Permit Application Status

PRSITE20221062


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20221062
Development - Site
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
LOT 9 STREETS OF WEST PRYOR - SITE DEVELOPMENT
03/22/2022
03/24/2022
02/28/2024
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/22/2022 03/24/2022
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $2,038.50 $2,038.50 Paid 03/23/2022
91100C9-Water Insp Fee $1,324.14 $1,324.14 Paid 03/23/2022
9110072-Water Test Fee $1,000.00 $1,000.00 Paid 03/23/2022
9110068-Storm Fee $1,123.65 $1,123.65 Paid 03/23/2022
9110081-Paved Surface Inspection Fee $9,017.90 $9,017.90 Paid 03/23/2022
9110071-Site Grading Fee $4,426.07 $4,426.07 Paid 03/23/2022
8331401-Water Tap Fee $57,275.00 $57,275.00 Paid 03/23/2022
8350015-Water Meter Fee $5,749.53 $5,749.53 Paid 03/23/2022
8350015-Water Meter Fee $1,047.83 $1,047.83 Paid 02/14/2023
$5,749.53
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 03/28/2022
Misc
Informational
03/28/2022
Gordon Energy installed silt fencing around the property. RP 3-28-22
Grading/Excavation/Fill Inspection Partial 03/28/2022
Misc
Informational
03/28/2022
ESS started grading the site today. RP 3-28-22
Sanitary - Material Verification Passed 04/04/2022
Misc
Informational
04/04/2022
Wyes and sanitary pipe is SDR 26 material. Talked with Tyler about using MAX Adapters for cutting wyes into the main line. RP 4-4-22
Site Visit Partial 04/06/2022
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22
Water Line - Construction Inspection Partial 04/07/2022
Misc
Informational
04/07/2022
Tyler’s crew laid 200 feet of C900 waster pipe and set the fire hydrant. RP 4-7-22
Water Line - Construction Inspection Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/07/2022
Tyler’s crew laid 200 feet of C900 waster pipe and set the fire hydrant. RP 4-7-22
Misc
Informational
04/08/2022
Tyler’s crew cut into the existing water main and added a tee with 3 valves. Also poured kickers for the tee, fire hydrant and the 45 degree bend. RP 4-8-22
Sanitary Sewer Construction Inspection Passed 4/5/2022 4/5/2022 04/08/2022
Misc
Informational
04/08/2022
Tyler’s crew cut into the sanitary main line and set a wye for lot 9A. They used max adapters to attach the wye. They also ran the service lateral to lot 9A. RP 4-8-22
Water Line - Hydrostatic Test Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/08/2022
Water main held 150 psi for 2 hours. RP 4-8-22
Water Line - Coliform Test 1 Partial 4/11/2022 4/11/2022 04/11/2022
Misc
Informational
04/11/2022
Tyler tried chlorinating the water line with chlorinated liquid, but the test strips showed that the water line wasn’t hot. Tyler switched over to granular chlorine and the test strips showed the line was hot. We will start to dechlorinate the line tomorrow at 12:30 p.m. RP 4-11-22
Site Visit Partial 4/7/2022 4/7/2022 04/11/2022
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/11/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Water Line - Coliform Test 1 Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/11/2022
Tyler tried chlorinating the water line with chlorinated liquid, but the test strips showed that the water line wasn’t hot. Tyler switched over to granular chlorine and the test strips showed the line was hot. We will start to dechlorinate the line tomorrow at 12:30 p.m. RP 4-11-22
Misc
Informational
04/12/2022
Dechlorinated the water line. Will pull 1st samples tomorrow for testing. RP 4-12-22
Site Visit Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/11/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/11/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/12/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Water Line - Coliform Test 1 Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/12/2022
Tyler tried chlorinating the water line with chlorinated liquid, but the test strips showed that the water line wasn’t hot. Tyler switched over to granular chlorine and the test strips showed the line was hot. We will start to dechlorinate the line tomorrow at 12:30 p.m. RP 4-11-22
Misc
Informational
04/12/2022
Dechlorinated the water line. Will pull 1st samples tomorrow for testing. RP 4-12-22
Misc
Informational
04/13/2022
Pulled first sample and delivered to Keystone Laboratories for testing. RP 4-13-22
Site Visit Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/12/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/12/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/12/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/13/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Water Line - Coliform Test 2 Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/14/2022
Met Tyler and pulled second Bac T sample. Delivered sample to Keystone Laboratories for testing. Still waiting to hear the results on the first sample. RP 4-14-22
Site Visit Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/13/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/13/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/13/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/13/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/14/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Water Line - Coliform Test 1 Passed 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/13/2022
Tyler tried chlorinating the water line with chlorinated liquid, but the test strips showed that the water line wasn’t hot. Tyler switched over to granular chlorine and the test strips showed the line was hot. We will start to dechlorinate the line tomorrow at 12:30 p.m. RP 4-11-22
Misc
Informational
04/13/2022
Dechlorinated the water line. Will pull 1st samples tomorrow for testing. RP 4-12-22
Misc
Informational
04/13/2022
Pulled first sample and delivered to Keystone Laboratories for testing. RP 4-13-22
Misc
Informational
04/15/2022
First Bac T sample passed testing. RP 4-15-22
Site Visit Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/14/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/14/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/14/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/14/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/14/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/15/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Water Line - Coliform Test 2 Passed 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/14/2022
Met Tyler and pulled second Bac T sample. Delivered sample to Keystone Laboratories for testing. Still waiting to hear the results on the first sample. RP 4-14-22
Misc
Informational
04/18/2022
Samples passed second Bac T testing. RP 4-18-22
Site Visit Partial 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/15/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/15/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/15/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/15/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/15/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/15/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/18/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Grading/Excavation/Fill Inspection Partial 3/29/2022 3/29/2022 04/18/2022
Misc
Informational
03/28/2022
ESS started grading the site today. RP 3-28-22
Misc
Informational
04/18/2022
Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Site Visit Partial 4/19/2022 4/19/2022 04/19/2022
Misc
Informational
04/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/18/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/18/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/18/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/18/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/18/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/18/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/19/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Site Visit Partial 4/20/2022 4/20/2022 04/21/2022
Misc
Informational
04/19/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/19/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/19/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/19/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/19/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/19/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/19/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/19/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
04/21/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Site Visit Partial 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/21/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/21/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/21/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/21/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/21/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/21/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/21/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/21/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
04/21/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
04/22/2022
John’s crew still building the retaining wall. RP 4-22-22
Storm Sewer Construction Inspection Partial 04/27/2022
Misc
Informational
04/27/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Storm Sewer Construction Inspection Partial 04/28/2022
Misc
Informational
04/27/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Misc
Informational
04/28/2022
Rudy’s crew completed storm line D. 4/27/22 ES
Site Visit Partial 4/25/2022 4/25/2022 04/28/2022
Misc
Informational
04/22/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/22/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/22/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/22/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/22/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/22/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/22/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/22/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
04/22/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
04/22/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
04/28/2022
No work being done today. 4/28/22 ES
Water Service Inspection Partial 04/29/2022
Misc
Informational
04/29/2022
Water did 5 taps on site today. Rudy’s crew started working on them and got rained out. 4/29/22 ES
Site Visit Partial 04/29/2022
Misc
Informational
04/28/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/28/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/28/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/28/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/28/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/28/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/28/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/28/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
04/28/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
04/28/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
04/28/2022
No work being done today. 4/28/22 ES
Misc
Informational
04/29/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Water Service Inspection Partial 05/03/2022
Misc
Informational
04/29/2022
Water did 5 taps on site today. Rudy’s crew started working on them and got rained out. 4/29/22 ES
Misc
Informational
05/03/2022
Rudy’s crew finished installing the water meters. Copper ran from main to meters and at least 10’ beyond meter pit. A couple pits will need to be adjusted at final grade. 5/3/22 ES
Storm Sewer Construction Inspection Partial 05/03/2022
Misc
Informational
04/28/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Misc
Informational
04/28/2022
Rudy’s crew completed storm line D. 4/27/22 ES
Misc
Informational
05/03/2022
Rudy’s crew started on storm line B. Cut into existing inlet B-1 and ran pipe and set box B-2. Will pour collars and inverts tomorrow. 5/3/22 ES
Site Visit Partial 05/03/2022
Misc
Informational
04/29/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/29/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
04/29/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
04/29/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
04/29/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
04/29/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
04/29/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
04/29/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
04/29/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
04/29/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
04/29/2022
No work being done today. 4/28/22 ES
Misc
Informational
04/29/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/03/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES
Storm Sewer Construction Inspection Partial 5/11/2022 05/12/2022
Misc
Informational
05/03/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Misc
Informational
05/03/2022
Rudy’s crew completed storm line D. 4/27/22 ES
Misc
Informational
05/03/2022
Rudy’s crew started on storm line B. Cut into existing inlet B-1 and ran pipe and set box B-2. Will pour collars and inverts tomorrow. 5/3/22 ES
Misc
Informational
05/12/2022
Rudy’s crew completed storm line B. Poured collar for box B-1, collars and inverts for Box B-2 and B-3. 5/4/22 ES
Site Visit Partial 5/11/2022 05/12/2022
Misc
Informational
05/03/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/03/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/03/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/03/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/03/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/03/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/03/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/03/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/03/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/03/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/03/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/03/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/03/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES
Site Visit Partial 05/12/2022
Misc
Informational
05/12/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/12/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/12/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/12/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/12/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/12/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/12/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/12/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/12/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/12/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/12/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/12/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/12/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES
Site Visit Partial 05/12/2022
Misc
Informational
05/12/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/12/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/12/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/12/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/12/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/12/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/12/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/12/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/12/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/12/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/12/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/12/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/12/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES
Piers/Caissons Inspection - Commercial Partial 5/19/2022 (1:00) 5/19/2022 05/19/2022
Misc
Informational
05/19/2022
9 of 11 light pole bases 6' #8 Coiled copper in base per plan No driven ground rod at this time #8 copper needs to be clamped to ground rod 2 at rear of lot in front of 940 Pryor 1 at fire hydrant south side 1 SE near inlet 2 at front of middle bldg pad 1 at rear middle pad 1 at NW corner of lot 1 south of north bldg pad
Site Visit Partial 05/27/2022
Misc
Informational
05/12/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/12/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/12/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/12/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/12/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/12/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/12/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/12/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/12/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/12/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/12/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/12/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/12/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES
Site Visit Partial 05/31/2022
Misc
Informational
05/27/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/27/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/27/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/27/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/27/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/27/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/27/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/27/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/27/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/27/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/27/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/27/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/27/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES
Sanitary Sewer - Mandrel Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed mandrel testing with a 7.37” plate. Mandrel passed through section without issue. 6/4/22 ES
Sanitary Sewer - Air Test Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed air test on line A, line passed test without dropping pressure. 6/6/22 ES
Sanitary Sewer - Vacuum Passed 5/31/2022 6/6/2022 06/06/2022
Misc
Informational
06/06/2022
Jeremiah performed vacuum test on MH A-2, manhole passed. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
05/31/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/31/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
05/31/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
05/31/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
05/31/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
05/31/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
05/31/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
05/31/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
05/31/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
05/31/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
05/31/2022
No work being done today. 4/28/22 ES
Misc
Informational
05/31/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
05/31/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES
Grading/Excavation/Fill Inspection Partial 06/06/2022
Misc
Informational
04/18/2022
ESS started grading the site today. RP 3-28-22
Misc
Informational
04/18/2022
Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/06/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/06/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/06/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/06/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/06/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/06/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/06/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/06/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/06/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/06/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/06/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/06/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES
Pavement-Stabilized Subgrade Partial 06/06/2022
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES
Grading/Excavation/Fill Inspection Partial 06/07/2022
Misc
Informational
06/06/2022
ESS started grading the site today. RP 3-28-22
Misc
Informational
06/06/2022
Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES
Pavement-Stabilized Subgrade Partial 06/07/2022
Misc
Informational
06/06/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES
Site Visit Partial 06/07/2022
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/06/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/06/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/06/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/06/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/06/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/06/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/06/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/06/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/06/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/06/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/06/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/06/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES
Sanitary Sewer - Camera Test Partial 6/8/2022 6/8/2022 06/07/2022
Misc
Informational
06/07/2022
Email sent to water to get this section camera’d. 6/7/22 ES
Site Visit Partial 06/08/2022
Misc
Informational
06/07/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/07/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/07/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/07/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/07/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/07/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/07/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/07/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/07/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/07/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/07/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/07/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/07/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES
Pavement-Stabilized Subgrade Partial 06/08/2022
Misc
Informational
06/07/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES Spoke with Cody this morning. They plan on doing a proof roll on Tuesday morning weather permitting. 6/8/22 ES
Piers/Caissons Inspection - Commercial Partial 6/9/2022 (10:00) 6/9/2022 06/09/2022
Misc
Informational
05/19/2022
11 of 11 light pole bases 6' #8 Coiled copper in base per plan No driven ground rod at this time #8 copper needs to be clamped to ground rod
Piers/Caissons Inspection - Commercial Passed 6/10/2022 6/10/2022 06/10/2022
Misc
Informational
06/09/2022
11 of 11 light pole bases with ground rods
Site Visit Partial 06/13/2022
Misc
Informational
06/08/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/08/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/08/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/08/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/08/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/08/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/08/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/08/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/08/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/08/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/08/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/08/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/08/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES
Site Visit Partial 06/14/2022
Misc
Informational
06/13/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/13/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/13/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/13/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/13/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/13/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/13/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/13/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/13/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/13/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/13/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/13/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/13/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES
Pavement-Stabilized Subgrade Partial 06/14/2022
Misc
Informational
06/08/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES Spoke with Cody this morning. They plan on doing a proof roll on Tuesday morning weather permitting. 6/8/22 ES ESS working on rolling/grading and staking. 6/13/22 ES
Site Visit Partial 06/14/2022
Misc
Informational
06/14/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/14/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/14/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/14/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/14/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/14/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/14/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/14/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/14/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/14/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/14/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/14/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/14/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES
Pavement-Curb Construction Partial 06/15/2022
Misc
Informational
06/15/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES
Pavement-Proof Roll Partial 6/15/2022 (9:00) 6/15/2022 06/15/2022
Misc
Informational
06/15/2022
ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES
Site Visit Partial 06/15/2022
Misc
Informational
06/14/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/14/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/14/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/14/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/14/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/14/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/14/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/14/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/14/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/14/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/14/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/14/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/14/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES
Sanitary Sewer - Camera Test Partial 7/7/2022 06/16/2022
Misc
Informational
06/07/2022
Email sent to water to get this section camera’d. 6/7/22 ES Water was onsite today performing camera testing. 6/16/22 ES
Pavement-Curb Construction Partial 06/16/2022
Misc
Informational
06/15/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES
Site Visit Partial 06/16/2022
Misc
Informational
06/15/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/15/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/15/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/15/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/15/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/15/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/15/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/15/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/15/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/15/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/15/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/15/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/15/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
06/16/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/16/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/16/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/16/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/16/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/16/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/16/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/16/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/16/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/16/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/16/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/16/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/16/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES
Pavement-Curb Construction Partial 06/20/2022
Misc
Informational
06/16/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
06/20/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/20/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/20/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/20/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/20/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/20/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/20/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/20/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/20/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/20/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/20/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/20/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/20/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Pavement-Curb Construction Partial 06/20/2022
Misc
Informational
06/20/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES
Sanitary Sewer - Camera Test Partial 7/18/2022 06/20/2022
Misc
Informational
06/16/2022
Email sent to water to get this section camera’d. 6/7/22 ES Water was onsite today performing camera testing. 6/16/22 ES Water onsite finishing sewer bond inspection. 6/17/22 ES
Pavement-Curb Construction Partial 06/22/2022
Misc
Informational
06/20/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES
Water Service Inspection Partial 6/14/2022 6/14/2022 06/22/2022
Misc
Informational
05/03/2022
Water did 5 taps on site today. Rudy’s crew started working on them and got rained out. 4/29/22 ES
Misc
Informational
05/03/2022
Rudy’s crew finished installing the water meters. Copper ran from main to meters and at least 10’ beyond meter pit. A couple pits will need to be adjusted at final grade. 5/3/22 ES
Misc
Corrective Action Required
06/22/2022
Doing checkup on water meters after pads were graded out and curbs starting. Meter setup on Lot 9C is leaking. Contacted Cody to let him know about this issue for correcting. 6/10/22 ES
Pavement-Curb Construction Partial 06/23/2022
Misc
Informational
06/22/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES Richard’s crew continued on curbs, finished all but a couple small sections and where it connects to existing sidewalk. 20 cy of concrete today. 6/22/22 ES
Pavement-Stabilized Subgrade Partial 06/23/2022
Misc
Informational
06/14/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES Spoke with Cody this morning. They plan on doing a proof roll on Tuesday morning weather permitting. 6/8/22 ES ESS working on rolling/grading and staking. 6/13/22 ES ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES
Pavement-Aggregate Base Partial 06/23/2022
Misc
Informational
06/23/2022
ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES
Pavement-Curb Construction Partial 06/23/2022
Misc
Informational
06/23/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES Richard’s crew continued on curbs, finished all but a couple small sections and where it connects to existing sidewalk. 20 cy of concrete today. 6/22/22 ES Richard’s crew hand poured about 10 cy of curbs today and 36 cy for dumpster pads. 6/22/22 ES
Pavement-Curb Construction Partial 06/27/2022
Misc
Informational
06/23/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES Richard’s crew continued on curbs, finished all but a couple small sections and where it connects to existing sidewalk. 20 cy of concrete today. 6/22/22 ES Richard’s crew hand poured about 10 cy of curbs today and 36 cy for dumpster pads. 6/22/22 ES Richard’s crew poured dumpster pads and lead up to south base. 6/23/22 ES Richard’s crew was working on curbs they weren’t able to finish last week. 6/27/22 ES
Storm Sewer Construction Inspection Partial 06/27/2022
Misc
Informational
05/12/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Misc
Informational
05/12/2022
Rudy’s crew completed storm line D. 4/27/22 ES
Misc
Informational
05/12/2022
Rudy’s crew started on storm line B. Cut into existing inlet B-1 and ran pipe and set box B-2. Will pour collars and inverts tomorrow. 5/3/22 ES
Misc
Informational
05/12/2022
Rudy’s crew completed storm line B. Poured collar for box B-1, collars and inverts for Box B-2 and B-3. 5/4/22 ES ESS was working on fixing storm inlets C-2 and C-3. Nyloplast was broken off during grading. 6/27/22 ES
Pavement-Aggregate Base Partial 06/27/2022
Misc
Informational
06/27/2022
ESS on site working on final grade in preparation for proof roll for pavement. 6/27/22 ES
Pavement-Proof Roll Passed 6/30/2022 (10:00) 6/30/2022 06/30/2022
Misc
Informational
06/15/2022
ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES ESS performed a proof roll for base asphalt using a truck with 20.0 tons of rock. All areas passed. 6/30/22 ES
Pavement-Stabilized Subgrade Partial 06/30/2022
Misc
Informational
06/23/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES Spoke with Cody this morning. They plan on doing a proof roll on Tuesday morning weather permitting. 6/8/22 ES ESS working on rolling/grading and staking. 6/13/22 ES ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES ESS performed a proof roll for putting down base asphalt using a truck with a 20 ton load. All areas passed. 6/30/22 ES
Pavement-Surface Partial 06/30/2022
Misc
Informational
06/30/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Pavement-Curb Construction Partial 06/30/2022
Misc
Informational
06/27/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES Richard’s crew continued on curbs, finished all but a couple small sections and where it connects to existing sidewalk. 20 cy of concrete today. 6/22/22 ES Richard’s crew hand poured about 10 cy of curbs today and 36 cy for dumpster pads. 6/22/22 ES Richard’s crew poured dumpster pads and lead up to south base. 6/23/22 ES Richard’s crew was working on curbs they weren’t able to finish last week. 6/27/22 ES Richard’s crew finished up curbs, including replacing some. Also finished pouring wall bases for dumpster pads. 6/28/22 ES
Pavement-Surface Partial 07/01/2022
Misc
Informational
06/30/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Misc
Informational
07/01/2022
Installing 4inches of base asphalt today. Coming back on Monday to do surface
Pavement-Surface Partial 07/05/2022
Misc
Informational
07/01/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Misc
Informational
07/01/2022
Installing 4inches of base asphalt today. Coming back on Monday to do surface
Misc
Informational
07/05/2022
Seal-o-matic on site laying top 2.5” of surface asphalt today. 7/5/22 ES
Pavement-Surface Partial 07/07/2022
Misc
Informational
07/05/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Misc
Informational
07/05/2022
Installing 4inches of base asphalt today. Coming back on Monday to do surface
Misc
Informational
07/05/2022
Seal-o-matic on site laying top 2.5” of surface asphalt today. 7/5/22 ES Seal-O-Matic completed surface asphalt 7/5/22 ES
Pavement-Surface Partial 07/07/2022
Misc
Informational
07/07/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Misc
Informational
07/07/2022
Installing 4inches of base asphalt today. Coming back on Monday to do surface
Misc
Informational
07/07/2022
Seal-o-matic on site laying top 2.5” of surface asphalt today. 7/5/22 ES Seal-O-Matic completed surface asphalt 7/5/22 ES Parking lot was striped. 7/6/22 ES
Sidewalk Inspection Partial 07/07/2022
Misc
Informational
07/07/2022
ESS sub contractor working on sidewalks between Lot 9 and existing parking lot. Working on ADA ramp coming off south side drive area. 7/7/22 ES
Site Visit Partial 07/15/2022
Misc
Informational
06/20/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/20/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
06/20/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
06/20/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
06/20/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
06/20/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
06/20/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/20/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
06/20/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
06/20/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
06/20/2022
No work being done today. 4/28/22 ES
Misc
Informational
06/20/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
06/20/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
07/15/2022
Crews working on building pad sites. 7/15/22 ES
Site Visit Partial 07/18/2022
Misc
Informational
07/15/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/15/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
07/15/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
07/15/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
07/15/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
07/15/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
07/15/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
07/15/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
07/15/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
07/15/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
07/15/2022
No work being done today. 4/28/22 ES
Misc
Informational
07/15/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
07/15/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
07/15/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES
ESC - (Vegetation/Ground Cover) Partial 07/18/2022
Misc
Informational
07/18/2022
Landscapers have put down mulch and sod around site. 7/18/22 ES
Erosion Control Inspection Partial 4/4/2022 07/18/2022
Misc
Informational
03/28/2022
Gordon Energy installed silt fencing around the property. RP 3-28-22
Misc
Informational
07/18/2022
Lot has landscaping and vegetation, erosion control measures still in place and functioning where needed. 7/18/22 ES
Site Visit Partial 07/19/2022
Misc
Informational
07/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/18/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
07/18/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
07/18/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
07/18/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
07/18/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
07/18/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
07/18/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
07/18/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
07/18/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
07/18/2022
No work being done today. 4/28/22 ES
Misc
Informational
07/18/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
07/18/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
07/18/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES
Grading/Excavation/Fill Inspection Partial 07/20/2022
Misc
Informational
06/07/2022
ESS started grading the site today. RP 3-28-22
Misc
Informational
06/07/2022
Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
06/07/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES ESS working on grading out for sidewalk on North side of lot. 7/20/22 ES
Site Visit Partial 07/20/2022
Misc
Informational
07/19/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/19/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
07/19/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
07/19/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
07/19/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
07/19/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
07/19/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
07/19/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
07/19/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
07/19/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
07/19/2022
No work being done today. 4/28/22 ES
Misc
Informational
07/19/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
07/19/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
07/19/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES Crews working on pad sites, and ESS cutting grade for sidewalks on north side of lot. 7/20/22 ES
ESC - (Vegetation/Ground Cover) Partial 08/01/2022
Misc
Informational
07/18/2022
Landscapers have put down mulch and sod around site. 7/18/22 ES Site is mulched and vegetated. 8/1/22 ES
Erosion Control Inspection Partial 08/01/2022
Misc
Informational
07/18/2022
Gordon Energy installed silt fencing around the property. RP 3-28-22
Misc
Informational
07/18/2022
Lot has landscaping and vegetation, erosion control measures still in place and functioning where needed. 7/18/22 ES Lot has landscaping and vegetation, erosion control measures not as needed. 8/1/22 ES
Pavement-Aggregate Base Passed 08/01/2022
Misc
Informational
06/27/2022
ESS on site working on final grade in preparation for proof roll for pavement. 6/27/22 ES Parking lot in and complete. 8/1/22 ES
Pavement-Stabilized Subgrade Passed 08/01/2022
Misc
Informational
06/30/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES Spoke with Cody this morning. They plan on doing a proof roll on Tuesday morning weather permitting. 6/8/22 ES ESS working on rolling/grading and staking. 6/13/22 ES ESS performed a proof roll on curb sections today using a truck with 20.05 ton load. All areas passed. 6/15/22 ES ESS performed a proof roll for putting down base asphalt using a truck with a 20 ton load. All areas passed. 6/30/22 ES Parking lot completed. 8/1/22 ES
Sanitary Sewer - Camera Test Passed 7/20/2022 08/01/2022
Misc
Informational
06/20/2022
Email sent to water to get this section camera’d. 6/7/22 ES Water was onsite today performing camera testing. 6/16/22 ES Water onsite finishing sewer bond inspection. 6/17/22 ES ESS fixed invert issue. Spoke with Matt, water approved of Sanitary Sewers. 8/1/22 ES
Sidewalk Inspection Partial 08/01/2022
Misc
Informational
07/07/2022
ESS sub contractor working on sidewalks between Lot 9 and existing parking lot. Working on ADA ramp coming off south side drive area. 7/7/22 ES JD Bishop crew poured sidewalk on North end of lot and ADA ramp on south side of entry road. 20 cubic yards of concrete poured. 7/29/22 ES
Site Visit Partial 08/02/2022
Misc
Informational
07/20/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/20/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
07/20/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
07/20/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
07/20/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
07/20/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
07/20/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
07/20/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
07/20/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
07/20/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
07/20/2022
No work being done today. 4/28/22 ES
Misc
Informational
07/20/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
07/20/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
07/20/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES Crews working on pad sites, and ESS cutting grade for sidewalks on north side of lot. 7/20/22 ES
Misc
Informational
08/02/2022
ESS working on transformer pad sites. 9B site crew working also. 8/1/22 ES
Site Visit Partial 08/03/2022
Misc
Informational
08/02/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/02/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
08/02/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
08/02/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
08/02/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
08/02/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
08/02/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
08/02/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
08/02/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
08/02/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
08/02/2022
No work being done today. 4/28/22 ES
Misc
Informational
08/02/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
08/02/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
08/02/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES Crews working on pad sites, and ESS cutting grade for sidewalks on north side of lot. 7/20/22 ES
Misc
Informational
08/02/2022
ESS working on transformer pad sites. 9B site crew working also. 8/1/22 ES No utility work being done. 8/3/22 ES
Site Visit Partial 08/04/2022
Misc
Informational
08/03/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/03/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
08/03/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
08/03/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
08/03/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
08/03/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
08/03/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
08/03/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
08/03/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
08/03/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
08/03/2022
No work being done today. 4/28/22 ES
Misc
Informational
08/03/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
08/03/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
08/03/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES Crews working on pad sites, and ESS cutting grade for sidewalks on north side of lot. 7/20/22 ES
Misc
Informational
08/03/2022
ESS working on transformer pad sites. 9B site crew working also. 8/1/22 ES No utility work being done. 8/3/22 ES No utility work being done. Some work being done around pad/building. 8/4/22 ES
Erosion Control Inspection Partial 08/15/2022
Misc
Informational
08/01/2022
Gordon Energy installed silt fencing around the property. RP 3-28-22
Misc
Informational
08/01/2022
Lot has landscaping and vegetation, erosion control measures still in place and functioning where needed. 7/18/22 ES Lot has landscaping and vegetation, erosion control measures not as needed. 8/1/22 ES Lot has landscaping and vegetation, erosion control measures in as needed. 8/15/22 ES
Site Visit Partial 08/17/2022
Misc
Informational
08/04/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/04/2022
Chlorinated they water line. Tyler’s crew was laying conduit for electrical the rest of the day. RP 4-11-22
Misc
Informational
08/04/2022
Dechlorinated the water line. Tyler’s crew laid conduit for Evergy the rest of the day. RP 4-12-22
Misc
Informational
08/04/2022
Pulled first Bac T sample and delivered to Keystone Laboratories for testing. Tyler’s crew still working on conduit for Evergy. RP 4-13-22
Misc
Informational
08/04/2022
Pulled second sample for Bac Testing, no other work being done on site today. RP 4-14-22
Misc
Informational
08/04/2022
Tyler’s crew worked on a different site today. No work being done today. RP 4-15-22
Misc
Informational
08/04/2022
Second Bac T sample passed testing. Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
08/04/2022
Contractor started dismantling the retaining wall. RP 4-19-22
Misc
Informational
08/04/2022
John from ESS started assembling the new retaining wall. Mike from CFS Engineering is doing the third party inspections for the wall. RP 4-21-22
Misc
Informational
08/04/2022
John’s crew still building the retaining wall. RP 4-22-22
Misc
Informational
08/04/2022
No work being done today. 4/28/22 ES
Misc
Informational
08/04/2022
Rudy’s crew began working on water service lines before being rained out. 4/29/22 ES
Misc
Informational
08/04/2022
Rudy’s crew working on water services and storm line B. 5/3/22 ES ESS doing dirt work. 5/9/22 ES ESS doing dirt work. 5/10/22 ES ESS doing dirt work. 5/11/22 ES Could not perform sanitary sewer tests today as lot was too wet and muddy for Jeremiah to get his truck into the area. 5/27/22 ES No site work being done today. Had to call off sewer testing as unable to get truck or equipment back to manholes. 5/31/22 ES Jeremiah with ESS was onsite performing sanitary sewer inspections. 6/6/22 ES ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES No work being done today with rain last night. 6/8/22 ES Electrical contractors working today. 6/10/22 ES ESS on site working on grading and staking sub base. 6/13/22 ES Did proof roll or curbs with ESS, ESS crew working on cutting curbs and dumpster pad footings. 6/15/22 ES Water was onsite today performing camera testing and ESS crew clearing aggregate from grading. 6/16/22 ES ESS putting in curbs. Water on site performing camera testing. 6/17/22 ES ESS working on curbs. 6/20/22 ES
Misc
Informational
08/04/2022
Crews working on building pad sites. 7/15/22 ES Crews working on building pad site. 7/18/22 ES Crews working on building site and clearing path along north side of site. 7/19/22 ES Crews working on pad sites, and ESS cutting grade for sidewalks on north side of lot. 7/20/22 ES
Misc
Informational
08/04/2022
ESS working on transformer pad sites. 9B site crew working also. 8/1/22 ES No utility work being done. 8/3/22 ES No utility work being done. Some work being done around pad/building. 8/4/22 ES No utility work being done with rain. 8/16/22 ES
Pavement-Surface Passed 08/17/2022
Misc
Informational
07/07/2022
Proof roll passed and Seal-O-Matic will be looking to start paving operations on 7/1. They are still awaiting an approval on change of plan to do 1 - 4” lift of base and 1 - 2.5” lift of surface. 6/30/22 ES
Misc
Informational
07/07/2022
Installing 4inches of base asphalt today. Coming back on Monday to do surface
Misc
Informational
07/07/2022
Seal-o-matic on site laying top 2.5” of surface asphalt today. 7/5/22 ES Seal-O-Matic completed surface asphalt 7/5/22 ES Parking lot was striped. 7/6/22 ES
Water Service Inspection Passed 07/28/2023
Misc
Informational
06/22/2022
Water did 5 taps on site today. Rudy’s crew started working on them and got rained out. 4/29/22 ES
Misc
Informational
06/22/2022
Rudy’s crew finished installing the water meters. Copper ran from main to meters and at least 10’ beyond meter pit. A couple pits will need to be adjusted at final grade. 5/3/22 ES
Misc
Corrective Action Required
06/22/2022
Doing checkup on water meters after pads were graded out and curbs starting. Meter setup on Lot 9C is leaking. Contacted Cody to let him know about this issue for correcting. 6/10/22 ES
ESC - (Vegetation/Ground Cover) Passed 07/28/2023
Misc
Informational
08/01/2022
Landscapers have put down mulch and sod around site. 7/18/22 ES Site is mulched and vegetated. 8/1/22 ES
Storm Sewer Construction Inspection Passed 07/28/2023
Misc
Informational
06/27/2022
Rudy’s crew worked on and completed storm line C. 4/26/22 ES
Misc
Informational
06/27/2022
Rudy’s crew completed storm line D. 4/27/22 ES
Misc
Informational
06/27/2022
Rudy’s crew started on storm line B. Cut into existing inlet B-1 and ran pipe and set box B-2. Will pour collars and inverts tomorrow. 5/3/22 ES
Misc
Informational
06/27/2022
Rudy’s crew completed storm line B. Poured collar for box B-1, collars and inverts for Box B-2 and B-3. 5/4/22 ES ESS was working on fixing storm inlets C-2 and C-3. Nyloplast was broken off during grading. 6/27/22 ES
Grading/Excavation/Fill Inspection Passed 07/28/2023
Misc
Informational
07/20/2022
ESS started grading the site today. RP 3-28-22
Misc
Informational
07/20/2022
Dirt crew is on site grading for the removal of the retaining wall. RP 4-18-22
Misc
Informational
07/20/2022
ESS has a dirt crew on site working on compacting site and putting Tensar TriAx TX5 geogrid with aggregate down. 6/6/22 ES ESS working on grading and compacting aggregate for sub base. 6/7/22 ES ESS working on grading out for sidewalk on North side of lot. 7/20/22 ES
Sidewalk Inspection Passed 07/28/2023
Misc
Informational
08/01/2022
ESS sub contractor working on sidewalks between Lot 9 and existing parking lot. Working on ADA ramp coming off south side drive area. 7/7/22 ES JD Bishop crew poured sidewalk on North end of lot and ADA ramp on south side of entry road. 20 cubic yards of concrete poured. 7/29/22 ES
Pavement-Curb Construction Passed 07/28/2023
Misc
Informational
06/30/2022
Richard’s crew was on site beginning grade cutting for curb lines. 6/15/22 ES Performed a proof roll with Cody from ESS and 3rd party inspector. All areas looked good. 6/15/22 ES ESS was onsite clearing aggregate around edges of curb lines from final cut they performed yesterday. 6/16/22 ES Richard’s crew onsite working on curbs. 6/17/22 ES Richard’s crew working on curbs. 6/20/22 ES Richard’s crew working on curbs and footings for trash pads. Put down 36 cy of concrete total. 6/21/22 ES Richard’s crew continued on curbs, finished all but a couple small sections and where it connects to existing sidewalk. 20 cy of concrete today. 6/22/22 ES Richard’s crew hand poured about 10 cy of curbs today and 36 cy for dumpster pads. 6/22/22 ES Richard’s crew poured dumpster pads and lead up to south base. 6/23/22 ES Richard’s crew was working on curbs they weren’t able to finish last week. 6/27/22 ES Richard’s crew finished up curbs, including replacing some. Also finished pouring wall bases for dumpster pads. 6/28/22 ES
Erosion Control Inspection Passed 7/28/2023 7/28/2023 07/28/2023
Misc
Informational
08/15/2022
Gordon Energy installed silt fencing around the property. RP 3-28-22
Misc
Informational
08/15/2022
Lot has landscaping and vegetation, erosion control measures still in place and functioning where needed. 7/18/22 ES Lot has landscaping and vegetation, erosion control measures not as needed. 8/1/22 ES Lot has landscaping and vegetation, erosion control measures in as needed. 8/15/22 ES 7-28-23 DP. All vegetation has been established.
Documents & Images
Date Uploaded File Type Document Name
03/23/2022 Receipt Receipt for transaction:2022-001603
03/24/2022 Approved Plans Approved FDP - SWP Lot 9 3.24.22
03/24/2022 Letter DE-Permit
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Hydrostatic Test
04/08/2022 Sanitary wye with max adapters
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/18/2022 1st Bac T test
04/18/2022 2nd Bac T test
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Retaining wall base
04/22/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Box B-1 collar
05/12/2022 Box B-2 south collar
05/12/2022 Box B-2 north collar
05/12/2022 Box B-2 invert
05/12/2022 Box B-3 collar and invert
05/12/2022 invert
05/12/2022 invert0
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Curb proof roll ticket
06/30/2022 Base asphalt proof roll ticket
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/05/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/03/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
11/21/2022 SWP 2022 1062 C-2 Broken
11/21/2022 SWP 2022 1062 - Trash pad pillar conflict 3
11/21/2022 SWP 2022 1062 - Trash pad pillar conflict 2
11/21/2022 SWP 2022 1062 - Asphalt low spot
11/21/2022 SWP 2022 1062 - Trash pad pillar conflict 4
11/21/2022 SWP 2022 1062 - Trash pad pillar conflict 1
11/21/2022 SWP 2022 1062 C-2 Repaired 1
11/21/2022 SWP 2022 1062 C-2 Repaired 2
02/13/2023 WU invoice 904 NW Pryor Road
02/14/2023 Receipt Receipt for transaction:2023-000869
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
02/28/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.