Permit Application Status

PRSUBD20214631


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20214631
Public Infrastructure
Final Acceptance
CLAYTON PROPERTIES GROUP INC
DEVELOPMENT COMPLETE
OSAGE 3RD PLAT - SUBDIVISION IMPROVEMENTS
09/03/2021
11/02/2021
07/19/2023
Locations
Address
2116 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Address
2122 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Address
3710 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3716 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3716 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3722 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3728 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3734 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3735 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3729 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3723 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3717 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3711 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
2129 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Address
2118 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Address
2124 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Address
3712 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3718 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3724 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3730 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3736 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3737 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3731 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3725 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3719 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Address
3713 SW KNOXVILLE CT, LEES SUMMIT, MO 64082

Property
69800121200000000

Property
69800060900000000

Property
69800061000000000

Property
69800061200000000

Property
69800061100000000

Property
69800061300000000

Property
69800126600000000

Property
69800126700000000

Property
69800126200000000

Property
69800126500000000

Property
69800126300000000

Property
69800126400000000

Property
69800126100000000

Property
69800126000000000

Property
69800126900000000

Property
69800125800000000

Property
69800126800000000

Property
69800125900000000

Property
69800127100000000

Property
69800127000000000

Property
69800125500000000

Property
69800125400000000

Property
69800127200000000

Property
69800127300000000

Property
69800125600000000

Property
69800125700000000

Address
2112 SW HOLDBROOKS DR, LEES SUMMIT, MO 64082

Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
EMERY SAPP CONSTRUCTION INC, Address:140 WALNUT ST  
OSAGE HOMES ASSOCIATION INC, Address:10660 BARKLEY ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/03/2021 11/01/2021
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
Site Grading Fee $2,300.90 $2,300.90 Paid 09/10/2021
Water Insp Fee $1,409.56 $1,409.56 Paid 09/10/2021
Water Test Fee $600.00 $600.00 Paid 09/10/2021
Sanitary Sewer Insp Fees $2,280.93 $2,280.93 Paid 09/10/2021
Paved Surface Inspection Fee $2,949.14 $2,949.14 Paid 09/10/2021
Storm Sewer Inspection Fee $2,503.69 $2,503.69 Paid 09/10/2021
Site Grading Fee $3,635.56 $3,635.56 Paid 09/10/2021
$5,941.46
Right of Way Permit Fee $85.00 $85.00 Paid 09/10/2021
Outstanding Fees Amount Paid Owing Date Paid
After Hours Inspections (Public Works)(Per Hour) $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 12/23/2021
Misc
Informational
02/10/2022
On 2.10.2022 Thursday No activity today On 2.28.2022 to 3.4.2022 No Activity on this site.
Erosion Control Inspection Failed 02/08/2022
Misc
Informational
02/08/2022
Erosion control measures failed. Snow melt from recent snow storms has caused muddy roads and fencing is down in some areas.
Water Line - Coliform Test 2 Passed 02/09/2022
Misc
Informational
02/04/2022
Met Dakota from ESS on site to pull 2nd Bac T samples. Dakota said there was too much snow over the water main, so we decided to wait until Monday to pull the samples. RP 2-4-22 On 2.7.2022 Monday ESS pulled 2nd water sample for coliform testing. Samples taken to Blue Valley Labs.
Water Line - Coliform Test 1 Passed 02/09/2022
Misc
Informational
02/09/2022
On Tuesday 2.1.2022 ESS collected water sample #1. Sample was taken to Keystone Labs On Wednesday 2.2.2022 Water sample passed
Storm Sewer Construction Inspection Passed 02/10/2022
Misc
Informational
12/17/2021
On Friday 12.17.2021 contractor, ESS installed storm boxes 2-2, 2-3, 2-4, and 2-5. Storm boxes 2-2 and 2-3 had concrete inverts poured.
Misc
Informational
12/21/2021
On Monday, 12-21-2021. Emery Sapp installed 126LF 0f 18” HDPE pipe for line 2 and also place CI 3-1 and back filled. On Tuesday, 12-21-2021. The contractor resumed storm sewer installation of Sanitary Sewer. Installed Line (1). Tied into existing CI moving to MH 1-2. Also placed 100 LF of 15” HDPE. On Wednesday, 12-22-2021. Emery Sapp resumed Storm Sewer installation. Contractor installed Pipe from Man Hole 1-2 to 1-3 (74’ 15” HDPE) and Structure 1-3 and back filled. Also the approved change to move MH 1-4 was approved by the city to move the structure approx 7’ short of the property line because the property owner does not want contractor on the property. The contractor installed that structure as well.
Misc
Informational
02/11/2022
On 2.11.2021 ESS installed trash rack on Water Quality 5-ft by 5-ft outlet structure
Sanitary Sewer Construction Inspection Passed 02/10/2022
Misc
Informational
12/23/2021
On Thursday, 12-23-2021. EES Excavators began installation of The final Sanitary Sewer for line #1. MH 1-4 was moved 7’ east of it original location off of proposed property line. This was submitted and approved by city staff. Contractor is installing 8” pvc sewer connecting to MH 1-3
Water Line - Construction Inspection Passed 02/10/2022
Misc
Informational
12/21/2021
On Tuesday 12-21-2021 I was given water (5) samples and took them to Blue Valley Labs for testing Field Inspection John Jackson On Thursday 12/30/21 (Contractor ESS) Installed approximately 200’ of 6” PVC (starting @ Sta 11+80) Line #2 contractor will complete after the New Year. 1/4/22 Tuesday Contractor are working to finish Line #2 ending at a cul-de-sac. 1-13-2022 Thursday ESS conducted a hydrostatic pressure test on waterline #1 and #2. Entire system held for 2 hours @ 150 psi.
Misc
Informational
02/11/2022
On 2.11.2021 ESS conducted a water tie-in.
Sanitary - Material Verification Passed 02/16/2022
Sanitary Sewer Construction Inspection Partial 02/16/2022
Misc
Informational
12/02/2021
On Monday 11/29/2021 the contractor, ESS cored into existing sanitary MH 1-1 to connect the new sanitary line installing 68 LF of 8-in PVC (SDR-26) sanitary pipe and MH 1-2. On Wednesday 12/1/2021 the contractor had installed 89 LF of 8-inch sanitary pipe and MH 1-3. On Tuesday 12.7.2021 contractor installed 9 sanitary laterals between MH 1-3 and MH 2-1 On Thursday 12.9.2021 contractor installed 11 sanitary sewer laterals between MH 1-3 and MH 1-4. On 3.17.2022 ESS had to replace manhole cones and manhole rings for MH 1-4 and MH 2-1 because of failed sanitary sewer testing failures.
Sanitary Sewer - Air Test Passed 03/18/2022
Misc
Informational
03/18/2022
On 3.16.2022 Line 1 and Line 2 passed the Pressure Test
Sanitary Sewer - Mandrel Passed 03/18/2022
Misc
Informational
03/18/2022
On 3.16.2022 Lines 1 and 2 passed the mandrel test
Water Line - Hydrostatic Test Passed 03/18/2022
Misc
Informational
03/18/2022
On 1.13.2022 hydrostatic test passed
Pavement-Stabilized Subgrade Passed 03/21/2022
Misc
Informational
03/17/2022
On 3.17.2022 Pavement stabilization applied by contractor, 1-800-ASPHALT 3.21.2022 Proofroll of pavement was conducted by contractor ESS using a 20-ton truck and passed the proofroll.
Site Visit Partial 03/25/2022
Misc
Informational
03/25/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Pavement-Curb Construction Partial 3/28/2022 (10:00) 3/28/2022 03/28/2022
Misc
Informational
03/28/2022
Started curb construction, putting down 4K KCMMB concrete curbs. Had trailer with white cure. 3/28/22 ES
Pavement-Proof Roll Partial 3/28/2022 (8:00) 3/28/2022 03/28/2022
Misc
Informational
03/21/2022
On 3.21.2022 I observed contractor, ESS conduct a proof roll of pavement chemical stabilization.
Misc
Informational
03/28/2022
**CURB** Performed proof roll for curbs with Larry from ESS. CMT had 20.92 tons on their truck. Had two small spots that needed to be compacted better. They dug out and recompacted each spot. Proof roll passed. 3/28/22 ES
Pavement-Curb Construction Partial 3/29/2022 3/29/2022 03/29/2022
Misc
Informational
03/28/2022
ESS installed all straight curbs and some storm box throats using 4K KCMMB mix concrete. White cured all laid curb. Will continue 3/29 finishing remaining storm box throats. 3/28/22 ES
Misc
Informational
03/29/2022
ESS completed pouring storm box inlets today using 4K KCMMB mix. Did not pour at box 4-1 as the box is not set properly and will need adjustment. Also cut out west side of existing storm box on south side of SW Holdbrooks Dr as it the curb/throat were set too high and needed poured to correct grade. 3/29/22 ES
Misc
Informational
04/04/2022
On 4.4.2022 Monday ESS was filling in/grading behind the curbs. Storm Boxes 2-5 and 4-1 still need adjusting/resetting.
Sanitary Sewer - Camera Test Partial 3/14/2022 04/11/2022
Misc
Informational
04/11/2022
4-11-22 AN water is doing camera testing on sewer
Site Visit Partial 04/20/2022
Misc
Informational
03/25/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
04/20/2022
No work being done. 4/20/22 ES
Pavement-Aggregate Base Passed 05/12/2022
Misc
Informational
03/17/2022
On March 17, 2022 Contractor, 1-800-ASPHALT was on site applying pavement stabilizers and rock.
Misc
Informational
03/25/2022
ESS on site grading aggregate base preparing for proof roll on 3/28/22. 3/25/22 ES
Misc
Informational
05/12/2022
On Thursday, 5-12-2022 I performed and passed a proof roll for the sub-base for this project.
Erosion Control Inspection Failed 06/01/2022
Misc
Informational
02/08/2022
Erosion control measures failed. Snow melt from recent snow storms has caused muddy roads and fencing is down in some areas.
Misc
Corrective Action Required
06/01/2022
On 6.1.2022 Wednesday ESS failed to install erosion control measures and vast amounts of mud are blocking the street.
Site Visit Partial 07/06/2022
Misc
Informational
04/20/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
04/20/2022
No work being done. 4/20/22 ES
Misc
Informational
07/06/2022
Concrete crew were-forming sidewalk and ada ramps:
Site Visit Partial 07/06/2022
Misc
Informational
07/06/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
07/06/2022
No work being done. 4/20/22 ES
Misc
Informational
07/06/2022
Concrete crew were-forming sidewalk and ada ramps: Afternoon visit no crew were on site grading still needed completed on sidewalk. 7-6-22 RH
Misc
Informational
07/11/2022
7.11.2022 Sidewalk and ADA ramps installed by JLK. DJ Retaining wall subgrade (3/4 inch rock) installed by BC Hardscapes. DJ 7.12.2022 Retaining wall is being constructed.(see photos). KC Testing is on-site I spoke with the rep and handed him my card urging he send City of Lee’s Summit the test results. 7.15.2022 Retaining Wall complete. DJ
Pavement-Curb Construction Passed 07/11/2022
Misc
Informational
03/28/2022
ESS installed all straight curbs and some storm box throats using 4K KCMMB mix concrete. White cured all laid curb. Will continue 3/29 finishing remaining storm box throats. 3/28/22 ES 7.7.2022 - 7.8.2022 ESS sub-contractor completed repair of curbs.
Sanitary Sewer - Vacuum Passed 07/11/2022
Misc
Informational
03/18/2022
On 3.16.2022 the following manholes passed the vacuum test: MH 1-2 MH 1-3 The manholes labeled MH 1-4 and 2-1 failed the vacuum test On 3.21.2022 Manholes 1-4 and 2-1 passed the vacuum test @ 10 lbs of pressure for 3 mins.
Site Visit Partial 07/18/2022
Misc
Informational
07/06/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
07/06/2022
No work being done. 4/20/22 ES
Misc
Informational
07/06/2022
Concrete crew were-forming sidewalk and ada ramps: Afternoon visit no crew were on site grading still needed completed on sidewalk. 7-6-22 RH 7-18-22 RH. Arrived on site and no work was being done for development services.
Misc
Informational
07/19/2022
7.19.2022 ESS is placing asphalt patches on on SW Holdbrooks Drive and the cul-de-sac. DJ 7.20.2022 ESS applied approximately 6.5 inches of concrete on the asphalt patches DJ 7.22.2022 KLJ Concrete installed handicap ramp on the intersection of SW Holdbrooks Drive & SW Knoxville Court. Concrete curbs were installed for the asphalt patches.
Pavement-Surface Partial 07/27/2022
Misc
Informational
05/23/2022
On 5.20.2022 Seal-O-Matic Paving Company applied 264.91 tons of asphalt surface. Testing done by CMT Testing.
Misc
Informational
07/27/2022
7.27.2022 Seal-O-Matic applied asphalt patches with 38.35 tons of APWA Type 5 V
Install Street and Stop Signs Passed 07/28/2022
Misc
Informational
07/28/2022
7.28.2022 Installed street signs
Water Line - Coliform Test 2 Passed 2/7/2022 2/7/2022 07/29/2022
Misc
Informational
02/04/2022
Met Dakota from ESS on site to pull 2nd Bac T samples. Dakota said there was too much snow over the water main, so we decided to wait until Monday to pull the samples. RP 2-4-22
Sanitary Sewer - Camera Test Passed 5/11/2022 07/29/2022
Misc
Informational
04/11/2022
4-11-22 AN water is doing camera testing on sewer
ESC - (Vegetation/Ground Cover) Partial 8/8/2022 8/8/2022 08/08/2022
Misc
Corrective Action Required
08/08/2022
8.8.2022 There isn’t inlet protection on All curb inlets and field inlets.
Site Visit Partial 08/23/2022
Misc
Informational
07/18/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
07/18/2022
No work being done. 4/20/22 ES
Misc
Informational
07/18/2022
Concrete crew were-forming sidewalk and ada ramps: Afternoon visit no crew were on site grading still needed completed on sidewalk. 7-6-22 RH 7-18-22 RH. Arrived on site and no work was being done for development services. 8-23-22 RH. No work on site today.
Site Visit Partial 09/08/2022
Misc
Informational
08/23/2022
ESS on site grading aggregate base for roadway. 3/25/22 ES
Misc
Informational
08/23/2022
No work being done. 4/20/22 ES
Misc
Informational
08/23/2022
Concrete crew were-forming sidewalk and ada ramps: Afternoon visit no crew were on site grading still needed completed on sidewalk. 7-6-22 RH 7-18-22 RH. Arrived on site and no work was being done for development services. 8-23-22 RH. No work on site today. 9-8-22 RH. Talked with ESS on site about punch list items that needed completed. ESS was filling behind curb on site.
Storm Sewer Construction Inspection Partial 10/10/2022
Misc
Informational
10/10/2022
10-10-22 RH. Detention basin fix started today by changing where the structure in the detention basin is. ESS started digging and moving the structure today.
Storm Sewer Construction Inspection Partial 10/10/2022
Misc
Informational
10/10/2022
10-10-22 RH. Detention basin fix started today by changing where the structure in the detention basin is. ESS started digging and moving the structure today. Detention basin structure was moved and aggregate began being placed around box to stop silt from filling up around structure.
Storm Sewer Construction Inspection Passed 10/10/2022
Misc
Informational
10/10/2022
10-10-22 RH. Detention basin fix started today by changing where the structure in the detention basin is. ESS started digging and moving the structure today. Detention basin structure was moved and aggregate began being placed around box to stop silt from filling up around structure. All rock was placed around structures and flow line created in detention basin to avoid washout.
Install Street and Stop Signs Passed 10/18/2022
Misc
Informational
03/09/2022
On 3.9.2022 Emery Sapp, contractor has begun grading for pavement/streets. According to Jonathan Myers, ESS PM they’re preparing to put down pavement aggregate soon, weather permitting but has no plans to work the remaining week due to impending snow and below freezing temperatures. 10-18-22 RH. Signs are installed.
Pavement-Aggregate Base Passed 10/18/2022
Misc
Informational
05/23/2022
On 5/22/2022 Seal-O-Matic Paving Company applied 471.55 tons of base asphalt. Asphalt testing is done by CMT Testing.
Pavement-Curb Construction Passed 10/18/2022
Misc
Informational
03/29/2022
ESS installed all straight curbs and some storm box throats using 4K KCMMB mix concrete. White cured all laid curb. Will continue 3/29 finishing remaining storm box throats. 3/28/22 ES
Misc
Informational
03/29/2022
ESS completed pouring storm box inlets today using 4K KCMMB mix. Did not pour at box 4-1 as the box is not set properly and will need adjustment. Also cut out west side of existing storm box on south side of SW Holdbrooks Dr as it the curb/throat were set too high and needed poured to correct grade. 3/29/22 ES
Pavement-Proof Roll Passed 10/18/2022
Misc
Informational
03/28/2022
On 3.21.2022 I observed contractor, ESS conduct a proof roll of pavement chemical stabilization.
Misc
Informational
03/28/2022
**CURB** Performed proof roll for curbs with Larry from ESS. CMT had 20.92 tons on their truck. Had two small spots that needed to be compacted better. They dug out and recompacted each spot. Proof roll passed. 3/28/22 ES
Misc
Informational
05/11/2022
On 5.11.2022 I observed ESS conducting a Proof Roll for asphalt placement using a CMT 20.69 Ton tandem truck which FAILED due to soft spots in the pavement where utility fixes had been made.
Pavement-Surface Passed 10/18/2022
Misc
Informational
07/27/2022
On 5.20.2022 Seal-O-Matic Paving Company applied 264.91 tons of asphalt surface. Testing done by CMT Testing.
Misc
Informational
07/27/2022
7.27.2022 Asphalt patches were capped with 38.35 tons of APWA Type 5 V
Grading/Excavation/Fill Inspection Passed 10/18/2022
Misc
Informational
11/18/2021
On Tuesday 11/16/2021 the contractor, ESS (Emory Sapp & Sons) began mass grading in various locations throughout the project site. On Thursday 11/18/2021 the contractor is mass grading in various locations throughout the project site 11/23/2021 Contractor is mass grading throughout the project site in various locations.
Misc
Informational
06/20/2022
On Monday 6.20.2022 ESS is excavating and grading throughout the site.
Documents & Images
Date Uploaded File Type Document Name
09/10/2021 Receipt Receipt for transaction: 2021-007261
09/10/2021 Receipt Receipt for transaction: 2021-007262
09/10/2021 Receipt Receipt for transaction: 2021-007263
09/10/2021 Receipt Receipt for transaction: 2021-007261
09/10/2021 Receipt Receipt for transaction: 2021-007265
09/13/2021 Approved Plans Osage 3rd Plat Street & Storm Plans Approved 9.13.21
09/13/2021 Approved Plans Osage 3rd Plat Sanitary Plans Approved 9.13.21
09/13/2021 Approved Plans Osage 3rd Plat Site Disturbance Plans Approved 9.13.21
11/01/2021 Approved Plans Osage 3rd Plat Water Plans Approved 11.1.21
11/02/2021 Letter DE-Permit
12/21/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
12/23/2021 Letter INSPECTION SUMMARY
12/23/2021 Letter INSPECTION SUMMARY
12/29/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
02/04/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/10/2022 Test Results for Water Sample #1
02/10/2022 Test Results for Water Sample #2
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/26/2022 K45995 In place density and moisture content
07/26/2022 K46081 In Place Density and Moisture Content tests
07/26/2022 KCTE Retaining Wall report 7.12.2022
07/26/2022 KCTE Retaining Wall report 7.14.2022
07/26/2022 R20-21-214-2022-07-7 concrete curb near intersection of SW Osage Dr & SW Clayton Place
08/05/2022 R20-21-214-2022-08-04 concrete cylinders 7.7.2022
08/23/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/13/2023 Road Sink 2
04/13/2023 Road Sink 1
04/13/2023 Road Fix 1
04/13/2023 Road Fix 2
05/01/2023 Letter INSPECTION SUMMARY
05/19/2023 Letter DE-Certificate of Substantial Completion Single Lot
05/19/2023 Osage 3rd Plat Substantial Completion
05/19/2023 Osage 3rd Plat Final Punch List
05/26/2023 Maintenance Bond - Osage 3rd Plat
06/19/2023 Osage 3rd Plat Final Affidavit and Agreement
07/19/2023 Letter DE-Certificate of Final Acceptance (Commercial)
07/19/2023 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home