Summary


PRSITE20193055
Development - Site
Final Acceptance
METCALF BANK
DEVELOPMENT COMPLETE
The Princeton - site improvement
10/17/2019
01/29/2020
03/08/2023
Locations
Contacts
METCALF BANK, Address:609 NE 291 HWY  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
LEES SUMMIT SENIOR COMMUNITY LLC, Address:5051 S NATIONAL AVE STE 4-100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/17/2019 01/29/2020
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $80.00 $80.00 Paid 10/17/2019
Sanitary Sewer Insp Fees $801.00 $801.00 Paid 10/17/2019
Water Insp Fee $4,390.26 $4,390.26 Paid 10/17/2019
Water Test Fee $200.00 $200.00 Paid 10/17/2019
Storm Sewer Inspection Fee $13,956.81 $13,956.81 Paid 10/17/2019
Paved Surface Inspection Fee $18,738.69 $18,738.69 Paid 10/17/2019
Site Grading Fee $34,804.85 $34,804.85 Paid 10/17/2019
Water Tap Fee $97,356.00 $97,356.00 Paid 10/17/2019
Water Meter Fee $3,829.66 $3,829.66 Paid 10/17/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Partial 03/23/2020
Misc
Informational
03/23/2020
Contractor chlorinated the 12” & 8” Line on 3/20/20 . On 3/23/20 contractor began De-chlorinated . De-chlorination completed @ 5:00pm.
Misc
Informational
04/11/2020
On Thursday,4-09-2020 CL Excavation began installation of the 8” AWWA C900 Fire Line waterline. Contractor installed approx. 200 LF. Of main and a visual inspection was conducted by myself. I informed the contractor that additional rock needed to be place up under the waterman. Contractor compiled adding additional rock forward.
Misc
Informational
04/11/2020
On Friday, 4-10-2020. The contractor resumed installation of Fire Line, 8” waterline. Installed approx. 300 LF of main with all deflection bends required through that section on pipe installed. My visual inspection was completed for proper rock fill and back filling.
Misc
Informational
04/11/2020
On Friday, 4-10-2020. The contractor resumed installation of 8” Fire Line waterline. Installed approx. 300 LF of main with all deflection bends required through that section on pipe installed. My visual inspection was completed for proper rock fill and back filling.
Misc
Informational
04/11/2020
On Sat. 4-11-2020, The Contractor resumed installation of the 8” Fire Linewater main. Installed Approx. 260 LF of 8’ water line and back filled.
Misc
Informational
04/15/2020
No work was performed on Monday, 4-13-2020. To Wet.
Misc
Informational
04/15/2020
Wednesday, 4-15-2020, CL Excavating resumed Fire line 8” water-main installing approx. 260 LF of water line.
Misc
Informational
04/16/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 12” water main. Contractor placed approx. 150 LF of main with necessary bends to around sta. 32+50. Contractor was told on yesterday to place flowable fill over water line where it crosses roadway. That was not placed and soil back fill was placed instead. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/17/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/17/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/20/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/20/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/20/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/21/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/21/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/21/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/21/2020
On Tuesday, 4-21-2020. CL Excavating installed (2) fire hydrants on the fire line and placed approx. 40 LF of 8” water line for the fire line. Also completed some grading.
Misc
Informational
04/23/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/23/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/23/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/23/2020
On Tuesday, 4-21-2020. CL Excavating installed (2) fire hydrants on the fire line and placed approx. 40 LF of 8” water line for the fire line. Also completed some grading.
Misc
Informational
04/23/2020
On Wednesday, 4-22-2020. CP Excavation resumed 8” Fire line. Installed approx. 80 LF with necessary bends. And Thursday 4-23-2020. The contractor installed another 100 LF of fire line. The rain Wednesday night caused contractor to not bring in regular crew size so only (2) Forman’s showed and laid pipe around sta. 14+00.
Misc
Informational
05/21/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
05/21/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
05/21/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
05/21/2020
On Tuesday, 4-21-2020. CL Excavating installed (2) fire hydrants on the fire line and placed approx. 40 LF of 8” water line for the fire line. Also completed some grading.
Misc
Informational
05/21/2020
On Wednesday, 4-22-2020. CP Excavation resumed 8” Fire line. Installed approx. 80 LF with necessary bends. And Thursday 4-23-2020. The contractor installed another 100 LF of fire line. The rain Wednesday night caused contractor to not bring in regular crew size so only (2) Forman’s showed and laid pipe around sta. 14+00.
Water Line - Hydrostatic Test Passed 07/06/2020
Misc
Informational
07/06/2020
On Thursday, 7-02-2020. Sub Contractor CG Excavating Completed the pressure test for the Fire Line. 200 lbs. of pressure was introduced into the 8” Water main. It held pressure for 2 hours and did not lose any pressure passing testing of the fire line.
Misc
Informational
08/26/2020
On Wed, 8-26-2020. The contractor preformed hydrostatic pressure test on 4” private waterline. 150lbs of air pressure was introduced in the line for 2 hours. Passed pressure test.
Site Visit Partial 07/13/2020
Misc
Informational
04/24/2020
Grading continued compaction test were performed as they have been since the project re started. Contractor slowed down and then closed physical work early. Around lunch time.
Misc
Informational
06/09/2020
On Monday, 6–08-2020. CL Excavating paddled around backfilling and placing AB3 subbase. No major work was completed, just moving around dirt.
Misc
Corrective Action Required
06/12/2020
On Thursday 6-11-2020. CL Excavating Failed a proof roll for the back parking lot sub grade. Contractor will figure out solution of how the either remove the bad materials or till up base and re-compact or add shot rock for stabilization.
Misc
Informational
06/12/2020
Contractor completed some AB3 sub-base installation for the outer road at the entrance of the facility. Geo grid was also placed before rock placement.
Misc
Corrective Action Required
06/16/2020
On Tuesday 6-16-2020. CL Excavating tried to work proposed parking lot’s sub grade that had failed the compaction test. It was determined by the contractor to remove 14” of fill and replace it with rock fill.
Misc
Resolved
06/23/2020
On Tuesday, 6-23-2020. CP Excavating and Olson consultants agreed to remove bad soil and fill with shot rock (3” to 6”) to stabilize subbase. Contractor is completing soil removals and installing rock in back section of parking lot.
Misc
Informational
06/24/2020
CP Excavating continued rock and AB3 installation at the back parking lot area.
Misc
Informational
06/26/2020
On Thursday 6-25-2020. CL Excavating resumed AB3 fill for parking lot at the back of the project. Approx. 800 ton of rock fill was placed.
Misc
Corrective Action Required
06/26/2020
On Friday 6-26-2020. Contractor backed into City line fire hydrant and hydrant will need to be replaced and what ever damaged that was done to main fixed. Water was cut off prior to me finding the break. Also contractor broke Storm Sewer plastic intake structure and will need to replace it also. A small amount of AB3 fill was placed.
Misc
Informational
07/01/2020
On Monday, 6-20-2020. CL Excavating completed a repair for the Nyloplastic D.B. Structure #103. Contractor was told to replace the structure, but contractor decided against replacement. Contractor was told to get the Design Engineers to sign off on repair before acceptance of city.
Misc
Informational
07/13/2020
On Thursday, 7-09-2020. A proof roll was conducted and curb passed testing. Contractor can start curb installation.
Misc
Informational
07/13/2020
On Monday, 7-13-2020. CG Excavating completes low level of rock sub-base sub-grading through out project. One man working.
Misc
Informational
07/17/2020
On Friday, 7-17-2020. CG Excavating reinstalled the nylo-plastic DB #502 on line 500 that was destroyed by them earlier. They also cut and adjusted the CI junction box that was installed to high earlier.
Misc
Informational
07/25/2020
On Thursday, 7-23-2020 CG Excavating completed some punchlist items through out project. And completed some grading at various spots.
Misc
Informational
07/25/2020
On Friday, 7-24-2020. CG Excavating completed small items of punchlist. Graded for sidewalk on Princton Dr. Adjusted (2) CI lids. Graded subgrade for curb installation.
Misc
Informational
08/17/2020
Project has been setting idle for about a week and no one is working. Today 8-17-2020, Mitch of CL Excavating Did a small amount of rock grading. I told Mitch to get the asphalt completed at the top of the project on Ranson rd.
Misc
Informational
08/18/2020
Contractor working today installing rock fill for Princton dr and outer road areas. Contractor also compacted sub-base.
Misc
Informational
08/21/2020
On Thursday, 8-20-2020. CG Excavating worked grading rock sub-base through out project and compacted base placed.
Misc
Informational
08/26/2020
On Friday, 8-21-2020. Contractor CG Excavating resumed rock sub-grade fill throughout project. Very slow process. (1) man completing fill and compaction.
Misc
Informational
08/26/2020
On and around 8-21-2020. I was notified the contractor had lift a board or some object in the existing Sanitary MH that the contractor tied in to the project and it backed up sewage on homes behind the project. Water services are out videoing the line and after review will submit finding to Development Services and the general contractor.
Misc
Informational
08/26/2020
On Monday, 8-24-2020. CG Excavating again completed sub-grade prep for asphalt installation. Contractor fine tuning sub-grade and compacting.
Misc
Informational
09/04/2020
Wednesday 8-26-2020, Contractor resumed sub-grade prep for asphalt installation.
Misc
Informational
09/04/2020
On Thursday, 8-27-2020. Contractor dug out sub-base for access roadway in the front of the entrance for the outer road and compacted sub-base.
Misc
Informational
11/18/2020
As of today, Wednesday, 11-18-2020. No work is being completed except the building is being erected. Not inspection work is needed at this time.
Misc
Informational
12/23/2021
Thursday, 12-23-2021 C&L Excavating began grading Detention base and installed Field inlet structure and pipe were special draining soil, rock fill and geo-grid and filter fabric is to be placed at the perimeter of the detention basin. Approx 40LF of 24” HDPE pipe with Concrete end section is installed. Contractor graded detention basin. Contractor also placed approx 120 LF of 6” HDPE pipe connecting to the newly installed field inlet structure.
Water Line - Fire Hydrant Partial 07/23/2020
Misc
Informational
07/23/2020
On Saturday, 7-18-2020. CG Excavating relocated a fire hydrant that was installed out in the gutter line of the curb on Princton Dr. The hydrant will need to be adjusted because it is crooked.
Pavement-Curb Construction Passed 07/25/2020
Misc
Informational
07/25/2020
O 7-23-2020. Freedom Concrete came late Wednesday evening and used curb machine to grade for curb installation on tomorrow morning
Misc
Informational
07/25/2020
On Thursday,-7-23-2020. Freedom Concrete poured CG-1 curb on Princton Dr. Did not pour throats for CI’s because the were not adjusted.
Water Line - Coliform Test 1 Passed 09/04/2020
Misc
Informational
09/04/2020
On Monday, 8-31-2020. A water sample was taken for the domestic line and passed . A 2nd test sample was taken on 9-02-2020.
Street - Wedge Lift Partial 09/21/2020
Misc
Informational
09/21/2020
On Saturday, 9-19-2020. Thorne and Son asphalt placed Base lift of asphalt on Princton street and placed private parking lot’s partial base lift as well. On Thursday, 12-16-2021. Phillips Asphalt Placing Base asphalt on parking lot at various areas through parking lot. Superintendent was notified temp was only 46 degrees and does not meet cities temp to lay surface asphalt.
Pavement-Proof Roll Passed 09/21/2020
Misc
Informational
05/20/2020
On Tuesday, 5-19-2020. CL Excavating preformed a proof roll on the subgrade. Some of the roadway seem questionable and the contractor was directed to dig some of the soft spots out. Some AB3 rock was installed and compacted.
Misc
Informational
05/20/2020
On Wednesday, 5-20-2020. The contractor resumed subgrade rock fill with geo grid.
Misc
Informational
05/21/2020
On Wednesday, 5-20-2020. The contractor resumed subgrade rock fill with geo grid.
Misc
Informational
09/21/2020
On Friday 9-18-2020. A roadway proof roll was completed by myself and Olson consultants. Proof roll passed for placement the first lift of base.
Sanitary Sewer - Vacuum Passed 09/21/2020
Misc
Informational
09/21/2020
On Friday, 9-18-2020 CL Excavating performed the MH vacuum test for the Sanitary System. Man Hole held 10 LBS of vacuum for 2 min. And passed vacuum test.
Sanitary Sewer - Mandrel Passed 09/21/2020
Misc
Informational
09/21/2020
On Friday, 9-18-2020. CL Excavating performed a mandrel test for the 188 LF Sanitary Sewer installed. Mandrel passed through the 8” pipe passing inspection.
Driveway Inspection Passed 10/20/2021
Misc
Informational
10/22/2021
On Friday 10-22-2021. Freedom Concrete formed and poured main driveway in front of Senior Living apt.
Sidewalk Inspection Partial 01/31/2022
Misc
Informational
10/22/2021
On Friday 10-22-2021, Freedom Concrete placed approx 800 LF of 5’ wide sidewalk in front if Senior Living next to the outer roadway. On Monday, 1-31-2022. Visited project and found contractor has formed sidewalk and (1) ADA Ramp south of the front entrance. Forming and sub-grade passes for concrete placement.
Misc
Informational
05/19/2022
On Thursday, 5-19-2022. Freedom concrete formed and poured approx 300 LF of 4’ wide sidewalk where the office trailers were at the far southeast end of the project.
Install Street and Stop Signs Passed 01/31/2022
Misc
Informational
01/31/2022
On Monday, 1-31-2022. Contractor has placed all signage at entrances of project.
Record Drawing Review Passed 3/25/2022 03/24/2022
Sidewalk Inspection Passed 04/19/2022
Misc
Informational
01/31/2022
On Friday 10-22-2021, Freedom Concrete placed approx 800 LF of 5’ wide sidewalk in front if Senior Living next to the outer roadway. On Monday, 1-31-2022. Visited project and found contractor has formed sidewalk and (1) ADA Ramp south of the front entrance. Forming and sub-grade passes for concrete placement.
Water Line - Hydrostatic Test Passed 04/19/2022
Pavement-Curb Construction Passed 04/19/2022
Street - Wedge Lift Passed 04/19/2022
Misc
Informational
09/21/2020
On Saturday, 9-19-2020. Thorne and Son asphalt placed Base lift of asphalt on Princton street and placed private parking lot’s partial base lift as well.
Water Line - Construction Inspection Passed 04/19/2022
Misc
Informational
04/28/2020
Contractor chlorinated the 12” & 8” Line on 3/20/20 . On 3/23/20 contractor began De-chlorinated . De-chlorination completed @ 5:00pm.
Misc
Informational
04/28/2020
On Thursday,4-09-2020 CL Excavation began installation of the 8” AWWA C900 Fire Line waterline. Contractor installed approx. 200 LF. Of main and a visual inspection was conducted by myself. I informed the contractor that additional rock needed to be place up under the waterman. Contractor compiled adding additional rock forward.
Misc
Informational
04/28/2020
On Friday, 4-10-2020. The contractor resumed installation of Fire Line, 8” waterline. Installed approx. 300 LF of main with all deflection bends required through that section on pipe installed. My visual inspection was completed for proper rock fill and back filling.
Misc
Informational
04/28/2020
On Friday, 4-10-2020. The contractor resumed installation of 8” Fire Line waterline. Installed approx. 300 LF of main with all deflection bends required through that section on pipe installed. My visual inspection was completed for proper rock fill and back filling.
Misc
Informational
04/28/2020
On Sat. 4-11-2020, The Contractor resumed installation of the 8” Fire Linewater main. Installed Approx. 260 LF of 8’ water line and back filled.
Misc
Informational
04/28/2020
No work was performed on Monday, 4-13-2020. To Wet.
Misc
Informational
04/28/2020
Wednesday, 4-15-2020, CL Excavating resumed Fire line 8” water-main installing approx. 260 LF of water line.
Misc
Informational
04/28/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 12” water main. Contractor placed approx. 150 LF of main with necessary bends to around sta. 32+50. Contractor was told on yesterday to place flowable fill over water line where it crosses roadway. That was not placed and soil back fill was placed instead. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/28/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/28/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/28/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/28/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/28/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/28/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/28/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/28/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/28/2020
On Tuesday, 4-21-2020. CL Excavating installed (2) fire hydrants on the fire line and placed approx. 40 LF of 8” water line for the fire line. Also completed some grading.
Misc
Informational
04/28/2020
On Thursday, 4-16-2020. C&P Excavations resumed installation of the 8” Fire Line water main. Contractor placed approx. 150 LF of main with necessary bends. Also contractor used concrete bags for thrust blocks. Will discuss Contractors method to follow spec’s.
Misc
Informational
04/28/2020
On Friday, 4-17-2020. No work was performed. Rained!
Misc
Informational
04/28/2020
On 4-20-2020. CL Excavation resumed installation of the 8” fire line. Almost at tie - in at sta.16+19.75.
Misc
Informational
04/28/2020
On Tuesday, 4-21-2020. CL Excavating installed (2) fire hydrants on the fire line and placed approx. 40 LF of 8” water line for the fire line. Also completed some grading.
Misc
Informational
04/28/2020
On Wednesday, 4-22-2020. CP Excavation resumed 8” Fire line. Installed approx. 80 LF with necessary bends. And Thursday 4-23-2020. The contractor installed another 100 LF of fire line. The rain Wednesday night caused contractor to not bring in regular crew size so only (2) Forman’s showed and laid pipe around sta. 14+00.
Water Line - Fire Hydrant Passed 04/19/2022
Misc
Informational
07/23/2020
On Saturday, 7-18-2020. CG Excavating relocated a fire hydrant that was installed out in the gutter line of the curb on Princton Dr. The hydrant will need to be adjusted because it is crooked.
Storm - Material Verification Passed 04/19/2022
Sanitary Sewer Construction Inspection Passed 04/19/2022
Sanitary - Material Verification Passed 04/19/2022
Water - Material Verification Passed 04/19/2022
ESC - (Vegetation/Ground Cover) Passed 04/19/2022
Storm - Swales Passed 04/19/2022
Storm - Pipe Partial 04/19/2022
Misc
Informational
03/31/2020
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
03/31/2020
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
03/31/2020
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
04/11/2020
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/11/2020
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/11/2020
On Friday, 4-10-2020. Contractor resumed installation of the storm sewer. Contractor installed approx. 130 LF of 24” storm sewer and set 105 DB - 30” Nyloplast on line 100.
Misc
Informational
04/11/2020
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/11/2020
On Friday, 4-10-2020. Contractor resumed installation of the storm sewer. Contractor installed approx. 130 LF of 24” storm sewer and set 105 DB - 30” Nyloplast on line 100.
Misc
Corrective Action Required
04/11/2020
On Sat. 4-11-2020 It was determined during installation of 106-DB Nyloplastic DB, the flow line elev. in-for the 10” HDPE pipe was approx. 1 in. Lower then the 18” HP pipe. The elev. difference should be .38 higher then the 18” flow line in. Contractor has stop all pipe installation for that intersecting DB and will have another Nyloplastic base made. Contractor continued to install 60 LF10” pipe from 105-DB towards 301 DB.
Misc
Resolved
04/29/2020
On 4-12-2020, the 106-DB Nyloplastic DB was removed during installation because the flow line in for the 16” HDPE pipe was incorrect. Another base was delivered and set today along with the final 24” HDPE pipe.
Storm - Material Verification Passed 04/19/2022
Street - Surface Course Passed 04/19/2022
Water Line - Construction Inspection Passed 03/08/2023
Misc
Informational
04/02/2020
On Wednesday 4-01-2020 Contractor installed (2) meter Boxes. For vaults.
Misc
Informational
04/02/2020
On 4-02-2020 the contractor adjusted both vaults set day before. They were both off on elevation and back filled and set lids.
Misc
Corrective Action Required
04/28/2020
Reviewed plans with Contractor (primary & sub) to fix deficiencies found during the Water inspection of the Public Water Main for Princeton project. Work will begin on 4/29/20 Wednesday.
Misc
Informational
04/28/2020
On Tuesday, 4-28-2020, CL Excavation resumed installation of the Fire Line tieing in at the building at both South and east side of building.
Misc
Informational
04/29/2020
On Tuesday, 4-28-2020, CL Excavation resumed installation of the Fire Line tieing in at the building at both South and east side of building.
Misc
Informational
04/29/2020
Wednesday, 4-29-2020. The contractor resumed private fire line installation into the building.
Misc
Informational
05/01/2020
On Tuesday, 4-28-2020, CL Excavation resumed installation of the Fire Line tieing in at the building at both South and east side of building.
Misc
Informational
05/01/2020
Wednesday, 4-29-2020. The contractor resumed private fire line installation into the building.
Misc
Informational
05/01/2020
On Friday, 5-01-2020. The contractor resumed water line installation. Installed the 4” to 8” back flow preventers meter and approx. 30 LF of pipe for vault. Also completed 3” meter vault with necessary pipe for vault.
Misc
Informational
05/06/2020
On Tuesday, 4-28-2020, CL Excavation resumed installation of the Fire Line tieing in at the building at both South and east side of building.
Misc
Informational
05/06/2020
Wednesday, 4-29-2020. The contractor resumed private fire line installation into the building.
Misc
Informational
05/06/2020
On Friday, 5-01-2020. The contractor resumed water line installation. Installed the 4” to 8” back flow preventers meter and approx. 30 LF of pipe for vault. Also completed 3” meter vault with necessary pipe for vault.
Misc
Informational
05/06/2020
On 5-06-2020. Contractor CL Excavation while searching for the isolation valve for hydrant068-131 the contractor disturbed the main, causing a leak in the line. Contractor had to shut water line off and repair the leak in the line. The hydrant was reinstalled. Contractor also exposed some tracer wires where requested.
Misc
Informational
05/07/2020
Contractor C&L Excavation completed water dept. punch list and some street grading.
Misc
Informational
05/11/2020
Contractor C&L Excavation completed water dept. punch list and some street grading.
Misc
Informational
05/11/2020
On Monday 5-11-2020. The contractor resumed 4” fire line installation installed limited amount and completed little road way grading
Misc
Informational
05/21/2020
Contractor C&L Excavation completed water dept. punch list and some street grading.
Misc
Informational
05/21/2020
On Monday 5-11-2020. The contractor resumed 4” fire line installation installed limited amount and completed little road way grading
Misc
Informational
06/04/2020
On Wednesday 6-03-2020. CL Excavating removed a illegal tap that was placed on a 8” City Main and installed a “T” to correct there mistake at sta. 0+00 where it tie’s to the back flow vault.
Misc
Informational
06/04/2020
On Thursday 6-04-2020. CL Excavating removed a illegal tap placed on the cities 15” main and installed the correct Tee and valve specified off of the 15” to 4” line to the vault .
Misc
Informational
06/09/2020
On Monday, 6-08-2020. CL Excavating poured the trust block for the Tee that was placed on Thursday of last week.
Misc
Informational
06/09/2021
On Tuesday, 6-09-2021. A fire line flush was performed and passed visual testing. Drew of Orielly’s, and Mitch for CG construction where present.
Misc
Informational
02/15/2022
On Tuesday, 2-15-2022. A water sample was retrieved and taken to lab for bacteria testing. It had been determined the samples taken on 8-31-2020 and 9-02-2020 did not have con secular passing test. Testing for the domestic line will be completed again for water approval clearance.
Misc
Informational
02/16/2022
On Tuesday, 2-15-2022. A water sample was retrieved and taken to lab for bacteria testing. It had been determined the samples taken on 8-31-2020 and 9-02-2020 did not have con secular passing test. Testing for the domestic line will be completed again for water approval clearance. On Wednesday 2-16-2022. Water samples #2 were taken to Keystone Lab for bacteria testing. Contractor held a walk through with city for occupancy. Pending water sample results, Occupancy will be given.
Sanitary - Material Verification Passed 03/08/2023
Sanitary Sewer Construction Inspection Passed 03/08/2023
Sanitary Sewer - Air Test Passed 03/08/2023
Water Line - Coliform Test 1 Passed 03/08/2023
Water Line - Hydrostatic Test Passed 03/08/2023
Sanitary Sewer - Air Test Passed 03/08/2023
Water - Material Verification Passed 03/08/2023
Storm - Pipe Passed 03/08/2023
Misc
Informational
04/19/2022
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
04/19/2022
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
04/19/2022
3-31-2020 Contractor installed approx. 150 LF of 12” HDPE pipe for line 1200 and back filled.
Misc
Informational
04/19/2022
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/19/2022
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/19/2022
On Friday, 4-10-2020. Contractor resumed installation of the storm sewer. Contractor installed approx. 130 LF of 24” storm sewer and set 105 DB - 30” Nyloplast on line 100.
Misc
Informational
04/19/2022
On Thursday, 4-09-2020. CL Excavating Began the installation of line 100 starting at 104 DB 30” Nyloplast Db at sta. 5+40.69. Contractor installed approx. 100 LF. Of 24” HDPE pipe with rock fill.
Misc
Informational
04/19/2022
On Friday, 4-10-2020. Contractor resumed installation of the storm sewer. Contractor installed approx. 130 LF of 24” storm sewer and set 105 DB - 30” Nyloplast on line 100.
Misc
Corrective Action Required
04/19/2022
On Sat. 4-11-2020 It was determined during installation of 106-DB Nyloplastic DB, the flow line elev. in-for the 10” HDPE pipe was approx. 1 in. Lower then the 18” HP pipe. The elev. difference should be .38 higher then the 18” flow line in. Contractor has stop all pipe installation for that intersecting DB and will have another Nyloplastic base made. Contractor continued to install 60 LF10” pipe from 105-DB towards 301 DB.
Documents & Images
Date Uploaded File Type Document Name
10/17/2019 Receipt Receipt for transaction: 2019-006857
01/29/2020 Letter DE-Permit
01/29/2020 Letter DE-Permit
01/31/2020 DE-Permit Signed
03/23/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
10/20/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
12/16/2021 Letter INSPECTION SUMMARY
01/31/2022 Letter INSPECTION SUMMARY
01/31/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
03/24/2022 ACCEPTED DET RECORD DRAWINGS
03/25/2022 Letter INSPECTION SUMMARY
04/21/2022 Passing Water Samples Princeton
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter DE-Certificate of Substantial Completion Single Lot
08/09/2022 The Princeton ( Senior Living Community) Site Substantial Completion
08/09/2022 The Princeton ( Senior Living Community) On Site Punch List
03/08/2023 Letter DE-Certificate of Final Acceptance (Commercial)
03/08/2023 The Princeton Site Improvements Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home