Summary


PRSITE20191865
Development - Site
Final Acceptance
TUSTIN LLC
DEVELOPMENT COMPLETE
REECE NICHOLS SITE DEVELOPMENT
07/15/2019
07/18/2019
07/10/2023
03/20/2023
Locations
Contacts
TUSTIN LLC, Address:8375 NIEMAN RD  
Not shown for privacy reasons.
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/15/2019 07/17/2019
Joe Starlin
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $388.60 $388.60 Paid 07/16/2019
91100C9-Water Insp Fee $104.76 $104.76 Paid 07/16/2019
9110072-Water Test Fee $400.00 $400.00 Paid 07/16/2019
9110068-Storm Fee $494.36 $494.36 Paid 07/16/2019
9110081-Paved Surface Inspection Fee $3,109.75 $3,109.75 Paid 07/16/2019
9110071-Site Grading Fee $2,215.73 $2,215.73 Paid 07/16/2019
8350015-Water Meter Fee $1,312.34 $1,312.34 Paid 07/16/2019
8331401-Water Tap Fee $18,204.00 $18,204.00 Paid 07/16/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/16/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 7/17/2019 at 2:30 PM 07/18/2019
Misc
Informational
07/18/2019
Joe Starlin 07/18/2019 7:24 AM On 7-17-19 at 2:30pm The crew installed storm pipe on the north side of the site and backfilled with type 5 in 8" lifts.
Storm - Material Verification Passed 7/18/2019 07/18/2019
Misc
Informational
07/18/2019
7-18-19 All material onsite appears to meet spec.
Water Line - Construction Inspection Partial 7/23/2019 07/23/2019
Misc
Informational
07/23/2019
7-23-19 10:00am They are running the fire line and setting a valve for the building.
Misc
Informational
07/23/2019
7-23-19 10:00am They are running the fire line and setting a valve for the building.
Misc
Informational
07/23/2019
7-23-19 10:00am They are running the fire line and setting a valve for the building.
Site Visit Partial 7/23/2019 10/10/2019
Misc
Informational
07/23/2019
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
10/10/2019
10-10-19 I met with Darell to give him revised plans.
Erosion Control Inspection Partial 10/31/2019 10/31/2019
Misc
Informational
10/31/2019
10-31-19 9:14am 28 degrees outside. There appears to be no erosion control issues.
Site Visit Partial 11/14/2019 11/18/2019
Misc
Informational
10/10/2019
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
10/10/2019
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
11/18/2019
11-18-19 There was no activity on site at this time.
Site Visit Partial 02/18/2020
Misc
Informational
11/18/2019
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
11/18/2019
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
11/18/2019
11-18-19 There was no activity on site at this time.
Misc
Informational
02/18/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Erosion Control Inspection Partial 2/21/2020 02/21/2020
Misc
Informational
10/31/2019
10-31-19 9:14am 28 degrees outside. There appears to be no erosion control issues.
Misc
Informational
02/21/2020
2-21-20 11:10am All erosion controls appear to be in place at this time.
Erosion Control Inspection Partial 2/25/2020 02/25/2020
Misc
Informational
02/21/2020
10-31-19 9:14am 28 degrees outside. There appears to be no erosion control issues.
Misc
Informational
02/21/2020
2-21-20 11:10am All erosion controls appear to be in place at this time.
Misc
Informational
02/25/2020
2-25-20 Steve Robbins stoped and told them to clean the streets. 9:55am I just spoke with the superintendent about correcting their construction intrance with new rock 50’ in. I informed them that the construction intrance needs to be addressed ASAP or there will be a stop work order.
Sanitary Sewer Construction Inspection Partial 3/23/2020 03/23/2020
Misc
Informational
03/23/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Sanitary Sewer Construction Inspection Partial 3/25/2020 03/25/2020
Misc
Informational
03/25/2020
3-25-20 11:55am They have plunged the manhole on the north side and are working on The manhole to the south. I have a pic of the north side manhole after being plunged.
Misc
Informational
03/25/2020
3-25-20 3:05pm They have plunged all manholes now and filled the manhole at the north end of the site with rock. They will fill the others with rock and be ready for inspection tomorrow 3-26-20.
Storm - Pipe Partial 7/18/2019 03/26/2020
Misc
Informational
07/18/2019
Joe Starlin 07/18/2019 7:24 AM The crew installed storm pipe on the north side of the site and backfilled with type 5 in 8" lifts.
Misc
Informational
03/20/2020
3-20-20
Misc
Informational
03/20/2020
3-20-20
Misc
Informational
03/26/2020
3-26-20 They have 70’ feet of 10” storm pipe installed.
Sanitary Sewer Construction Inspection Partial 3/30/2020 03/27/2020
Misc
Informational
03/27/2020
They have got one stick of pipe installed today due to rock.
Sidewalk Inspection Partial 03/30/2020
Misc
Informational
03/30/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Storm - Pipe Partial 04/02/2020
Misc
Informational
03/26/2020
Joe Starlin 07/18/2019 7:24 AM The crew installed storm pipe on the north side of the site and backfilled with type 5 in 8" lifts.
Misc
Informational
03/26/2020
3-20-20
Misc
Informational
03/26/2020
3-20-20
Misc
Informational
03/26/2020
3-26-20 They have 70’ feet of 10” storm pipe installed.
Misc
Informational
04/02/2020
4-2-20 They have all the storm pipe ran on the south end of the site.
Sanitary Sewer Construction Inspection Partial 04/07/2020
Misc
Informational
04/01/2020
4-7-20 1:27pm They connected the sanitary service line to the main for the future building. I will be checking the trench check at a later date.
Sanitary Sewer Construction Inspection Partial 4/8/2020 04/08/2020
Misc
Informational
04/07/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/08/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Sanitary Sewer Construction Inspection Partial 4/10/2020 04/10/2020
Misc
Informational
04/08/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/08/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Misc
Informational
04/10/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/10/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Sanitary Sewer Construction Inspection Partial 4/13/2020 04/13/2020
Misc
Informational
04/10/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/10/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Misc
Informational
04/10/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/10/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/13/2020
4-13-20 3:15pm they have installed 14 foot of sanitary service line and poured a trench check.
Sanitary Sewer Construction Inspection Partial 4/14/2020 04/14/2020
Misc
Informational
04/13/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/13/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Misc
Informational
04/13/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/13/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/13/2020
4-13-20 3:15pm they have installed 14 foot of sanitary service line and poured a trench check.
Misc
Informational
04/14/2020
414-20 9:58am They have installed approximately 14’ of sanitary service line and will be backfilling with flowable fill. 1pm They have backfilled with flowable fill.
Sanitary Sewer Construction Inspection Partial 4/15/2020 04/16/2020
Misc
Informational
04/14/2020
414-20 9:58am They have installed approximately 14’ of sanitary service line and will be backfilling with flowable fill. 1pm They have backfilled with flowable fill.
Misc
Informational
04/14/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/14/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Misc
Informational
04/14/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/14/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/14/2020
4-13-20 3:15pm they have installed 14 foot of sanitary service line and poured a trench check. 4-16-20 3:25pm They have installed 33’ of sanitary service line with wire and plenty of rock.
Sanitary Sewer Construction Inspection Partial 04/20/2020
Misc
Informational
04/16/2020
414-20 9:58am They have installed approximately 14’ of sanitary service line and will be backfilling with flowable fill. 1pm They have backfilled with flowable fill.
Misc
Informational
04/16/2020
3-23-20 At 10;55am I looked at the sanitary service line coming out of the building approximately 20ft. They had plenty of rock and will be placing tracer wire.
Misc
Informational
04/16/2020
4-8-20 10:27am They have the wye cut in and approximately 20’ of service line connected. They have poured a trench check next to the power pole. They have tracer wire taped to the service line.
Misc
Informational
04/16/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/16/2020
4-10-20 11:50am They have cut in the wye for the sanitary service line for Reece Nichols building. They will be covering with rock and using flowable fill.
Misc
Informational
04/16/2020
4-13-20 3:15pm they have installed 14 foot of sanitary service line and poured a trench check. 4-16-20 3:25pm They have installed 33’ of sanitary service line with wire and plenty of rock. 4-20-20 1:40pm They have tied in the sanitary service line for the Reece Nichols building.
Sidewalk Inspection Partial 04/21/2020
Misc
Informational
03/30/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
04/01/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec.
Sidewalk Inspection Partial 04/27/2020
Misc
Informational
04/21/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
04/21/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building.
Site Visit Partial 04/30/2020
Misc
Informational
02/18/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
02/18/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
02/18/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
02/18/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
03/17/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out.
Sidewalk Inspection Partial 05/05/2020
Misc
Informational
04/27/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
04/27/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20.
Sidewalk Inspection Partial 05/06/2020
Misc
Informational
05/05/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
05/05/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish.
Sidewalk Inspection Partial 05/07/2020
Misc
Informational
05/06/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
05/06/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour.
Pavement-Curb Construction Partial 5/12/2020 05/12/2020
Misc
Informational
05/12/2020
5-12-20 Steve Robbins and I inspected the curb line for the parking lot. They installed type 5 base and have it compacted. They will be forming up and pouring at a later date.
Pavement-Curb Construction Partial 5/15/2020 05/18/2020
Misc
Informational
05/18/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street.
Pavement-Curb Construction Partial 5/19/2020 05/19/2020
Misc
Informational
05/18/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street. 5-19-20 They are pulling forms and will be pouring more curb later today. They have poured the curb on the west side.
Grading/Excavation/Fill Inspection Partial 5/21/2020 05/21/2020
Misc
Informational
05/21/2020
5-21-20 They are laying geo-grid down and base rock.
Site Visit Partial 05/26/2020
Misc
Informational
04/30/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
04/30/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
04/30/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
04/30/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
04/30/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather.
Site Visit Partial 05/28/2020
Misc
Informational
05/26/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
05/26/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
05/26/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
05/26/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
05/26/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather. 5-28-20 There is no activity on site due to weather. It has been raining all day.
Site Visit Partial 5/29/2020 5/29/2020 05/29/2020
Misc
Informational
05/28/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
05/28/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
05/28/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
05/28/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
05/28/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather. 5-28-20 There is no activity on site due to weather. It has been raining all day. 5-29-20 We met for a TCO but there sidewalk is not installed along with other issues.
Sidewalk Inspection Partial 05/29/2020
Misc
Informational
05/07/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
05/07/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour. 5-29-20 They have formed up the sidewalk in front of the front door with the trench drain. They are pouring now.
Sidewalk Inspection Partial 6/1/2020 6/1/2020 06/01/2020
Misc
Informational
05/29/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
05/29/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour. 5-29-20 They have formed up the sidewalk in front of the front door with the trench drain. They are pouring now. 6-1-20 They have the sidewalk formed up going to the front door. They will be pouring at approximately 2:30pm.
Proof roll parking lot Partial 6/3/2020 6/3/2020 06/03/2020
Misc
Informational
06/03/2020
6-3-20 1:59pm We are proof rolling the parking lot on the west side of the building. Rain is forecasted for this evening. The proof roll passed with corrections to be made at the south west corner.
Pavement-Curb Construction Partial 6/8/2020 6/8/2020 06/08/2020
Misc
Informational
05/19/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street. 5-19-20 They are pulling forms and will be pouring more curb later today. They have poured the curb on the west side. 6-8-20 7:05am They are pouring the curb in the parking lot on the west side of the building. They are done for the day. They have the islands poured. They used white cure.
Pavement-Curb Construction Partial 6/9/2020 6/9/2020 06/10/2020
Misc
Informational
06/08/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street. 5-19-20 They are pulling forms and will be pouring more curb later today. They have poured the curb on the west side. 6-8-20 7:05am They are pouring the curb in the parking lot on the west side of the building. They are done for the day. They have the islands poured. They used white cure. 6-9-20 8:58am They are pouring more curb on the SW corner of the parking lot. 6-10-20 11:02am All of the curb is poured.
Proof roll parking lot Passed 06/12/2020
Misc
Informational
06/03/2020
6-3-20 1:59pm We are proof rolling the parking lot on the west side of the building. Rain is forecasted for this evening. The proof roll passed with corrections to be made at the south west corner.
Misc
Informational
06/12/2020
6/12//20 1:50pm Proof roll pass for the alleyway.
Street - Surface Course Partial 6/13/2020 6/13/2020 06/13/2020
Misc
Informational
06/13/2020
6-13-20 6:53am They have poured out one truck at this time. The north end of the parking lot is poured and now they are working on the allley on the south side of the lot. They have approximately 30 yards on the ground. They are finished with the pour. They will be curing then there done for the day.
Sidewalk Inspection Partial 06/15/2020
Misc
Informational
06/01/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
06/01/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour. 5-29-20 They have formed up the sidewalk in front of the front door with the trench drain. They are pouring now. 6-1-20 They have the sidewalk formed up going to the front door. They will be pouring at approximately 2:30pm. 6-15-20 1:31pm The sidewalk is poured on the north side of the parking lot and the east side of the building.
Street - Surface Course Partial 6/16/2020 6/16/2020 06/16/2020
Misc
Informational
06/13/2020
6-13-20 6:53am They have poured out one truck at this time. The north end of the parking lot is poured and now they are working on the allley on the south side of the lot. They have approximately 30 yards on the ground. They are finished with the pour. They will be curing then there done for the day. 6-16-20 They have poured another section of the parking lot on the west side of the site.
Water Line - Construction Inspection Partial 06/17/2020
Misc
Informational
06/17/2020
6-17-20 10:24AM The water department has made the tap for the two inch waterline. They have the meter set and the copper line installed. They are getting ready to backfill.
Street - Surface Course Partial 6/17/2020 6/17/2020 06/17/2020
Misc
Informational
06/16/2020
6-13-20 6:53am They have poured out one truck at this time. The north end of the parking lot is poured and now they are working on the allley on the south side of the lot. They have approximately 30 yards on the ground. They are finished with the pour. They will be curing then there done for the day. 6-16-20 They have poured another section of the parking lot on the west side of the site. 6-17-20 1:13pm They have the section of Maple at the water tap ready to pour back. They are using a 5k mix with a burlap finish. 2:45pm They are finishing the concrete now.
Site Visit Partial 6/18/2020 6/18/2020 06/18/2020
Misc
Informational
05/29/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
05/29/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
05/29/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
05/29/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
05/29/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather. 5-28-20 There is no activity on site due to weather. It has been raining all day. 5-29-20 We met for a TCO but there sidewalk is not installed along with other issues. 6-18-20 Steve Robbins and I met on site to look at the alley and sidewalk to decide what direction the contractor needs to go. I will be meeting Bob Burns on site later.
Site Visit Partial 06/18/2020
Misc
Informational
06/18/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
06/18/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
06/18/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
06/18/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
06/18/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather. 5-28-20 There is no activity on site due to weather. It has been raining all day. 5-29-20 We met for a TCO but there sidewalk is not installed along with other issues. 6-18-20 Steve Robbins and I met on site to look at the alley and sidewalk to decide what direction the contractor needs to go. I will be meeting Bob Burns on site later. 6-18-20 9:50am I met Bob Burns and we explained to the contractor what is needed in the alley.
Pavement-Curb Construction Partial 06/18/2020
Misc
Informational
06/10/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street. 5-19-20 They are pulling forms and will be pouring more curb later today. They have poured the curb on the west side. 6-8-20 7:05am They are pouring the curb in the parking lot on the west side of the building. They are done for the day. They have the islands poured. They used white cure. 6-9-20 8:58am They are pouring more curb on the SW corner of the parking lot. 6-10-20 11:02am All of the curb is poured. 6-18-20 They have section of curb on the west side of the site that is set up ready to pour.
Driveway Inspection Partial 6/19/2020 6/19/2020 06/19/2020
Misc
Informational
06/19/2020
6-18-20 The contractor set forms and compacted the aggregate for the drive approach for the alley on the South West side of the site. They are hoping to pour concrete on 6-19-20. 6-19-20 8:34am They are going to try to pour the drive approach at approximately 10am.
Driveway Inspection Partial 06/22/2020
Misc
Informational
06/19/2020
6-18-20 The contractor set forms and compacted the aggregate for the drive approach for the alley on the South West side of the site. They are hoping to pour concrete on 6-19-20. 6-19-20 8:34am They are going to try to pour the drive approach at approximately 10am.
Misc
Informational
06/22/2020
6-22-20 The contractor setforms and compacted the aggregate in the alley driveway.
Sidewalk Inspection Partial 6/18/2020 06/30/2020
Misc
Informational
06/15/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
06/15/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour. 5-29-20 They have formed up the sidewalk in front of the front door with the trench drain. They are pouring now. 6-1-20 They have the sidewalk formed up going to the front door. They will be pouring at approximately 2:30pm. 6-15-20 1:31pm The sidewalk is poured on the north side of the parking lot and the east side of the building. 6-30-20 9:39am They have poured the sidewalk on the west side of the site. It meets ADA spec.
Site Visit Partial 07/01/2020
Misc
Informational
06/18/2020
7-23-19 Meeting water dept. on site to do a test shutdown.
Misc
Informational
06/18/2020
10-10-19 I met with Darell to give him revised plans.
Misc
Informational
06/18/2020
11-18-19 There was no activity on site at this time.
Misc
Informational
06/18/2020
2-18-20 11:37am I spoke with the Superintendent of the job about keeping the streets clean. We had a compliant call at 11:13am about muddy streets and I arrived on site at 11:35am to find no mud on any of the streets. He appears to be doing a good job.
Misc
Informational
06/18/2020
4-30-20 10:32am I spoke with the superintendent of the site about erosion control. There is no run off on this site at this time. However they are aware that erosion controls will need to be in place if the grade changes to flow out. 5-26-20 There is no activity on the site today due to weather. 5-28-20 There is no activity on site due to weather. It has been raining all day. 5-29-20 We met for a TCO but there sidewalk is not installed along with other issues. 6-18-20 Steve Robbins and I met on site to look at the alley and sidewalk to decide what direction the contractor needs to go. I will be meeting Bob Burns on site later. 6-18-20 9:50am I met Bob Burns and we explained to the contractor what is needed in the alley. 7-1-20 9:28am There is no activity on site at this time.
Grading/Excavation/Fill Inspection Passed 07/09/2020
Misc
Corrective Action Required
05/22/2020
Water - Material Verification Passed 07/09/2020
Water Line - Hydrostatic Test Passed 07/09/2020
Water Line - Valve Passed 07/09/2020
Water Line - Fire Hydrant Passed 07/09/2020
Water Line - Thrust Restraint Passed 07/09/2020
Water Line - Construction Taps Removed Passed 07/09/2020
Sanitary - Material Verification Passed 07/09/2020
Curb - Proof Roll Passed 07/09/2020
Pavement-Proof Roll Passed 07/09/2020
Storm - Material Verification Partial 07/09/2020
Storm - Swales Not Ready 07/09/2020
Water - Material Verification Passed 07/09/2020
Water Line - Construction Inspection Partial 07/09/2020
Sanitary - Material Verification Passed 07/09/2020
Storm - Pipe Passed 07/09/2020
Misc
Informational
04/02/2020
Joe Starlin 07/18/2019 7:24 AM The crew installed storm pipe on the north side of the site and backfilled with type 5 in 8" lifts.
Misc
Informational
04/02/2020
3-20-20
Misc
Informational
04/02/2020
3-20-20
Misc
Informational
04/02/2020
3-26-20 They have 70’ feet of 10” storm pipe installed.
Misc
Informational
04/02/2020
4-2-20 They have all the storm pipe ran on the south end of the site.
Erosion Control Inspection Passed 07/09/2020
Misc
Informational
02/25/2020
10-31-19 9:14am 28 degrees outside. There appears to be no erosion control issues.
Misc
Informational
02/25/2020
2-21-20 11:10am All erosion controls appear to be in place at this time.
Misc
Informational
02/25/2020
2-25-20 Steve Robbins stoped and told them to clean the streets. 9:55am I just spoke with the superintendent about correcting their construction intrance with new rock 50’ in. I informed them that the construction intrance needs to be addressed ASAP or there will be a stop work order.
Misc
Informational
03/23/2020
3-23-20 1:26pm They have tracked mud on Market St. and down second St. I called the Superintendent and informed him that there would be no more inspections until the streets were cleaned. I am now on site and he is running a sweeper.
Driveway Inspection Passed 07/09/2020
Misc
Informational
06/22/2020
6-18-20 The contractor set forms and compacted the aggregate for the drive approach for the alley on the South West side of the site. They are hoping to pour concrete on 6-19-20. 6-19-20 8:34am They are going to try to pour the drive approach at approximately 10am.
Misc
Informational
06/22/2020
6-22-20 The contractor setforms and compacted the aggregate in the alley driveway.
Sidewalk Inspection Passed 07/09/2020
Misc
Informational
06/30/2020
3-30-20 9:54am I spoke with the concrete crew and they are planning on pouring the south side flume on 3-31-20.
Misc
Informational
06/30/2020
4-1-20 The sidewalk is formed up and aggregate is compacted ready for pour. 4-21-20 2:16pm The contractor is setting up the ramps on the west side of the building to ADA spec. 40-27-20 The contractor has all of the base rock installed for the sidewalk on the west side of the building. 5-5-20 10:54am They have the steel installed and will be pouring tomorrow 5-6-20. 5-6-20 9:20am They have poured the ramps on the west side of the building and are working on the Finnish. 5-7-20 9:32am They have poured the pad on the East side of the building for the brick to lay on. They have the forms for the steps set up on the West side of the building. It is ready to pour. 5-29-20 They have formed up the sidewalk in front of the front door with the trench drain. They are pouring now. 6-1-20 They have the sidewalk formed up going to the front door. They will be pouring at approximately 2:30pm. 6-15-20 1:31pm The sidewalk is poured on the north side of the parking lot and the east side of the building. 6-30-20 9:39am They have poured the sidewalk on the west side of the site. It meets ADA spec.
Water - Material Verification Passed 07/09/2020
Water Line - Construction Inspection Passed 07/09/2020
Misc
Informational
07/09/2020
6-17-20 10:24AM The water department has made the tap for the two inch waterline. They have the meter set and the copper line installed. They are getting ready to backfill.
Sidewalk Inspection Partial 08/18/2020
Misc
Informational
08/18/2020
8-18-20 11:39am There are two sidewalk panels that are cracked and need replaced.
Pavement-Curb Construction Passed 08/18/2020
Misc
Informational
06/18/2020
5-18-20 They are pouring the curb for the parking lot on east side of the street. 5-19-20 They are pulling forms and will be pouring more curb later today. They have poured the curb on the west side. 6-8-20 7:05am They are pouring the curb in the parking lot on the west side of the building. They are done for the day. They have the islands poured. They used white cure. 6-9-20 8:58am They are pouring more curb on the SW corner of the parking lot. 6-10-20 11:02am All of the curb is poured. 6-18-20 They have section of curb on the west side of the site that is set up ready to pour. 6-22-20 9:32am They are setting up curb on the West side of the site. They are removing asphalt along the alley to get it ready to pour back.
Sidewalk Inspection Passed 9/9/2020 9/9/2020 09/09/2020
Misc
Informational
08/18/2020
8-18-20 11:39am There are two sidewalk panels that are cracked and need replaced.
Documents & Images
Date Uploaded File Type Document Name
07/16/2019 Receipt Receipt for transaction: 2019-004796
07/17/2019 Letter DE-Permit
07/18/2019 signed permit
07/18/2019 Letter DE-Daily Inspection Summary
07/18/2019 image storm pipe 15”
07/18/2019 image storm pipe 15” sdr
07/18/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
07/23/2019 image fire line
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
03/23/2020 Sanitary service line
03/23/2020 Letter INSPECTION SUMMARY
03/25/2020 Caped manhole north side
03/25/2020 .jpg
03/25/2020 South manhole
03/25/2020 0
03/25/2020 Rock filled north manhole
03/25/2020 Letter INSPECTION SUMMARY
03/26/2020 70 ‘ storm pipe
03/26/2020 Letter INSPECTION SUMMARY
03/27/2020 Letter INSPECTION SUMMARY
03/30/2020 North end of building
03/30/2020 South side building
03/30/2020 Letter INSPECTION SUMMARY
04/01/2020 Invert
04/01/2020 Collar storm
04/01/2020 Sidewalk
04/02/2020 Storm pipe
04/02/2020 Storm pipe0
04/02/2020 Letter INSPECTION SUMMARY
04/07/2020 Sanitary Service tie in
04/07/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/10/2020 Sanitary Service line 0
04/10/2020 Stub
04/10/2020 Letter INSPECTION SUMMARY
04/13/2020 Trench check
04/13/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/20/2020 Sanitary service line 1
04/20/2020 Letter INSPECTION SUMMARY
04/21/2020 Letter INSPECTION SUMMARY
04/27/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
05/06/2020 Sidewalk on the east side
05/06/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
05/27/2020 Reece Nichols trench drain approved 5.27.20
05/28/2020 Letter INSPECTION SUMMARY
05/29/2020 Trench at front door..jpg
05/29/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/03/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/13/2020 The alley.jpg
06/13/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/24/2020 image 6-24-20 surface asphalt .jpg
06/30/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
07/10/2020 Letter DE-Punch List
08/18/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/22/2020 3 year maintenance bond
10/07/2020 Reece Easement - recorded
10/07/2020 Reece Row - recorded
03/20/2023 Letter DE-Certificate of Final Acceptance (Commercial)
03/20/2023 Reece Nichols -On-Site Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home