Permit Application Status

PRSUBD20193057


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20193057
Public Infrastructure
Final Acceptance
METCALF BANK
DEVELOPMENT COMPLETE
The Princeton public street improvements
10/17/2019
10/26/2019
02/28/2023
Locations
Contacts
METCALF BANK, Address:609 NE 291 HWY  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
LEES SUMMIT SENIOR COMMUNITY LLC, Address:5051 S NATIONAL AVE STE 4-100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/17/2019 10/24/2019
Steve Robbins
Fees
Paid Fees Amount Paid Owing Date Paid
Storm Sewer Inspection Fee $7,973.52 $7,973.52 Paid 10/17/2019
Paved Surface Inspection Fee $13,496.87 $13,496.87 Paid 10/17/2019
Site Grading Fee $5,023.15 $5,023.15 Paid 10/17/2019
Right of Way Permit Fee $80.00 $80.00 Paid 10/17/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Inlets Clean Partial 12/10/2019
Misc
Informational
12/10/2019
Contractor began the installation of storm boxes B1 and B2.
Misc
Informational
12/10/2019
Storm - Pipe Partial 12/10/2019
Misc
Informational
12/10/2019
Storm pipe was installed from B1 to B2 as per project plan Approximately 160’.
Storm - Pipe Partial 12/19/2019
Misc
Informational
12/10/2019
Storm pipe was installed from B1 to B2 as per project plan.
Informational
12/19/2019
Contractor completed the contstuction of Line C and the street crossing as per plan from 12/17 to 12/18. Contractor began working on Line near Sta. 3+00 installed approximately 100' of 24" HDPE to Sta. 4+00. Installation of concrete Outlet as per plans near Sta. 3+00.
Storm - Outlet Structure Partial 12/19/2019
Informational
12/19/2019
Outlet structure installed at Line A Sta. 3+00 as per plans 24" CONC. FES w? CUTOFF WALL LS STD DETAIL STM-5.
Storm - Pipe Partial 12/20/2019
Misc
Informational
12/20/2019
Contractor installed approximately 120’ of 24” HPDE storm pipe on Line A . Sta 4+00 to Sta 5+20 12/20/19 Friday. Contractor will work on Monday 12/23/19 and continue to install pipe on Line A.
Storm - Inlets Clean Partial 12/23/2019 12/24/2019
Misc
Informational
12/10/2019
Contractor began the installation of storm boxes B1 and B2.
Misc
Informational
12/10/2019
Informational
12/24/2019
Contractor began installation of storm inlet A1 as per plans.
Misc
Informational
12/27/2019
Contractor installed storm A2 7’x4’ curb Inlet was installed 12/27/19.
Storm - Pipe Partial 12/23/2019 12/24/2019
Misc
Informational
12/20/2019
Contractor installed approximately 120’ of 24” HPDE storm pipe on Line A . Sta 4+00 to Sta 5+20 12/20/19 Friday. Contractor will work on Monday 12/23/19 and continue to install pipe on Line A.
Informational
12/24/2019
Contractor installed approximately 120' of 24" HDPE pipe up to Storm inlet A1.
Storm - Pipe Partial 12/24/2019 12/24/2019
Informational
12/24/2019
Contractor had to suspend activity of pouring collars because of possible changing the line elevation for B3 Inlet structuture. This may effect pipe and structures for Line C.
Storm - Pipe Partial 2/10/2020 12/27/2019
Misc
Informational
12/27/2019
Contractor installed approximately 100’ of PR. STM 24” HP between A1 and A2.
Informational
02/10/2020
Approximately 180' of 24" HP was installed on Onsite Storm Line 200 Sta. 0+00 to 1+79.27 & 45' of SCH. 40 PVC Sta. !+79.27 to 2+24.76.
Informational
02/10/2020
30" Nyloplast D.B. was installed @ Sta 1+79.27 and 24" Nyloplast D.B. @ Sta. 2+24.76 .
Storm - Pipe Partial 01/02/2020
Misc
Informational
12/27/2019
Contractor installed approximately 100’ of PR. STM 24” HP between A1 and A2.
Misc
Informational
01/02/2020
Contractor installed approximately 140’ of 24” HP on Line A from Curb Inlet A2 to Curb Inlet A3 around 12/27/19.
Misc
Informational
01/02/2020
Contractor installed approximately 47’ of 18” HP from B3 thru B5 on Line B. 12/31/19
Misc
Informational
01/02/2020
Contractor continued to correct elevation of Line C.
Storm - Pipe Partial 01/02/2020
Misc
Informational
01/02/2020
Contractor installed approximately 100’ of PR. STM 24” HP between A1 and A2.
Misc
Informational
01/02/2020
Contractor installed approximately 140’ of 24” HP on Line A from Curb Inlet A2 to Curb Inlet A3 around 12/27/19.
Misc
Informational
01/02/2020
Contractor installed approximately 47’ of 18” HP from B3 thru B5 on Line B. 12/31/19
Storm - Inlets Clean Partial 01/02/2020
Misc
Informational
12/24/2019
Contractor began the installation of storm boxes B1 and B2.
Misc
Informational
01/02/2020
B3, B4 & B5 began installation 12/31/19 .
Storm - Material Verification Passed 01/29/2020
Misc
Informational
01/29/2020
Materials on site were verified and inspector will continue to verify as new materials arrive onsite for installation.
Storm - Pipe Passed 01/29/2020
Misc
Informational
01/02/2020
Contractor installed approximately 100’ of PR. STM 24” HP between A1 and A2.
Misc
Informational
01/02/2020
Contractor installed approximately 140’ of 24” HP on Line A from Curb Inlet A2 to Curb Inlet A3 around 12/27/19.
Misc
Informational
01/02/2020
Contractor installed approximately 47’ of 18” HP from B3 thru B5 on Line B. 12/31/19
Misc
Informational
01/29/2020
Onsite Storm Line 100 over 540’ of 30” HP was installed from 1/16/20 to 1/29/20. 3/ 30” Nyloplast D.B. Along the Storm Line 100.
Storm - Outlet Structure Passed 01/29/2020
Informational
12/24/2019
Line 100 Sta 0+00 contractor began to install Toewall .
Misc
Informational
01/29/2020
Contractor installed approximately 382’ of 24” HP pipe for Line 300. Toewall for line 0+00 was installed and Bioretention Overflow Outlet #1 B1-301 & #2 B2-101 as per plan around 1/14/20.
Sanitary Sewer Construction Inspection Partial 02/19/2020
Misc
Informational
02/19/2020
Contractor connected to the existing manhole as per plans C501. Boot and pipe was installed. Coring was done on the manhole on 2/13/20. CP contractors or continually pumping water and breaking rock which has slowed progress.
Sanitary Sewer Construction Inspection Partial 03/04/2020
Misc
Informational
02/19/2020
Contractor connected to the existing manhole as per plans C501. Boot and pipe was installed. Coring was done on the manhole on 2/13/20. CP contractors or continually pumping water and breaking rock which has slowed progress.
Misc
Informational
03/04/2020
Continued installing 8” Sanitary line as per plans sheet C501. Project plans show approximately 188’ 0f 8” PVC ( SDR-26 ) Contractor began installation of Manhole (s-5) 3/3/20.
Erosion Control Inspection Partial 03/10/2020
Misc
Informational
03/10/2020
Erosion control measure are holding and in place at this time.
Sanitary Sewer Construction Inspection Partial 03/13/2020
Misc
Informational
03/04/2020
Contractor connected to the existing manhole as per plans C501. Boot and pipe was installed. Coring was done on the manhole on 2/13/20. CP contractors or continually pumping water and breaking rock which has slowed progress.
Misc
Informational
03/04/2020
Continued installing 8” Sanitary line as per plans sheet C501. Project plans show approximately 188’ 0f 8” PVC ( SDR-26 ) Contractor began installation of Manhole (s-5) 3/3/20.
Misc
Informational
03/13/2020
Contractor restarted installation of storm line 500 on 3/4/20. As of today Nyloplast 502,503 & 504 have been installed.
ESC - (Vegetation/Ground Cover) Passed 02/28/2023
Install Street and Stop Signs Passed 02/28/2023
Record Drawing Review Passed 12/8/2022 02/28/2023
Documents & Images
Date Uploaded File Type Document Name
10/17/2019 Receipt Receipt for transaction: 2019-006857
10/26/2019 DE-Permit Signed
12/10/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter Inspection Summary
12/20/2019 Letter Inspection Summary
12/20/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/24/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
02/06/2020 20
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/19/2020 ”Sanitary Connect to Existing Sewer Manhole
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter DE-Permit
03/13/2020 Letter INSPECTION SUMMARY
03/28/2022 Letter DE-Certificate of Substantial Completion Single Lot
03/31/2022 Letter DE-Punch List
08/08/2022 Final Affidavit & Agreement
08/08/2022 Maintenance Bond - Roadway Improvements
09/21/2022 Civil Public Sheets
11/30/2022 11-18-2022_Oldham & Princeton Roadway and Storm RECORD DRAWINGS
02/28/2023 Letter DE-Certificate of Final Acceptance (Commercial)
02/28/2023 The Princeton Public Street Improvements Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home