Summary


PRSUBD20216450
Public Infrastructure
Issued
CLAYTON PROPERTIES GROUP INC
DEVELOPMENT COMPLETE
CORNERSTONE AT BAILEY FARMS 1ST PLAT 38 LOT SINGLE FAMILY DEVELOPMENT
12/21/2021
01/19/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Anthony Nosbush, Address:140 Walnut, Ste 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/21/2021 01/19/2024
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $5,858.10 $5,858.10 Paid 12/15/2023
9110072-Water Test Fee $1,200.00 $1,200.00 Paid 12/15/2023
9110068-Storm Fee $10,634.85 $10,634.85 Paid 12/15/2023
9110081-Street Inspections $8,192.34 $8,192.34 Paid 12/15/2023
9110071-Site Grading Fee $5,667.90 $5,667.90 Paid 12/15/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2023
91100C8-Sanitary Sewer Insp Fees $9,974.25 $9,974.25 Paid 12/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary - Material Verification Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Stabilized Subgrade Pending
Punch List Inspection Pending
Grading/Excavation/Fill Inspection Pending
Pavement-Curb Construction Pending
Misc
Informational
10/23/2024
10-22-24 BR Contractor poured concrete curbs on SE Silo St., SE Cronin St., & SE Windbreak Dr.
Pavement-Surface Pending
Misc
Informational
11/12/2024
11-12-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on SE Silo St., SE Windbreak Dr., SE Cronin St. with 3rd party inspector (Ideker Inc.) getting 94 - 96 compaction.
Water Line - Construction Inspection Pending
Misc
Informational
01/17/2025
9-17-24 BR Contractor (ESS) installed 200' of 8'' water main at STA. 16+00 - Sta. 17+00, Sta. 9+00 - Sta. 11+00 on line 11, Sta. 4+00 - Sta. 5+13 on line 7, Sta. 6+00 - Sta. 7+00 on line 9. 1-17-25 BR Contractor preformed a chlorination/disinfection on entire water line. Chlorin is retain in water line for 24 hours.
Water Line - Hydrostatic Test Pending
Erosion Control Inspection Pending
Misc
Informational
03/04/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order.
Water Line - Coliform Test 2 Pending
Grading/Excavation/Fill Inspection Partial 05/01/2024
Misc
Informational
05/01/2024
5-1-24 BR Contractor started grading the area for detention/BMP area.
Sanitary Sewer - Mandrel Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test MH B-9 / MH B-8 , MH B-8 / MH L1, MH B-8 / MH B-7, MH B-7 / MH B-6, MH B-6 / MH K-1 pass MH K-1 / MH K-2, MH B-4 / MH J-1 failed 9-17-24 BR Contractor (ESS) test MH B-4 / MH B-3 failed 9-18-24 BR Contractor (ESS) test MH B-4 to MH B-3 pass 9-25-24 BR Contractor (ESS) test MH K-1 to MH K-2, MH K-2 to MH K-3 pass. 10-17-24 BR Contractor (ESS) test MH B-4 / MH J-1 pass.
Sanitary Sewer - Air Test Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test on MH B-9 / MH B-8 , MH B-8 / MH L1, MH B-8 / MH B-7 pass 9-17-24 BR Contractor (ESS) test MH B-7 / MH B-6, MH B-6 / MH K-1, MH B-6 / MH B-5, MH B-5 / MH B-4 pass. MH J-1 / MH B-4, MH B-4 / MH B-3, MH K-1/ MH K-2 fail 10-17-24 BR Contractor (ESS) test MH J-1 / MH B-4, MH B-4 / MH B-3, MH K-1 / MH K-2 pass.
Sanitary Sewer - Vacuum Passed 9/17/2024 9/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test MH B-9, MH L-1 pass MH B-8, MH J-1 failed 9-17-24 BR Contractor (ESS) test MH B-7, MH B-6, MH B-4 pass MH B-5 failed 10-17-24 BR Contractor (ESS) test MH J-1, MH B-5, MK K-1 pass MH K-2 pass.
Pavement-Proof Roll Passed 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
11/12/2024
11-8-24 BR Contractor preformed a poof roll on SE Silo St., SE Windbreak Dr., SE Cronin St.
Pavement-Surface Partial 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
11/12/2024
11-12-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on SE Silo St., SE Windbreak Dr., SE Cronin St. with 3rd party inspector (Ideker Inc.) getting 94 - 96 compaction.
Pavement-Curb Construction Passed 10/28/2024 10/28/2024 12/04/2024
Misc
Informational
10/23/2024
10-22-24 BR Contractor poured concrete curbs on SE Silo St., SE Cronin St., & SE Windbreak Dr. 10-28-24 BR Contractor have to correct several storm boxes before pouring more concrete do to storm boxes are to high and need to be cut down to meet curb level. 12-3-24 BR All curb and gutters installed.
Sanitary Sewer Construction Inspection Passed 7/25/2024 7/25/2024 12/04/2024
Misc
Informational
04/16/2024
4-16-24 BR Contractor installed MH B-4. 4-17-24 BR Contractor installed 200' of 10'' PVC to MH B-4. 4-22-24 BR Contractor installed 100' of 8'' PVC from MH B-4. 4-23-24 BR Contractor installed 100' of 8'' PVC to MH J-1 and installed MH J-1 structure 5-15-24 JMJ The Seth crew (ESS) installed MH C-1 and installed approximately 65' of 8" PVC Matt crew were installing 10" PVC from MH A-5 approximately 100'. Contractor plan to pour invert for at least three manholes. Contractor were in a heavy amount of rock. 5-20-24 BR Contractor installed 80' of 10'' PVC from MH B-4. 5-21-24 BR Contractor installed 30' of 10'' PVC pipe to MH B-5. MH B-5 structure is installed. Contractor were in a heavy amount of rock. 5-27-24 BR Contractor (ESS) installed 150' of 10'' PVC pipe to MH B-6. MH B-6 structure is installed. 5-29-24 BR Contractor (ESS) installed 150' of 8'' PVC pipe to MH K-1. 5-30-24 BR Contractor (ESS) installed MH K-1 structure and 2 service wyes. 6-3-24 BR Contractor (ESS) installed 150' of 8'' PVC pipe from MH K-1 and 110' of service wyes. 6-4-24 BR Contractor (ESS) installed 200' of 8'' PVC pipe to MH K-2 and 55' of service wyes. 6-5-24 BR Contractor (ESS) installed MH K-2 structure and 100' of service wyes. 7-22-24 BR Contractor (ESS) installed 200' of 8'' PVC pipe from MH B-6 to MH B-7 with MH B-7 structure installed. 7-24-24 DA Contractor (ESS) installed 300' of 8'' PVC pipe from MH B-7 to MH B-8 with MH B-8 structure installed. 7-25-24 BR Contractor (ESS) installed 330' of 8'' PVC pipe from MH B-8 to MH B-9 with MH B-9 structure installed. 2nd crew installed 170' of 8'' PVC pipe from MH B-9 to MH L-1 with structure MH L-1 installed.
Storm Sewer Construction Inspection Passed 7/29/2024 7/29/2024 12/04/2024
Misc
Informational
06/25/2024
6-25-24 BR Contractor (ESS) installed 150' of 36'' HDPE pipe from storm box#1000 to storm box#1002. Storm boxes# 1000, 1001, & 1002 structures are installed. 7-10-24 BR Contractor (ESS) installed 210' of 36'' HDPE pipe from storm box#1002 to storm box#1003. Storm box #1003 structure is installed. 7-11-24 BR Contractor (ESS) installed 220' of 36'' HDPE pipe from storm box#1003 to storm box#1005. Storm box#1004, storm box#1005 structure are installed. Also they installed 50' of 15'' HDPE pipe from storm box#1003 to storm box#1101 with storm box#1101 structure installed. 7-12-24 BR Contractor (ESS) installed 50' of 36'' HDPE pipe from storm box#1005 to storm box#1006. Storm box#1006 structure is installed. 7-24-24 DA Contractor (ESS) installed 210' of 24'' HDPE pipe from storm structure #700 to storm box #702 with storm boxes #701, box #702 installed. 7-25-24 BR Contractor (ESS) installed 200' of 18'' HDPE pipe from storm bx #702 to storm bx #704 with storm boxes #703, box #704 structure installed. 7-29-24 BR Contractor (ESS) installed 220' of 18'' HDPE pipe form storm box #703 to storm box #802 with storm boxes structure installed.
Water Line - Construction Inspection Passed 12/5/2024 12/5/2024 12/09/2024
Misc
Informational
09/17/2024
9-17-24 BR Contractor (ESS) installed 200' of 8'' water main at STA. 16+00 - Sta. 17+00, Sta. 9+00 - Sta. 11+00 on line 11, Sta. 4+00 - Sta. 5+13 on line 7, Sta. 6+00 - Sta. 7+00 on line 9. 9-18-24 BR Contractor (ESS) installed 420' of 8'' water main on line 11 from Sta. 11+00 - Sta. 15+00. Also contractor poured backing blocks on all tee's and fire hydrant assembly. 12-2-24 BR Contractor (ESS) installed 320' of 8'' water main on line 6 from Sta. 3+20 - Sta. 0+00. Also fire hydrant at Sta. 2+03 is installed. 12-3-24 BR Contractor (ESS) installed 300' of 8'' water main on line 6 from Sta. 3+20 - Sta. 6+00 with fire hydrant assembly installed. 12-4-24 BR Contractor (ESS) installed 400' of 8'' water main on line 7 from Sta. 0+00 - Sta. 4+87 with fire hydrant assembly installed. 12-5-24 BR Contractor (ESS) installed 350' of 8'' water main on line 11 from Sta. 14+00 - Sta. 10+00. 12-9-24 BR All water connection is complete ready for pressure test.
Water Line - Hydrostatic Test Passed 1/2/2025 1/2/2025 01/02/2025
Misc
Informational
01/02/2025
1-2-25 NS Contractor preformed hydrostatic test on Cornerstone section water main to LS specifications pass.
Water Line - Construction Inspection Passed 1/17/2025 1/17/2025 01/22/2025
Misc
Informational
09/17/2024
9-17-24 BR Contractor (ESS) installed 200' of 8'' water main at STA. 16+00 - Sta. 17+00, Sta. 9+00 - Sta. 11+00 on line 11, Sta. 4+00 - Sta. 5+13 on line 7, Sta. 6+00 - Sta. 7+00 on line 9. 1-17-25 BR Contractor preformed a chlorination/disinfection on entire water line. Chlorin is retain in water line for 24 hours. 1-21-25 BR Contractor flushed out water main and is now ready for water samples.
Erosion Control Inspection Partial 3/4/2025 3/4/2025 03/04/2025
Misc
Informational
03/04/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order.
Water Line - Coliform Test 1 Passed 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
3-11-25 BR Contractor took 1st coliform samples. 3-13-25 BR 1st coliform samples came back negative.
Water Line - Coliform Test 2 Partial 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
3-13-25 BR Contractor took 2nd water sample for coliform test.
Documents & Images
Date Uploaded File Type Document Name
12/15/2023 Receipt Receipt for transaction: 2023-009134
12/14/2023 Approved Plans STAMPED CONSTRUCTION PLANS - Cornerstone at Bailey Farms 1st Plat - Erosion and Sediment Control and Mass Grading
12/14/2023 Activity Document FeeWorksheetMassGradingESCCornerstone1st
12/07/2023 Approved Plans WATER - STAMPED CONSTRUCTION PLANS
12/14/2023 Engineers Estimate SANITARY, STORM, PAVED SURFACE, WATER 21-136-Cornerstone Cost Estimate(REV3)
12/14/2023 Activity Document FeeWorksheetCornerstoneWater
12/14/2023 Activity Document FeeWorksheetCornerstoneSan
05/19/2022 Engineers Estimate 21-136-Cornerstone EOPC(REV2) sealed
12/14/2023 Approved Plans SANITARY - STAMPED CONSTRUCTION PLANS
12/14/2023 Approved Plans STREET, STORM AND MASS GRADING STAMPED CONSTRUCTION PLANS - CORNERSTONE
04/16/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home