Permit Application Status

PRSITE20235268


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20235268
Development - Site
Issued
DEVELOPMENT COMPLETE
REUNION AT BLACKWELL - PRIVATE SITE DEVELOPMENT FOR AGE RESTRICTED, ATTACHED LIVING UNIT DEVELOPMENT
10/12/2023
12/04/2024
Locations
Contacts
Selby Excavating LLC, Address:16212 Cameron Road  
Jake McClung, Address:16212 Cameron Road, Phone:(816) 820-0956  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 02/06/2024 02/06/2024
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $6,342.00 $6,342.00 Paid 06/05/2024
91100C9-Water Insp Fee $6,703.50 $6,703.50 Paid 08/12/2024
9110072-Water Test Fee $1,200.00 $1,200.00 Paid 08/12/2024
9110068-Storm Fee $7,558.05 $7,558.05 Paid 08/12/2024
9110081-Paved Surface Inspection Fee $14,055.96 $14,055.96 Paid 10/15/2024
9110071-Site Grading Fee $2,820.60 $2,820.60 Paid 08/12/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Pending
Misc
Informational
07/19/2024
7-18-24 BR Contractor (Selby Excavation) installed 210' of 8'' PVC pipe from MH A-9 heading to MH E-1.
Storm Sewer Construction Inspection Pending
Misc
Informational
08/16/2024
8-16-24 Contractor (Selby Excavation) install 50' of 42'' HDPE pipe from storm bx 1700 structure heading to storm box #1701. 2nd crew install 40' of 36'' HDPE pipe from existing storm structure heading to storm box #2400.
Misc
Corrective Action Required
08/16/2024
Water Line - Construction Inspection Pending
Misc
Informational
09/30/2024
9-30-24 BR Contractor (Selby Excavation) installed 130' of 8'' water main from Sta. 12+36 - Sta. 11+68 and 1st vault structure installed on water line C.
Water Line - Hydrostatic Test Pending
Misc
Informational
10/18/2024
10-18-24 BR Contractor (Selby Excavation) preformed hydrostatic test on water line A, line B, line G, line C at 150 psi which pass.
Water Line - Coliform Test 1 Pending
Misc
Informational
11/21/2024
11-20-24 BR Contractor 1st sample on water line D, line E coliform test. 11-21-24 BR Contractor 2nd sample on water line D, line E coliform test.
Water Line - Coliform Test 2 Pending
Misc
Informational
11/21/2024
11-7-24 BR Contractor 2nd sample on water line A, line G, line B, & line C coliform test. . 11-21-24 BR Contractor 2nd sample on water line D, line E coliform test.
Sanitary Sewer - Mandrel Pending
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed mandrel test on MH E-4, MH E-3, MH E-2, MH E-1, & MH F-1. Pass.
Sanitary Sewer - Vacuum Pending
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed vacuum test on MH E-4, MH E-3, MH E-2, MH E-1, & MH F-1 Pass.
Sanitary Sewer - Air Test Pending
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed air test on MH E-4 / MH E-3, MH E-3 / MH E-2, MH E-2 / MH E-1, MH E-1 / F-1, MH E-1 / MH A-9
Erosion Control Inspection Pending
Sanitary Sewer Construction Inspection Pending
Grading/Excavation/Fill Inspection Pending
Water Line - Construction Inspection Pending
Sanitary - Material Verification Pending
Sanitary Sewer Construction Inspection Pending
Pavement-Proof Roll Pending
Install Street and Stop Signs Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Water Line - Hydrostatic Test Pending
Pavement-Curb Construction Pending
Misc
Informational
12/05/2024
12-5-24 BR Contractor installed curbs on SE Bradfree St., SE 6th St., SE Golden Ln. on west & east side of streets.
Water Line - Coliform Test 2 Pending
Pavement-Aggregate Base Pending
Misc
Informational
03/26/2025
3-21-25 DP/BR Contactor (Seal-o-Matic) 4'' type 5 on Wood Ln. & 1/2 of 5th Ter. Contractor did have 3rd party tester on site and base compaction was 95%. 3-26-25nBR Contractor (Seal-o-Matic) laid 4'' type 5 on the reminder roads Wood Ln.,5th ter., 6th st., Bradfree St., Golden Ln., Shenandoah Dr., & Lindberg Ln. 3 party tester on and asphalt base was 95% compaction.
Pavement-Surface Pending
Misc
Informational
03/27/2025
3-27-25BR Contractor (Seal-o-Matic) laid 2'' type 5 on the reminder roads Wood Ln.,5th ter., 6th st., Bradfree St., Golden Ln., Shenandoah Dr., & Lindberg Ln. 3 party tester on and asphalt base was 95% compaction.
Water Line - Coliform Test 1 Passed 11/4/2024 11/4/2024 11/04/2024
Misc
Informational
11/04/2024
10-30-24 BR Contractor 1st sample on water line A, line G, line B, & line C coliform test. 11-4-24 BR 1st sample for coliform test on water line A, line G, line B. & line C pass.
Water Line - Hydrostatic Test Passed 11/12/2024 11/12/2024 11/21/2024
Misc
Informational
10/18/2024
10-18-24 BR Contractor (Selby Excavation) preformed hydrostatic test on water line A, line B, line G, line C at 150 psi which pass. 11-12-24 BR Contractor (Selby Excavation) preformed hydrostatic test on water line D, line E at 150 psi for 2hr. which pass.
Sanitary Sewer Construction Inspection Passed 8/8/2024 8/8/2024 11/22/2024
Misc
Informational
07/19/2024
7-18-24 BR Contractor (Selby Excavation) installed 210' of 8'' PVC pipe from MH A-9 heading to MH E-1. 7-22-24 BR Contractor (Selby Excavation) installed 300' of 8'' PVC pipe with MH E-1 structure installed. 7-24-24 DA Contractor (Selby Excavation) installed 300' of 8'' PVC pipe from MH E-1 to MH E-2 with MH E-2 structure installed. 7-25-24 BR Contractor (Selby Excavation) installed 270' of 8'' PVC pipe from MH E-2 to MH E-4 with MH E-3 & MH E-4 structure installed. 7-29-24 BR Contractor (Selby Excavation) installed 200' of 8'' PVC pipe from MH A-3 heading to MH B-1. 7-30-24 DA Contractor (Selby Excavation) installed 200' of 8'' PVC pipe with MH B-1 structure installed. 8-1-24 BR Contractor (Selby Excavation) installed 230' of 8'' PVC pipe from MH B-1 to MH B-2 with MH B-2 structure installed. 8-2-24 BR Contractor (Selby Excavation) installed 330' of 8'' PVC pipe from MH B-2 to MH D-1 with MH B-3 & MH D-1 structure installed. 8-5-24 BR Contractor (Selby Excavation) installed 150' of 8'' PVC pipe from MH B-3 to MH B-4 with MH B-4 structure installed. 8-6-24 JJ Contractor (Selby Excavation) installed 130' of 8'' PVC pipe from MH B-3 to MH B-4 with MH B-4 structure installed. 8-8-24 BR Contractor (Selby Excavation) installed 40' of 8'' PVC pipe from MH B-4 with B-5 with structure installed.
Sanitary Sewer - Mandrel Passed 12/2/2024 12/2/2024 12/02/2024
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed mandrel test on MH E-4, MH E-3, MH E-2, MH E-1, & MH F-1. Pass. 12-2-24 BR Contractor preformed mandrel test on MH D-1, MH B-3, MH B-2, MH B-1, MH B-4, MH B-5 Pass.
Water Line - Coliform Test 2 Passed 12/4/2024 12/4/2024 12/04/2024
Misc
Informational
11/07/2024
11-7-24 BR Contractor 2nd sample on water line A, line G, line B, & line C coliform test. 11-12-24 BR 2nd sample came back with 2 out of 3 samples has pass. 1 sample spot needs the taking again do to not passing. 12-3-24 BR 3rd sample for water line A, line G, line B, & line C pass.
Water Line - Construction Inspection Passed 10/25/2024 10/25/2024 12/04/2024
Misc
Informational
09/30/2024
9-30-24 BR Contractor (Selby Excavation) installed 130' of 8'' water main from Sta. 12+36 - Sta. 11+68 and 1st vault structure installed on water line C. 10-1-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line C from Sta. 11+68 - Sta. 9+00 with fire hydrant assembly installed. 10-2-24 BR Contractor (Selby Excavation) installed 350' of 8'' water main on line C from Sta. 9+00 - Sta. 5+00 with fire hydrant installed. 10-3-24 BR Contractor (Selby Excavation) installed 350' of 8'' water main on line C from Sta. 5+00 - Sta. 2+00 with fire hydrant installed. 10-8-24 BR Contractor (Selby Excavation) installed 120' of 8'' water main on line C from Sta. 2+00 - Sta. 0+50 with backflow vault installed. 10-21-24 BR Contractor (Selby Excavation) installed 100' of 8'' water main on line E from Sta. 0+00 - Sta. 1+00 with backflow vault installed. 10-22-24 BR Contractor (Selby Excavation) preformed a chlorination/disinfection test on water line A, line G, line B, line C which is a pass. 10-23-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line E from Sta. 1+00 - Sta. 3+00 with fire hydrant at Sta. 2+65 installed. 10-24-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line E from Sta. 3+00 - Sta. 6+58. Also contractor installed 200' f 8'' water main on line D from Sta. 0+00 - Sta. 2+00 with fire hydrant installed. 10-25-24 BR Contractor flush water line A, line G, line B, & line C ready for bacteriological test. 12-4-24 BR Water line A, line G, line B, & line C pass bacteriological test and connected and in service.
Water Line - Coliform Test 1 Passed 11/21/2024 11/21/2024 12/05/2024
Misc
Informational
11/21/2024
11-20-24 BR Contractor 1st sample on water line D, line E coliform test. 11-21-24 BR Contractor 2nd sample on water line D, line E coliform test. 12-3-24 BR Contractor 1st sample on water line D, line E coliform test pass 12-5-24 BR Contractor 2nd sample on water line D, line E coliform test pass
Water Line - Coliform Test 2 Passed 11/21/2024 11/21/2024 12/05/2024
Misc
Informational
11/07/2024
11-7-24 BR Contractor 2nd sample on water line A, line G, line B, & line C coliform test. . 11-21-24 BR Contractor 2nd sample on water line D, line E coliform test. 12-3-24 BR Contractor 2nd sample on water line D, line E coliform test pass. 12-5-24 BR Contractor 2nd sample on water line D, line E coliform test pass.
Sanitary Sewer - Air Test Passed 12/2/2024 12/2/2024 12/05/2024
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed air test on MH E-4 / MH E-3, MH E-3 / MH E-2, MH E-2 / MH E-1, MH E-1 / F-1, MH E-1 / MH A-9 12-2-24 BR Contractor preformed air test on MH B-3 / MH B-2, MH B-2 / MH B-1, MH B-1 / MH A-3. Pass
Sanitary Sewer - Vacuum Passed 11/22/2024 11/22/2024 12/16/2024
Misc
Informational
11/22/2024
11-22-24 BR Contractor preformed vacuum test on MH E-4, MH E-3, MH E-2, MH E-1, & MH F-1 Pass. 12-16-24 BR Contractor preformed vacuum test on MH D-1, MH B-3, MH B-2, MH B-1, MH B-4, MH B-5 pass.
Sanitary Sewer - Camera Test Partial 12/19/2024 12/19/2024 12/19/2024
Misc
Informational
12/19/2024
12-19-24 BR Water dept preformed camera test on public sewer lines waiting on results.
Pavement-Curb Construction Partial 1/3/2025 1/3/2025 01/03/2025
Misc
Informational
12/05/2024
12-5-24 BR Contractor installed curbs on SE Bradfree St., SE 6th St., SE Golden Ln. on west & east side of streets. 1-2-25 JMJ Contractor poured concrete curbs on parking stalls on SE Bradfree St., & SE Golden Lane. 1-3-25 BR Contractor poured concrete curbs and storm box inlets on SE 6th St., & SE Golden Ln.
Storm Sewer Construction Inspection Passed 1/9/2025 1/9/2025 01/09/2025
Misc
Informational
08/16/2024
8-16-24 Contractor (Selby Excavation) install 50' of 42'' HDPE pipe from storm box 1700 structure heading to storm box #1701. 2nd crew install 40' of 36'' HDPE pipe from existing storm structure heading to storm box #2400. 8-17-24 BR Contractor (Selby Excavation) installed 80' of 36'' HDPE pipe to storm box #2400. 2nd crew installed 100' of 42'' HDPE pipe to storm box #1701 with storm box structure installed. Also installed 45' of 30'' HDPE pipe heading to storm box #1702. 8-20-24 BR Contractor (Selby Excavation) installed 440' of 15'' HDPE pipe from storm box #1701 to storm box #2103 with storm box #2101 , #2102, #2103 structure installed. 8-21-24 BR Contractor (Selby Excavation) installed 200' of 30'' HDPE pipe from storm box #1701 to storm box #1702 with structure installed. 2nd crew installed 200' of 18'' HDPE from storm box #302 to storm box #301 with storm boxes structure installed. 8-22-24 BR Contractor (Selby Excavation) installed 400' of 18'' HDPE pipe storm box #102 to storm box #105 with structures installed. 2nd crew installed 300' of 18'' HDPE pipe from storm box #1702 to storm box #1703. 8-26-24 BR Contractor ( Selby Excavation) installed 300' of 18'' HDPE pipe from storm box#1703 heading to storm box #1704. 2nd crew installed 320' of 18'' HDPE pipe from storm box #104 to storm box #107. 8-27-24 BR Contractor (Selby Excavation) poured concrete columns on 1700 line storm boxes, & 2 boxes on 2300 line. 8-28-24 BR Contractor (Selby Excavation) installed 230' of 18'' HDPE pipe storm box #1704 to storm box #1705 with both structure installed. 9-4-24 BR Contractor (Selby Excavation) installed 200' of 18'' HDPE pipe from storm box# 104 to storm box#501. 2nd crew installed 100' of 18'' HDPE pipe from storm box#501 to storm box#502 and 100' of 18'' HDPE pipe from storm box# 105 to storm box #106. Also poured columns and inverts. 9-6-24 BR Contractor (Selby Excavation) 1st crew installed 50' of 18'' HDPE pipe from storm box#703 to storm box#1501 with both structures installed. 2nd crew installed 60' of 18'' HDPE pipe from storm box#106 to storm box#108. 9-9-24 JMJ Contractor installed storm box#703 , storm box#704 with 150' of 18'' HDPE pipe. 9-10-24 BR Contractor installed 240' of 18'' HDPE pipe to storm box#705, bx#706, box#707, & box#708. 2nd crew installed 210' of 18'' HDPE pipe to storm box#1213, box#1101, & box#1400 9-12-24 BR Contractor installed 50' of 36'' HDPE pipe to storm box# 2401 with structure installed. 2nd crew reset storm box# 2201 and poured columns on multiple storm boxes. 9-23-24 BR I’ve informed contractor there are several storm structures and storm inlet that are damage and needs to be replace. Here are some of the structures and inlets that needs to be replace 1901, 108, 1703, 1801, 701, 707, 708, & 1101. BR 1-9-25 Contractor has replace storm box 1901 and inlets 108, 1703, 1801, 701, 707, 708, 1101.
Misc
Corrective Action Required
08/16/2024
Sanitary Sewer - Camera Test Passed 1/21/2025 01/21/2025
Misc
Informational
12/19/2024
12-19-24 BR Water dept preformed camera test on public sewer lines waiting on results.
Pavement-Aggregate Base Passed 3/26/2025 3/26/2025 03/27/2025
Misc
Informational
03/26/2025
3-21-25 DP/BR Contactor (Seal-o-Matic) 4'' type 5 on Wood Ln. & 1/2 of 5th Ter. Contractor did have 3rd party tester on site and base compaction was 95%. 3-26-25nBR Contractor (Seal-o-Matic) laid 4'' type 5 on the reminder roads Wood Ln.,5th ter., 6th st., Bradfree St., Golden Ln., Shenandoah Dr., & Lindberg Ln. 3 party tester on and asphalt base was 95% compaction.
Pavement-Surface Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
3-27-25BR Contractor (Seal-o-Matic) laid 2'' type 5 on the reminder roads Wood Ln.,5th ter., 6th st., Bradfree St., Golden Ln., Shenandoah Dr., & Lindberg Ln. 3 party tester on and asphalt base was 95% compaction.
Documents & Images
Date Uploaded File Type Document Name
01/16/2024 Approved Plans APPROVED REUNION AT BLACKWELL FDP
06/05/2024 Receipt Receipt for transaction:2024-004404
06/05/2024 Letter DE-Permit
07/19/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/12/2024 Receipt Receipt for transaction:2024-006809
08/16/2024 Letter INSPECTION SUMMARY
08/17/2024 Letter INSPECTION SUMMARY
08/17/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/15/2024 Receipt Receipt for transaction:2024-008351
10/18/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/19/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home