 16'' water main location for boring under road for 8'' water main connection. 8-27-24 BR Contractor (ESS) installed 300' of 8'' main on line 2 from STA. 6+00 to STA. 3+00. 8-28-24 BR Contractor (ESS) installed 230' of 8'' main on line 2 from STA. 3+00 to STA. 1+00. 2nd crew installed 300' of 8'' main on line 4 from STA. 0+00 - STA. 3+00. Boring contractor started and excavated 30' of pipe under SE Bailey Rd. 8-29-24 BR Contractor (ESS) installed 150' of 8'' main on line 4 from STA. 3+00 - Sta. 5+00 and connected to 8'' main on line 3. Boring contractor excavated 10' of pipe under SE Bailey Rd to reach other side of road. 9-6-24 BR Contractor (ESS) preformed water tie-in at STA. 0+00 with installed 16x8 tee and 8'' & 16'' values on existing 16'' water main at STA. 0+00 on line 1. Also contractor installed 150' of 8'' water main on line 1 from STA. 2+00 to STA. 0+00. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project. 9-11-24 BR Contractor (ESS) preformed chlorination/disinfection test on water line 1 & line 2 which was successful pass. 9-12-24 BR Contractor (ESS) working on final flushing water line 1 & line 2 for water samples. 9-19-24 BR Contractor (ESS) installed 100' of 8'' water main connecting water line 13 to water line 3, water line 2 to water line 3, water line 4 to water line 3, & water line 1 to water line 3. 3-29-25 BR/NS Contractor (ESS) connected new 8'' water main to ex. 8'' water main to finalize connection.
Sidewalk Inspection Partial 4/3/2025 4/3/2025 04/03/2025
Misc
Informational
11/07/2024
11-6-24 BR Contractor (ESS) formed up sidewalk and aggregate is place and compacted on 5 panels at corner of SE Bailey & SE Brownfield Dr. ready for concrete. 11-7-24 BR Sidewalk is constructed to LS specification at corner of SE Bailey & SE Brownfield Dr. passed. 3-31-25 JMJ/BR Contractor framed up and place aggerate with compacted and poured concrete on ADA section. 4-3-25 BR Contractor has poured and installed 60% ADA sections through out sub division.
Pavement-Surface Passed 11/21/2024 11/21/2024 04/15/2025
Misc
Informational
11/08/2024
11-8-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on Bailey Farms PKWY & SE Cape Dr. with 3rd party inspector (Ideker Inc.) getting 93 - 96 compaction. 11-15-24 BR Contractor installed reminder 5'' of KCMMB A-3 asphalt base on SE Cape Dr. with 3rd party inspector (Ideker Inc.) getting 94 - 96 compaction. 11-21-24 BR Contractor poured concrete on SE Cape Dr. entrance with 9'' of 4k KCMMB mix. 4-11-25 BR Contractor installed 2'' of KCMMB A-3 asphalt surface on Bailey Farms PKWY & SE Cape Dr. with 3rd party inspector (Kansas City Testing & Engineering.) getting 94% compaction.
Erosion Control Inspection Failed 04/29/2025
Misc
Corrective Action Required
04/29/2025
4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed.
Sanitary Sewer - Camera Test Partial 5/1/2025 05/01/2025
Misc
Informational
05/01/2025
5-1-25 RH. Sanitary has been inspected by water department and list has been sent to emery sapp.
Pavement-Curb Construction Passed 05/07/2025
Misc
Informational
10/21/2024
10-21-24 BR Contractor poured concrete curbs on SE Cape Dr., SE , SE Ranchland St., Falling Star Dr., SE Sweet Root Dr., SE Rising Sun Dr.
Pavement-Stabilized Subgrade Passed 05/07/2025
Misc
Informational
09/26/2024
9-26-24 BR Contractor (Seal o Matic) is working on stabilizing subgrade on SE Cape Dr.
Sanitary Sewer Construction Inspection Passed 05/07/2025
Misc
Informational
04/08/2024
3-20-24 BR Contractor core drill into exiting sewer manhole and plug hole were new 12'' DIP will connect into existing manhole. 4-8-24 RH. Contractor started placing MH A-10. Hole was dug while on site.
Pavement-Surface Passed 05/07/2025
Misc
Informational
11/08/2024
11-8-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on Bailey Farms PKWY & SE Cape Dr.
Sanitary Sewer - Camera Test Passed 6/2/2025 05/07/2025
Misc
Informational
05/01/2025
5-1-25 RH. Sanitary has been inspected by water department and list has been sent to emery sapp.
Water Line - Construction Inspection Passed 05/07/2025
Misc
Informational
09/09/2024
7-29-24 BR Contractor (ESS) installed fire hydrant at STA. 2+17 to 200' south on SE Bailey PKWY. 08-06-24 JMJ Contractor (ESS) installed line #2 STA 12+50 to 6+41, line #4 STA 0+00 to 0+60 crossing. 08-07-24 JMJ Contractor continued on installation on line #2 & #3 approximately 250' of water was done at 1:00PM. Backing blocks were poured behind fitting tees installed. 09/09/24 Monday JMJ Contractor (ESS) poured straddle blocks line #1 & #6 and backing blocks at various locations through the project.
Water Line - Coliform Test 2 Passed 05/07/2025
Misc
Informational
09/16/2024
9-16-24 BR 2nd coliform 4 spot samples was taken on water line 1 & line 2.
Water Line - Coliform Test 1 Passed 05/07/2025
Misc
Informational
09/13/2024
9-13-24 BR 1st coliform 4 spot samples was taken on water line 1 & line 2.
Storm Sewer Construction Inspection Passed 05/07/2025
Misc
Informational
07/08/2024
3-20-24 BR Contractor installed 100' of 30'' HDPE line of 3800 - 3801. 7-8-24 PS ESS setting storm line 2900, storm boxes 2910, 2911 set with 30" HDPE placed. Excavating for install of boxes 2912 and 2913 today
Site Visit Complete 05/07/2025
Misc
Informational
06/27/2024
3-4-24 BR Contractor is work on the grading the area. 6-27-24 Dustin A, working on storm
Sidewalk Inspection Passed 05/07/2025
Misc
Informational
11/07/2024
11-6-24 BR Contractor (ESS) formed up sidewalk and aggregate is place and compacted on 5 panels at corner of SE Bailey & SE Brownfield Dr. ready for concrete. 11-7-24 BR Sidewalk is constructed to LS specification at corner of SE Bailey & SE Brownfield Dr. passed.
Record Drawing Review Passed 5/22/2025 05/22/2025
Misc
Informational
05/22/2025
No changes that I can see or aware of.
Erosion Control Inspection Passed 08/06/2025
Misc
Resolved
08/06/2025
4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed. 08/06/25 Jamie S, Erosion control is established and in compliance with city standards.
Grading/Excavation/Fill Inspection Passed 08/06/2025
Misc
Informational
08/06/2025
08/06/25 Jamie S, Grading is done per construction plans.
Install Street and Stop Signs Passed 08/06/2025
Misc
Informational
08/06/2025
08/06/25 Jamie S, Street Signs have been installed and in compliance with city standards.
Documents & Images
Date Uploaded File Type Document Name
12/15/2023 Receipt Receipt for transaction: 2023-009134
06/30/2022 Engineers Estimate 21-130-EOPC(REV3) Sealed MANOR WATER
12/14/2023 Approved Plans WATER - STAMPED CONSTRUCTION PLANS
12/14/2023 Activity Document FeeWorksheetManorBaileyWater
12/14/2023 Activity Document FeeWorksheetSanitaryManorBailey1st
12/14/2023 Approved Plans SANITARY - STAMPED CONSTRUCTION PLANS
05/19/2022 Engineers Estimate 21-130-EOPC(REV2) Sealed
12/14/2023 Activity Document FeeWorksheetManorBailey1stStreetStorm
05/19/2022 Engineers Estimate 21-130-EOPC(REV2) MANOR MASS GRADINGSealed
06/02/2022 Activity Document FEEWORKSHEETESCManorMassGrading0
12/14/2023 Approved Plans ESC AND MASS GRADING - STAMPED CONSTRUCTION PLANS
12/14/2023 Plans old no longer valid STAMPED CONSTRUCTION PLANS MANOR STREET AND STORM
12/14/2023 Engineers Estimate 21-130-Manor Cost Estimate(REV4)
01/19/2024 Letter DE-Permit
02/20/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/07/2024 Letter INSPECTION SUMMARY
03/08/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/14/2024 Approved Plans APPROVED PLANS FEB 2024
03/18/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/01/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/24/2024 Letter INSPECTION SUMMARY
04/24/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/07/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/10/2024 Letter INSPECTION SUMMARY
05/13/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/24/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/20/2024 Letter INSPECTION SUMMARY
06/20/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/15/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter INSPECTION SUMMARY
05/06/2025 Single passing sample tie-in location
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/15/2025 Plans 2025_05_14_21-130 WATER As Builts
05/15/2025 Plans 2025_05_14_21-130 SAN As Builts
05/15/2025 Plans 2025_14_05_21-130-SS As Builts
05/19/2025 Letter DE-Certificate of Substantial Completion Single Lot
05/19/2025 Letter DE-Punch List
05/22/2025 Letter INSPECTION SUMMARY
06/11/2025 Security Document Bailey Farms - Manor Bond
07/02/2025 Security Document MANOR AFFIDAVITS
08/06/2025 Letter INSPECTION SUMMARY
08/06/2025 Letter INSPECTION SUMMARY
08/06/2025 Letter INSPECTION SUMMARY
08/06/2025 Letter SUBD Cert of Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home