Permit Application Status

PRSUBD20216450


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20216450
Public Infrastructure
Substantial Completion
CLAYTON PROPERTIES GROUP INC
DEVELOPMENT COMPLETE
CORNERSTONE AT BAILEY FARMS 1ST PLAT 38 LOT SINGLE FAMILY DEVELOPMENT
12/21/2021
01/19/2024
Locations
Address
1221 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1217 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1213 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1209 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1205 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1165 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1161 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1157 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1153 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1151 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1152 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1156 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1160 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1164 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1432 SE SILO ST, LEES SUMMIT, MO 64081

Address
1428 SE SILO ST, LEES SUMMIT, MO 64081

Address
1424 SE SILO ST, LEES SUMMIT, MO 64081

Address
1420 SE SILO ST, LEES SUMMIT, MO 64081

Address
1416 SE SILO ST, LEES SUMMIT, MO 64081

Address
1412 SE SILO ST, LEES SUMMIT, MO 64081

Address
1408 SE SILO ST, LEES SUMMIT, MO 64081

Address
1404 SE SILO ST, LEES SUMMIT, MO 64081

Address
1384 SE SILO ST, LEES SUMMIT, MO 64081

Address
1204 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1210 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1216 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1223 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1217 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1211 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1205 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1204 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1210 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1216 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1222 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1228 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1234 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1436 SE SILO ST, LEES SUMMIT, MO 64081

Address
1206 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1212 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1218 SE CRONIN ST, LEES SUMMIT, MO 64081

Address
1225 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1219 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1213 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1207 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1206 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1212 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1218 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1224 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Address
1236 SE WINDBREAK DR, LEES SUMMIT, MO 64081

Property
337447

Property
337448

Property
337449

Property
337450

Property
337451

Property
337452

Property
337453

Property
337454

Property
337455

Property
337456

Property
337457

Property
337458

Property
337459

Property
337460

Property
337461

Property
337462

Property
337463

Property
337464

Property
337465

Property
337466

Property
337467

Property
337468

Property
337469

Property
337470

Property
337471

Property
337472

Property
337473

Property
337474

Property
337475

Property
337476

Property
337477

Property
337478

Property
337479

Property
337480

Property
337481

Property
337482

Property
337483

Property
337484

Address
1380 SE SILO ST, LEES SUMMIT, MO 64081

Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Anthony Nosbush, Address:140 Walnut, Ste 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/21/2021 01/19/2024
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $5,858.10 $5,858.10 Paid 12/15/2023
Water Test Fee $1,200.00 $1,200.00 Paid 12/15/2023
Storm Sewer Inspection Fee $10,634.85 $10,634.85 Paid 12/15/2023
Paved Surface Inspection Fee $8,192.34 $8,192.34 Paid 12/15/2023
Site Grading Fee $5,667.90 $5,667.90 Paid 12/15/2023
Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2023
Sanitary Sewer Insp Fees $9,974.25 $9,974.25 Paid 12/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Install Street and Stop Signs Pending
Punch List Inspection Pending
Grading/Excavation/Fill Inspection Pending
Sidewalk Inspection Pending
Misc
Corrective Action Required
04/08/2025
4-3-25 BR Contractor installed 8 ADA sidewalk sections. 4-7-25 BR Out of 8 ADA sidewalk there are 4 ADA sidewalk section that is not in compliance.
Erosion Control Inspection Pending
Misc
Informational
05/07/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order. 4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed. 5-7-25 RH. Road was cleaned and silt socks were fixed but there is still no silt fence along any curb or sidewalk on project.
Sanitary Sewer - Mandrel Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test MH B-9 / MH B-8 , MH B-8 / MH L1, MH B-8 / MH B-7, MH B-7 / MH B-6, MH B-6 / MH K-1 pass MH K-1 / MH K-2, MH B-4 / MH J-1 failed 9-17-24 BR Contractor (ESS) test MH B-4 / MH B-3 failed 9-18-24 BR Contractor (ESS) test MH B-4 to MH B-3 pass 9-25-24 BR Contractor (ESS) test MH K-1 to MH K-2, MH K-2 to MH K-3 pass. 10-17-24 BR Contractor (ESS) test MH B-4 / MH J-1 pass.
Sanitary Sewer - Air Test Passed 10/17/2024 10/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test on MH B-9 / MH B-8 , MH B-8 / MH L1, MH B-8 / MH B-7 pass 9-17-24 BR Contractor (ESS) test MH B-7 / MH B-6, MH B-6 / MH K-1, MH B-6 / MH B-5, MH B-5 / MH B-4 pass. MH J-1 / MH B-4, MH B-4 / MH B-3, MH K-1/ MH K-2 fail 10-17-24 BR Contractor (ESS) test MH J-1 / MH B-4, MH B-4 / MH B-3, MH K-1 / MH K-2 pass.
Sanitary Sewer - Vacuum Passed 9/17/2024 9/17/2024 10/17/2024
Misc
Informational
09/17/2024
9-16-24 BR Contractor (ESS) test MH B-9, MH L-1 pass MH B-8, MH J-1 failed 9-17-24 BR Contractor (ESS) test MH B-7, MH B-6, MH B-4 pass MH B-5 failed 10-17-24 BR Contractor (ESS) test MH J-1, MH B-5, MK K-1 pass MH K-2 pass.
Pavement-Proof Roll Passed 11/12/2024 11/12/2024 11/12/2024
Misc
Informational
11/12/2024
11-8-24 BR Contractor preformed a poof roll on SE Silo St., SE Windbreak Dr., SE Cronin St.
Pavement-Curb Construction Passed 10/28/2024 10/28/2024 12/04/2024
Misc
Informational
10/23/2024
10-22-24 BR Contractor poured concrete curbs on SE Silo St., SE Cronin St., & SE Windbreak Dr. 10-28-24 BR Contractor have to correct several storm boxes before pouring more concrete do to storm boxes are to high and need to be cut down to meet curb level. 12-3-24 BR All curb and gutters installed.
Sanitary Sewer Construction Inspection Passed 7/25/2024 7/25/2024 12/04/2024
Misc
Informational
04/16/2024
4-16-24 BR Contractor installed MH B-4. 4-17-24 BR Contractor installed 200' of 10'' PVC to MH B-4. 4-22-24 BR Contractor installed 100' of 8'' PVC from MH B-4. 4-23-24 BR Contractor installed 100' of 8'' PVC to MH J-1 and installed MH J-1 structure 5-15-24 JMJ The Seth crew (ESS) installed MH C-1 and installed approximately 65' of 8" PVC Matt crew were installing 10" PVC from MH A-5 approximately 100'. Contractor plan to pour invert for at least three manholes. Contractor were in a heavy amount of rock. 5-20-24 BR Contractor installed 80' of 10'' PVC from MH B-4. 5-21-24 BR Contractor installed 30' of 10'' PVC pipe to MH B-5. MH B-5 structure is installed. Contractor were in a heavy amount of rock. 5-27-24 BR Contractor (ESS) installed 150' of 10'' PVC pipe to MH B-6. MH B-6 structure is installed. 5-29-24 BR Contractor (ESS) installed 150' of 8'' PVC pipe to MH K-1. 5-30-24 BR Contractor (ESS) installed MH K-1 structure and 2 service wyes. 6-3-24 BR Contractor (ESS) installed 150' of 8'' PVC pipe from MH K-1 and 110' of service wyes. 6-4-24 BR Contractor (ESS) installed 200' of 8'' PVC pipe to MH K-2 and 55' of service wyes. 6-5-24 BR Contractor (ESS) installed MH K-2 structure and 100' of service wyes. 7-22-24 BR Contractor (ESS) installed 200' of 8'' PVC pipe from MH B-6 to MH B-7 with MH B-7 structure installed. 7-24-24 DA Contractor (ESS) installed 300' of 8'' PVC pipe from MH B-7 to MH B-8 with MH B-8 structure installed. 7-25-24 BR Contractor (ESS) installed 330' of 8'' PVC pipe from MH B-8 to MH B-9 with MH B-9 structure installed. 2nd crew installed 170' of 8'' PVC pipe from MH B-9 to MH L-1 with structure MH L-1 installed.
Storm Sewer Construction Inspection Passed 7/29/2024 7/29/2024 12/04/2024
Misc
Informational
06/25/2024
6-25-24 BR Contractor (ESS) installed 150' of 36'' HDPE pipe from storm box#1000 to storm box#1002. Storm boxes# 1000, 1001, & 1002 structures are installed. 7-10-24 BR Contractor (ESS) installed 210' of 36'' HDPE pipe from storm box#1002 to storm box#1003. Storm box #1003 structure is installed. 7-11-24 BR Contractor (ESS) installed 220' of 36'' HDPE pipe from storm box#1003 to storm box#1005. Storm box#1004, storm box#1005 structure are installed. Also they installed 50' of 15'' HDPE pipe from storm box#1003 to storm box#1101 with storm box#1101 structure installed. 7-12-24 BR Contractor (ESS) installed 50' of 36'' HDPE pipe from storm box#1005 to storm box#1006. Storm box#1006 structure is installed. 7-24-24 DA Contractor (ESS) installed 210' of 24'' HDPE pipe from storm structure #700 to storm box #702 with storm boxes #701, box #702 installed. 7-25-24 BR Contractor (ESS) installed 200' of 18'' HDPE pipe from storm bx #702 to storm bx #704 with storm boxes #703, box #704 structure installed. 7-29-24 BR Contractor (ESS) installed 220' of 18'' HDPE pipe form storm box #703 to storm box #802 with storm boxes structure installed.
Water Line - Construction Inspection Passed 12/5/2024 12/5/2024 12/09/2024
Misc
Informational
09/17/2024
9-17-24 BR Contractor (ESS) installed 200' of 8'' water main at STA. 16+00 - Sta. 17+00, Sta. 9+00 - Sta. 11+00 on line 11, Sta. 4+00 - Sta. 5+13 on line 7, Sta. 6+00 - Sta. 7+00 on line 9. 9-18-24 BR Contractor (ESS) installed 420' of 8'' water main on line 11 from Sta. 11+00 - Sta. 15+00. Also contractor poured backing blocks on all tee's and fire hydrant assembly. 12-2-24 BR Contractor (ESS) installed 320' of 8'' water main on line 6 from Sta. 3+20 - Sta. 0+00. Also fire hydrant at Sta. 2+03 is installed. 12-3-24 BR Contractor (ESS) installed 300' of 8'' water main on line 6 from Sta. 3+20 - Sta. 6+00 with fire hydrant assembly installed. 12-4-24 BR Contractor (ESS) installed 400' of 8'' water main on line 7 from Sta. 0+00 - Sta. 4+87 with fire hydrant assembly installed. 12-5-24 BR Contractor (ESS) installed 350' of 8'' water main on line 11 from Sta. 14+00 - Sta. 10+00. 12-9-24 BR All water connection is complete ready for pressure test.
Water Line - Hydrostatic Test Passed 1/2/2025 1/2/2025 01/02/2025
Misc
Informational
01/02/2025
1-2-25 NS Contractor preformed hydrostatic test on Cornerstone section water main to LS specifications pass.
Water Line - Construction Inspection Passed 1/17/2025 1/17/2025 01/22/2025
Misc
Informational
09/17/2024
9-17-24 BR Contractor (ESS) installed 200' of 8'' water main at STA. 16+00 - Sta. 17+00, Sta. 9+00 - Sta. 11+00 on line 11, Sta. 4+00 - Sta. 5+13 on line 7, Sta. 6+00 - Sta. 7+00 on line 9. 1-17-25 BR Contractor preformed a chlorination/disinfection on entire water line. Chlorin is retain in water line for 24 hours. 1-21-25 BR Contractor flushed out water main and is now ready for water samples.
Erosion Control Inspection Partial 3/4/2025 3/4/2025 03/04/2025
Misc
Informational
03/04/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order.
Water Line - Coliform Test 1 Passed 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
3-11-25 BR Contractor took 1st coliform samples. 3-13-25 BR 1st coliform samples came back negative.
Water Line - Coliform Test 2 Passed 3/13/2025 3/13/2025 03/18/2025
Misc
Informational
03/13/2025
3-13-25 BR Contractor took 2nd water sample for coliform test. 3-17-25 BR The 2nd water sample pass.
Record Drawing Review Passed 4/7/2025 04/07/2025
Misc
Informational
04/07/2025
4-7-25 BR Water main was constructed according to plans.
Sidewalk Inspection Failed 4/8/2025 4/8/2025 04/08/2025
Misc
Corrective Action Required
04/08/2025
4-3-25 BR Contractor installed 8 ADA sidewalk sections. 4-7-25 BR Out of 8 ADA sidewalk there are 4 ADA sidewalk section that is not in compliance.
Pavement-Surface Passed 11/12/2024 11/12/2024 04/10/2025
Misc
Informational
11/12/2024
11-12-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on SE Silo St., SE Windbreak Dr., SE Cronin St. with 3rd party inspector (Ideker Inc.) getting 94% - 96% compaction. 4-9-25 BR Contractor installed 2'' of KCMMB A-2 asphalt surface on SE Silo St., SE Windbreak Dr., SE Cronin St. with 3rd party inspector (kansas city testing & engineering.) getting 95% compaction.
Grading/Excavation/Fill Inspection Passed 04/10/2025
Misc
Informational
05/01/2024
5-1-24 BR Contractor started grading the area for detention/BMP area.
Erosion Control Inspection Failed 04/29/2025
Misc
Informational
03/04/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order. 4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed.
Pavement-Surface Passed 05/07/2025
Misc
Informational
11/12/2024
11-12-24 BR Contractor installed 5'' of KCMMB A-3 asphalt base on SE Silo St., SE Windbreak Dr., SE Cronin St. with 3rd party inspector (Ideker Inc.) getting 94 - 96 compaction.
Pavement-Curb Construction Passed 05/07/2025
Misc
Informational
10/23/2024
10-22-24 BR Contractor poured concrete curbs on SE Silo St., SE Cronin St., & SE Windbreak Dr.
Erosion Control Inspection Failed 05/07/2025
Misc
Informational
04/29/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order. 4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed. 5-7-25 RH. Road was cleaned and silt socks were fixed but there is still no silt fence along any curb or sidewalk on project.
Erosion Control Inspection Failed 05/07/2025
Misc
Informational
05/07/2025
1-26-25 BR Erosion control is up and working order. 2-4-25 BR Erosion control is up and working order. 2-20-25 BR Erosion control is up and working order. 3-4-25 BR Erosion control is up and working order. 4-29-25 RH. Silt socks full and need replaced or cleaned out. No Sift fence along curbs. Mud over curbs needs cleaned. This need cleaned up immediately. Seeding will also be needed. 5-7-25 RH. Road was cleaned and silt socks were fixed but there is still no silt fence along any curb or sidewalk on project.
Documents & Images
Date Uploaded File Type Document Name
12/15/2023 Receipt Receipt for transaction: 2023-009134
12/14/2023 Approved Plans STAMPED CONSTRUCTION PLANS - Cornerstone at Bailey Farms 1st Plat - Erosion and Sediment Control and Mass Grading
12/14/2023 Activity Document FeeWorksheetMassGradingESCCornerstone1st
12/07/2023 Approved Plans WATER - STAMPED CONSTRUCTION PLANS
12/14/2023 Engineers Estimate SANITARY, STORM, PAVED SURFACE, WATER 21-136-Cornerstone Cost Estimate(REV3)
12/14/2023 Activity Document FeeWorksheetCornerstoneWater
12/14/2023 Activity Document FeeWorksheetCornerstoneSan
05/19/2022 Engineers Estimate 21-136-Cornerstone EOPC(REV2) sealed
12/14/2023 Approved Plans SANITARY - STAMPED CONSTRUCTION PLANS
12/14/2023 Approved Plans STREET, STORM AND MASS GRADING STAMPED CONSTRUCTION PLANS - CORNERSTONE
04/16/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/31/2025 Plans WATER AS-BUILT FOR REVIEW_REV 0_PL2021484
03/31/2025 Plans SANITARY AS-BUILT FOR REVIEW_REV 0_PL2021486
03/31/2025 Plans STREET AND STORM AS-BUILT FOR REVIEW_REV 0_PL2021487
04/07/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter DE-Certificate of Substantial Completion Single Lot
05/19/2025 Letter DE-Punch List
06/11/2025 Security Document Bailey Farms - Cornerstone Bond
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home