Permit Application Status

PRSITE20171570


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20171570
Development - Site
Final Acceptance
CSC INVESTMENTS II LLC
DEVELOPMENT COMPLETE
Full site development for commercial
05/17/2017
06/09/2017
08/20/2020
Locations
Contacts
CSC INVESTMENTS II LLC, Address:3350 NE RALPH POWELL RD  
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/17/2017 05/17/2017
Nick Lightner
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $174.00 $174.00 Paid 06/02/2017
91100C9-Water Insp Fee $1,598.70 $1,598.70 Paid 06/02/2017
9110072-Water Test Fee $200.00 $200.00 Paid 06/02/2017
9110068-Storm Sewer Inspection Fee $1,798.95 $1,798.95 Paid 06/02/2017
9110081-Paved Surface Inspection Fee $8,892.83 $8,892.83 Paid 06/02/2017
9110071-Site Grading Fee $2,575.20 $2,575.20 Paid 06/02/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 6/26/2017 06/26/2017
Informational
06/26/2017
Mass grading continues at site. PSI on site for moisture/density/compaction testing.
Grading/Excavation/Fill Inspection Partial 7/26/2017 07/26/2017
Carried Forward
07/26/2017
July 26, 2017 - pad site has been built. No activity today, site is deserted.
Erosion Control Inspection Partial 7/26/2017 07/26/2017
Informational
07/26/2017
July 26, 2017 Silt fence has been installed on site.
Site Visit Partial 8/2/2017 08/03/2017
Informational
08/03/2017
Workers (5) working on pad site. No utilities have been installed.
Site Visit Partial 8/15/2017 at 11:12 AM 08/15/2017
Site Visit Complete 8/9/2017 08/15/2017
Erosion Control Inspection Partial 8/15/2017 08/15/2017
ESC Devices Installed Complete 8/15/2017 08/15/2017
Site Visit Partial 8/18/2017 at 9:25 AM 08/18/2017
Site Visit Partial 8/21/2017 at 1:46 PM 08/21/2017
Erosion Control Inspection Partial 8/22/2017 at 2:16 PM 08/22/2017
Site Visit Partial 8/29/2017 08/29/2017
Informational
08/29/2017
No utilities or infrastructure that I would inspect being installed.
Erosion Control Inspection Partial 9/7/2017 at 1:00 PM 09/07/2017
Site Visit Partial 9/7/2017 at 1:15 PM 09/07/2017
Sanitary Sewer Construction Inspection Passed 9/11/2017 at 10:56 AM 09/11/2017
Informational
09/11/2017
Sanitary Sewer was installed.
Storm - Pipe Partial 09/11/2017
Storm - Pipe Partial 9/11/2017 at 2:00 PM 09/11/2017
Corrective Action Required
09/11/2017
Backfill will have to be tested - compaction, moisture, density.
Storm - Pipe Partial 9/12/2017 at 10:30 AM 09/12/2017
PW-Misc
Informational
09/12/2017
The contractors tied in to the existing curb inlet 24-4 and proceeded to install storm box numbers 1-6 , they were also installing the pipe and rock.
Storm - Pipe Partial 9/13/2017 at 9:00 AM 09/13/2017
PW-Misc
Informational
09/12/2017
The contractors tied in to the existing curb inlet 24-4 and proceeded to install storm box numbers 1-6 , they were also installing the pipe and rock.
PW-Misc
Informational
09/13/2017
The contractors backfilled storm structure 1-6 and are working on 6-10 today. 'They have not put the collars on yet, they are planning on doing that tomorrow.
Storm - Pipe Partial 9/14/2017 at 2:00 PM 09/14/2017
PW-Misc
Informational
09/13/2017
The contractors tied in to the existing curb inlet 24-4 and proceeded to install storm box numbers 1-6 , they were also installing the pipe and rock.
PW-Misc
Informational
09/13/2017
The contractors backfilled storm structure 1-6 and are working on 6-10 today. 'They have not put the collars on yet, they are planning on doing that tomorrow.
PW-Misc
Informational
09/14/2017
The storm boxes 6-9 was installed today, the roof drains are not tied in, they are waiting on the tees. This afternoon they also poured the collars and some inverts up to storm #9. They also installed 30 ft. of water line fire and domestic.
Storm - Pipe Partial 9/15/2017 at 10:59 AM 09/15/2017
PW-Misc
Informational
09/14/2017
The contractors tied in to the existing curb inlet 24-4 and proceeded to install storm box numbers 1-6 , they were also installing the pipe and rock.
PW-Misc
Informational
09/14/2017
The contractors backfilled storm structure 1-6 and are working on 6-10 today. 'They have not put the collars on yet, they are planning on doing that tomorrow.
PW-Misc
Informational
09/14/2017
The storm boxes 6-9 was installed today, the roof drains are not tied in, they are waiting on the tees. This afternoon they also poured the collars and some inverts up to storm #9. They also installed 30 ft. of water line fire and domestic.
Site Visit Partial 9/18/2017 at 11:16 AM 09/18/2017
Erosion Control Inspection Partial 9/14/2017 at 11:18 AM 09/19/2017
Site Visit Partial 9/19/2017 at 10:50 AM 09/19/2017
Fire Line Construction Inspection Partial 9/21/2017 at 7:15 AM 09/21/2017
Informational
09/22/2017
Contractor is working on water infrastructure. They took the cap off of a water main branch that services the site, after shutting off a valve on the branch. They are going to call W.U. for a tap on the branch for the domestic supply line (we discussed this at length). They are setting a vault for the back flow preventor assembly. Barton Reese 09/21/2017 10:56 AM
Storm - Pipe Passed 9/18/2017 09/22/2017
PW-Misc
Informational
09/15/2017
The contractors tied in to the existing curb inlet 24-4 and proceeded to install storm box numbers 1-6 , they were also installing the pipe and rock.
PW-Misc
Informational
09/15/2017
The contractors backfilled storm structure 1-6 and are working on 6-10 today. 'They have not put the collars on yet, they are planning on doing that tomorrow.
PW-Misc
Informational
09/15/2017
The storm boxes 6-9 was installed today, the roof drains are not tied in, they are waiting on the tees. This afternoon they also poured the collars and some inverts up to storm #9. They also installed 30 ft. of water line fire and domestic.
Fire Line Construction Inspection Partial 9/22/2017 at 7:17 AM 09/22/2017
Fire Line Construction Inspection Partial 9/20/2017 at 8:15 AM 09/22/2017
Fire Line Construction Inspection Partial 9/22/2017 at 9:55 AM 09/22/2017
Site Visit Partial 9/25/2017 at 11:00 AM 09/25/2017
Site Visit Partial 9/26/2017 at 2:00 PM 09/26/2017
Site Visit Partial 9/27/2017 at 8:38 AM 09/27/2017
Informational
09/27/2017
Matt Munger 09/27/2017 3:45 PM Workers were present and were grading the area on the south side.
Site Visit Partial 9/27/2017 at 1:56 PM 09/27/2017
Informational
09/27/2017
Matt Munger 09/27/2017 3:49 PM No workers were present.
Water Line - Hydrostatic Test Partial 9/29/2017 at 10:00 AM 09/29/2017
Informational
09/29/2017
Matt Munger 09/29/2017 3:26 PM Keith had everything setup and ready to perform the test but was having issues with the compressor. Keith will need to reschedule for a later time. Bart observed that there was wood blocks under the gate valves in the vault and informed Keith that wood was not allowed and there needed to be block only. Bart also mentioned to Keith that the grate area in the vault needed to fixed.
Erosion Control Inspection Partial 9/28/2017 at 2:58 PM 09/29/2017
Informational
09/29/2017
Matt Munger 09/29/2017 4:00 PM On 9/28/17 I observed several sections of the silt fence that had fallen down. The north side in particular appeared to be missing sections.
Site Visit Partial 10/3/2017 at 10:10 AM 10/03/2017
Informational
10/03/2017
Matt Munger 10/03/2017 1:20 PM Drove by and workers were not present.
Site Visit Partial 10/4/2017 at 11:06 AM 10/04/2017
Informational
10/04/2017
Matt Munger 10/04/2017 11:37 AM No workers were present.
Site Visit Partial 10/5/2017 at 10:17 AM 10/05/2017
Informational
10/05/2017
Matt Munger 10/05/2017 2:43 PM No workers were present.
Erosion Control Inspection Failed 10/6/2017 at 11:20 AM 10/06/2017
PW-Erosion and Sediment Control
Corrective Action Required
10/06/2017
Matt Munger 10/06/2017 11:44 AM Your project is in violation of the Erosion and Sediment control policy. Silt fence is not intact according to the plans around the site. There is no protection around the storm inlets. ESC devices need to be maintained throughout the duration of the project.
Erosion Control Inspection Failed 10/6/2017 at 1:40 PM 10/06/2017
PW-Erosion and Sediment Control
Corrective Action Required
10/06/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
Site Visit Partial 10/10/2017 at 10:01 AM 10/10/2017
Informational
10/10/2017
Matt Munger 10/10/2017 10:09 AM No workers were present due to the weather.
Site Visit Partial 10/11/2017 at 9:51 AM 10/11/2017
Informational
10/11/2017
No workers were present. Silt fences need to be repaired and storm inlet devices need to be put in place. Notified Kevin in regards to the erosion control issues on 10/10/17, he stated they would work on fixing those issues this week. Matt Munger 10/11/2017 9:57 AM
Site Visit Partial 10/12/2017 at 2:41 PM 10/12/2017
Informational
10/12/2017
Matt Munger 10/12/2017 2:46 PM No workers present.
Site Visit Partial 10/13/2017 at 10:35 AM 10/13/2017
Informational
10/13/2017
No workers were present, silt fences and storm inlet devices need to be fixed/put in. I spoke with Kevin at LBP about this site and he stated they were waiting on the materials and would get it taken care of. Matt Munger 10/13/2017 3:06 PM
Storm - Pipe Partial 10/16/2017 at 10:26 AM 10/16/2017
Informational
10/16/2017
Observed Kevin and his crew connect the storm pipe and put in the filtration system for Str.2 sta 0+63.55 line 1 Junction Box.
Storm Sewer Construction Inspection Partial 10/16/2017 at 1:01 PM 10/16/2017
Informational
10/16/2017
Picked up the concrete ticket for Str 2 sta 0+63.55 line with filtration system. I observed Kevin and his crew setting the lid on top of the junction box and they used the proper sealant between the box and lid to make a proper seal.
Erosion Control Inspection Partial 10/17/2017 at 2:01 PM 10/17/2017
PW-Erosion and Sediment Control
Corrective Action Required
10/06/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
10/17/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
Site Visit Partial 10/19/2017 at 3:00 PM 10/19/2017
Erosion Control Inspection Partial 10/26/2017 at 2:06 PM 10/26/2017
PW-Erosion and Sediment Control
Corrective Action Required
10/17/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
10/17/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
10/26/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
Site Visit Partial 10/30/2017 at 8:41 AM 10/30/2017
PW-Misc
Informational
10/30/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
Site Visit Partial 10/31/2017 at 10:52 AM 10/31/2017
PW-Misc
Informational
10/30/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
PW-Misc
Informational
10/31/2017
Matt Munger 10/31/2017 3:58 PM Came by in the morning and Walters Excavating was working on the subgrade for the pavement. Pressure test on fire line still needs to be done then we can start the chlorination process, etc. Spoke with Kevin in last week about the pressure test.
Site Visit Partial 11/1/2017 at 8:41 AM 11/01/2017
PW-Misc
Informational
10/31/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
PW-Misc
Informational
10/31/2017
Matt Munger 10/31/2017 3:58 PM Came by in the morning and Walters Excavating was working on the sub grade for the pavement. Pressure test on fire line still needs to be done then we can start the chlorination process, etc. Spoke with Kevin in last week about the pressure test.
PW-Misc
Informational
11/01/2017
Matt Munger 11/01/2017 11:32 AM Walter Excavating is working on subgrade for areas that are to be paved. Spoke with Scott Fischer about when they would be ready to do a proof roll and he said it would be a bit, I told Scott to call me when they are ready.
Fire Line - Hydrostatic Test Passed 11/2/2017 at 2:36 PM 11/02/2017
PW-Misc
Informational
11/02/2017
Matt Munger 11/02/2017 3:47 PM Kevin called me at 1:55pm to come out for the pressure test. Kevin started the pressure test at 2pm. When I arrived the gauge was at 200 psi. The pressure did not drop below 200psi for 2 hours. Reminded Kevin that the they need to replace the wooden blocks under the valves with concrete blocks and get the right grate for the BFP vault.
Site Visit Partial 11/3/2017 at 10:01 AM 11/03/2017
PW-Misc
Informational
11/01/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
PW-Misc
Informational
11/01/2017
Matt Munger 10/31/2017 3:58 PM Came by in the morning and Walters Excavating was working on the sub grade for the pavement. Pressure test on fire line still needs to be done then we can start the chlorination process, etc. Spoke with Kevin in last week about the pressure test.
PW-Misc
Informational
11/01/2017
Matt Munger 11/01/2017 11:32 AM Walter Excavating is working on subgrade for areas that are to be paved. Spoke with Scott Fischer about when they would be ready to do a proof roll and he said it would be a bit, I told Scott to call me when they are ready.
PW-Misc
Informational
11/03/2017
Matt Munger 11/03/2017 10:45 AM Workers still spreading base material over geogrid. Spoke with Butch Walter and he said they are waiting on the curb stakes to be put in but is hoping to possibly proof roll on Tuesday 11/7/17.
Fire Line - Flush Partial 11/6/2017 at 8:26 AM 11/06/2017
PW-Misc
Informational
11/06/2017
Matt Munger 11/06/2017 8:38 AM No workers present to start the chlorination process, contacted Keith from Holthouse and he wanted to reschedule for 11/13/17.
Curb - Proof Roll Passed 11/6/2017 at 2:01 PM 11/06/2017
PW-Misc
Informational
11/06/2017
Matt Munger 11/06/2017 3:36 PM I observed the Contractor roll test the subgrade where curbs are to be put in. During the test I did not observe any rutting, pumping, deformation.
Commercial Curb Inspection Partial 11/8/2017 at 1:56 PM 11/08/2017
Informational
11/08/2017
Matt Munger 11/08/2017 2:47 PM I observed workers pouring the curbs with a machine. I verified that they are using KCMMB 4K mix and got the ticket. I asked that they use a blanket on the curbs due to the temperatures, the worker stated that the Contractor would take care of that. Also told him to make sure they have 3" deep contraction joints approximatley at 10ft intervals. The finish that I could see was smooth as well.
Commercial Curb Inspection Partial 11/9/2017 at 10:06 AM 11/09/2017
Informational
11/09/2017
Matt Munger 11/09/2017 10:23 AM Observed 3"deep contraction joints put in about every 10ft, smooth dowels at the ends of radius points. Informed the contractor to use the white cure and to make sure that they cover the curbs to protect them from the lower temps. He stated they will have the blankets out today.
Commercial Curb Inspection Partial 11/10/2017 at 9:05 AM 11/10/2017
Informational
11/10/2017
Matt Munger 11/10/2017 11:24 AM When I arrived on site I observed all of the curbs covered to protect them due to the cold temps. No other work was being done at that time.
Commercial Curb Inspection Partial 11/13/2017 at 2:48 PM 11/13/2017
Informational
11/13/2017
Matt Munger 11/13/2017 3:16 PM Curbs were still covered, workers were pouring small sections of curb that were not put in with the machine. Informed the Contractor to grout the areas that honeycomb was visible on the front and back of the curbs.
Fire Line - Flush Passed 11/13/2017 11/13/2017
PW-Misc
Informational
11/06/2017
Matt Munger 11/06/2017 8:38 AM No workers present to start the chlorination process, contacted Keith from Holthouse and he wanted to reschedule for 11/13/17.
PW-Misc
Informational
11/13/2017
Matt Munger 11/13/2017 4:18 PM Steve Robbins covered me while I was at a doctor appointment and the Contractor flushed the line and chlorinated.
Site Visit Partial 11/14/2017 11/14/2017
PW-Misc
Informational
11/03/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
PW-Misc
Informational
11/03/2017
Matt Munger 10/31/2017 3:58 PM Came by in the morning and Walters Excavating was working on the sub grade for the pavement. Pressure test on fire line still needs to be done then we can start the chlorination process, etc. Spoke with Kevin in last week about the pressure test.
PW-Misc
Informational
11/03/2017
Matt Munger 11/01/2017 11:32 AM Walter Excavating is working on subgrade for areas that are to be paved. Spoke with Scott Fischer about when they would be ready to do a proof roll and he said it would be a bit, I told Scott to call me when they are ready.
PW-Misc
Informational
11/03/2017
Matt Munger 11/03/2017 10:45 AM Workers still spreading base material over geogrid. Spoke with Butch Walter and he said they are waiting on the curb stakes to be put in but is hoping to possibly proof roll on Tuesday 11/7/17.
PW-Misc
Informational
11/14/2017
Matt Munger 11/14/2017 10:01 AM Keith contacted me Tuesday morning and stated his truck broke down and that he would not be able to make it to de-chlorinate the line. I Informed Keith that Blue Valley Labs would have to come in on saturday if we take samples Thursday and Friday and that Blue Valley will charge them $100.00 for having to come in on a Saturday to pull samples. I contacted Blue Valley Labs to see if they could have an employee come in Saturday to pull samples. The lady on phone took my info down and told me they would have the lady that would possibly be in call me Tuesday afternoon.
Site Visit Partial 11/14/2017 at 11:05 AM 11/14/2017
PW-Misc
Informational
11/14/2017
Matt Munger 11/14/2017 11:31 AM No workers present, curbs are still covered.
Erosion Control Inspection Failed 11/14/2017 at 11:32 AM 11/14/2017
PW-Erosion and Sediment Control
Corrective Action Required
10/26/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
10/26/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
10/26/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
11/14/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
Site Visit Partial 11/15/2017 at 9:31 AM 11/15/2017
PW-Misc
Informational
11/14/2017
Matt Munger 10/30/2017 8:59 AM No workers present, Scott Fischer stopped by and I spoke with him in regards to the paving. He stated they want to start later this week to try and start on putting down geogrid.
PW-Misc
Informational
11/14/2017
Matt Munger 10/31/2017 3:58 PM Came by in the morning and Walters Excavating was working on the sub grade for the pavement. Pressure test on fire line still needs to be done then we can start the chlorination process, etc. Spoke with Kevin in last week about the pressure test.
PW-Misc
Informational
11/14/2017
Matt Munger 11/01/2017 11:32 AM Walter Excavating is working on subgrade for areas that are to be paved. Spoke with Scott Fischer about when they would be ready to do a proof roll and he said it would be a bit, I told Scott to call me when they are ready.
PW-Misc
Informational
11/14/2017
Matt Munger 11/03/2017 10:45 AM Workers still spreading base material over geogrid. Spoke with Butch Walter and he said they are waiting on the curb stakes to be put in but is hoping to possibly proof roll on Tuesday 11/7/17.
PW-Misc
Informational
11/14/2017
Matt Munger 11/14/2017 10:01 AM Keith contacted me Tuesday morning and stated his truck broke down and that he would not be able to make it to de-chlorinate the line. I Informed Keith that Blue Valley Labs would have to come in on saturday if we take samples Thursday and Friday and that Blue Valley will charge them $100.00 for having to come in on a Saturday to pull samples. I contacted Blue Valley Labs to see if they could have an employee come in Saturday to pull samples. The lady on phone took my info down and told me they would have the lady that would possibly be in call me Tuesday afternoon.
PW-Misc
Informational
11/15/2017
Matt Munger 11/15/2017 10:06 AM Checked the chlorine level with the test strips and it turned black right away. De-chlorinated until the test strips didn't change color.
Erosion Control Inspection Partial 11/16/2017 at 10:26 AM 11/16/2017
PW-Erosion and Sediment Control
Corrective Action Required
11/14/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
11/14/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
11/14/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
11/14/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
11/16/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
Driveway Inspection Partial 11/17/2017 at 8:16 AM 11/17/2017
PW-Misc
Informational
11/17/2017
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
Erosion Control Inspection Partial 11/17/2017 at 9:15 AM 11/17/2017
PW-Erosion and Sediment Control
Corrective Action Required
11/16/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
11/16/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
11/16/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
11/16/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
11/16/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
11/17/2017
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
Driveway Inspection Partial 11/20/2017 at 10:36 AM 11/20/2017
PW-Misc
Informational
11/17/2017
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
PW-Misc
Informational
11/20/2017
Matt Munger 11/20/2017 11:44 AM Workers were getting the driveway approaches ready to pour concrete. Some sections of the curbs that were hand poured need to have grout in place where honeycomb is present. I called Scott and spoke with him about the curb gutters in the driveway approaches and spoke with him about making sure the curbs that have honeycomb get grouted.
Proof roll parking lot Passed 11/21/2017 at 1:35 PM 11/21/2017
Informational
11/02/2017
Matt Munger 11/02/2017 3:40 PM Workers had geogrid down and were putting down the base gravel. Might be ready Friday for a proof roll.
Proof roll parking lot Passed 11/21/2017 11/22/2017
Erosion Control Inspection Partial 11/22/2017 at 9:41 AM 11/22/2017
PW-Erosion and Sediment Control
Corrective Action Required
11/17/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
11/17/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
11/17/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
11/17/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
11/17/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
11/17/2017
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
11/22/2017
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
Fire Line - Flush Passed 11/27/2017 at 8:16 AM 11/27/2017
PW-Misc
Informational
11/27/2017
Matt Munger 11/27/2017 10:10 AM Flushed the line, will let it sit for 24 hours and take samples on Tuesday the 28th. Line had been chlorinated and de-chlorinated prior to this flush but since the contractor had issues with his vehicle we could not take samples sooner.
Driveway Inspection Partial 11/27/2017 at 9:30 AM 11/27/2017
PW-Misc
Informational
11/20/2017
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
PW-Misc
Informational
11/27/2017
Matt Munger 11/27/2017 10:13 AM The SE & SW driveway approaches maintained less than 2% throughout the sidewalk within the driveway approach. The NW driveway approach was not ready to be inspected at this time.
PW-Misc
Informational
11/20/2017
Matt Munger 11/20/2017 11:44 AM Workers were getting the driveway approaches ready to pour concrete. Some sections of the curbs that were hand poured need to have grout in place where honeycomb is present. I called Scott and spoke with him about the curb gutters in the driveway approaches and spoke with him about making sure the curbs that have honeycomb get grouted.
Commercial Curb Inspection Failed 11/27/2017 at 9:45 AM 11/27/2017
Corrective Action Required
11/27/2017
Matt Munger 11/27/2017 10:16 AM Non shrink grout will need to be applied in areas along the curbs that honeycomb is present. I marked with pink paint the curbs that will need to have non shrink grout applied. Areas around curb inlets that obviously were hand formed will all need to have non shrink grout applied before I can pass the curbs.
Water Line - Coliform Test 1 Partial 11/28/2017 at 10:10 AM 11/28/2017
PW-Misc
Informational
11/28/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
Water Line - Coliform Test 2 Partial 11/29/2017 at 11:00 AM 11/29/2017
PW-Misc
Informational
11/29/2017
Took water samples from the vault and from the end of the line in the building down to the lab.Nick Lightner 11/29/2017 1:35 PM
Erosion Control Inspection Failed 12/4/2017 at 10:00 AM 12/04/2017
PW-Erosion and Sediment Control
Corrective Action Required
11/22/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
11/22/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
11/22/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
11/22/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
11/22/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
11/22/2017
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
11/22/2017
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
12/04/2017
There are problems with the erosion control devices on your site. *ESC fence needs to be put into place on the N side of the building and around to the W side. Please install to the engineering plans. I will check back in a few days to see if devices have been installed.Nick Lightner 12/04/2017 1:28 PM
Site Visit Partial 12/4/2017 at 10:00 AM 12/04/2017
PW-Misc
Informational
12/04/2017
Stopped by and check the entrances on the S side and the W side to the parking lot the sidewalk is carrying under 2% and also talked with a few of the guys who was laying the base down.Nick Lightner 12/04/2017 1:31 PM
Site Visit Partial 12/5/2017 at 2:30 PM 12/05/2017
PW-Misc
Informational
11/14/2017
Matt Munger 11/14/2017 11:31 AM No workers present, curbs are still covered.
PW-Misc
Informational
12/05/2017
Talked to Scott this morning about the erosion control that needed to be installed and then talked about the asphalt and i told him it needs to be 50 and higher as temp. No work was going on other then stuff with the building.Nick Lightner 12/05/2017 3:21 PM
Water Line - Coliform Test 1 Failed 12/05/2017
PW-Misc
Informational
11/28/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
Site Visit Partial 12/6/2017 at 2:30 PM 12/06/2017
PW-Misc
Informational
12/06/2017
No work was going on other then the building. Talked to Scott about a few things on this project and the other projects hes part of. Nick Lightner 12/06/2017 3:07 PM
Erosion Control Inspection Partial 12/8/2017 at 9:10 AM 12/08/2017
PW-Erosion and Sediment Control
Corrective Action Required
12/04/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
12/04/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
12/04/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
12/04/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
12/04/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
12/04/2017
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
12/04/2017
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
Site Visit Partial 12/12/2017 at 2:30 PM 12/12/2017
PW-Misc
Informational
12/12/2017
ESC is partially put up. Maybe 50ft was put up on the N side of the property. Nick Lightner 12/12/2017 2:37 PM
Site Visit Partial 12/13/2017 at 1:20 PM 12/13/2017
Water Line - Coliform Test 1 Partial 12/18/2017 at 10:15 AM 12/18/2017
PW-Misc
Informational
12/05/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
PW-Misc
Corrective Action Required
12/05/2017
Water test FAILED at the Vault the end of line passed though. Told Chad to let me know when they wanted to chlorinate the line again and re-test.
PW-Misc
Informational
12/18/2017
The first round of samples failed on this project i was told. We flushed the line and are letting it sit for 24 hr. and will a take a sample in the moring.Steve Robbins 12/18/2017 3:54 PM
Water Line - Coliform Test 1 Partial 12/19/2017 at 10:00 AM 12/19/2017
PW-Misc
Informational
12/18/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
PW-Misc
Corrective Action Required
12/18/2017
Water test FAILED at the Vault the end of line passed though. Told Chad to let me know when they wanted to chlorinate the line again and re-test.
PW-Misc
Informational
12/18/2017
The first round of samples failed on this project i was told. We flushed the line and are letting it sit for 24 hr. and will a take a sample in the moring.Steve Robbins 12/18/2017 3:54 PM
PW-Misc
Informational
12/19/2017
I took samples from the backflow preventer. Today is the first set.Steve Robbins 12/19/2017 12:58 PM
Water Line - Coliform Test 1 Partial 12/20/2017 at 9:30 AM 12/20/2017
PW-Misc
Informational
12/19/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
PW-Misc
Corrective Action Required
12/19/2017
Water test FAILED at the Vault the end of line passed though. Told Chad to let me know when they wanted to chlorinate the line again and re-test.
PW-Misc
Informational
12/19/2017
The first round of samples failed on this project i was told. We flushed the line and are letting it sit for 24 hr. and will a take a sample in the moring.Steve Robbins 12/18/2017 3:54 PM
PW-Misc
Informational
12/19/2017
I took samples from the backflow preventer. Today is the first set.Steve Robbins 12/19/2017 12:58 PM
Informational
12/20/2017
The samples for the first day have passed.I took the second day to the lab this morning.Steve Robbins 12/20/2017 4:13 PM
Water Line - Coliform Test 1 Passed 12/22/2017 at 11:00 AM 12/22/2017
PW-Misc
Informational
12/20/2017
Matt Munger 11/28/2017 12:01 PM Took first set of samples from BFP vault and end of line.
PW-Misc
Corrective Action Required
12/20/2017
Water test FAILED at the Vault the end of line passed though. Told Chad to let me know when they wanted to chlorinate the line again and re-test.
PW-Misc
Informational
12/20/2017
The first round of samples failed on this project i was told. We flushed the line and are letting it sit for 24 hr. and will a take a sample in the moring.Steve Robbins 12/18/2017 3:54 PM
PW-Misc
Informational
12/22/2017
The samples for the first day and the second day has passed. I took the samples from the backflow preventer.Steve Robbins 12/22/2017 11:38 AM
Site Visit Partial 12/29/2017 at 10:20 AM 12/29/2017
PW-Misc
Informational
12/29/2017
Matt Munger 12/29/2017 10:20 AM Checked on the site for Steve while he was out for the day. Spoke with the workers that were setting up the forms for the concrete area on the NW side. I informed to make sure they don't pour concrete today due to the temperature being too cold. They stated they may try and pour next week. I told them to get with Steve before they are going to pour.
Site Visit Failed 1/5/2018 at 11:30 AM 01/05/2018
PW-Misc
Informational
12/29/2017
Matt Munger 12/29/2017 10:20 AM Checked on the site for Steve while he was out for the day. Spoke with the workers that were setting up the forms for the concrete area on the NW side. I informed to make sure they don't pour concrete today due to the temperature being too cold. They stated they may try and pour next week. I told them to get with Steve before they are going to pour.
PW-Misc
Informational
01/05/2018
I talked with the contractors earlier in the week about the temperature being too cold to pour concrete, they told me they would not pour. The contractors have been forming and putting in re-bar for the ramp leading into the building. I drove by this morning and they were brooming the ramp they had poured earlier this morning, they told me the boss said to pour it anyway. The temperature was 25 degrees when I drove by and the temperature throug this week has been in the teens and single digits. Steve Robbins 01/05/2018 1:57 PM
Site Visit Partial 1/8/2018 at 9:00 AM 01/08/2018
PW-Misc
Informational
01/05/2018
Matt Munger 12/29/2017 10:20 AM Checked on the site for Steve while he was out for the day. Spoke with the workers that were setting up the forms for the concrete area on the NW side. I informed to make sure they don't pour concrete today due to the temperature being too cold. They stated they may try and pour next week. I told them to get with Steve before they are going to pour.
PW-Misc
Informational
01/05/2018
I talked with the contractors earlier in the week about the temperature being too cold to pour concrete, they told me they would not pour. The contractors have been forming and putting in re-bar for the ramp leading into the building. I drove by this morning and they were brooming the ramp they had poured earlier this morning, they told me the boss said to pour it anyway. The temperature was 25 degrees when I drove by and the temperature throug this week has been in the teens and single digits. Steve Robbins 01/05/2018 1:57 PM
PW-Misc
Corrective Action Required
01/08/2018
The contractors poured more concrete on saturday when the temperature was is the 20's. I got here at 9:00 this morning and they have 3 concrete trucks and have been pouring, the temperature was 30 degrees when I got here things seem to be frozen .Steve Robbins 01/08/2018 9:28 AM
Street - Surface Course Partial 1/9/2018 at 9:30 AM 01/09/2018
PW-Misc
Informational
01/09/2018
The contractors are planning on installing the surface when the weather breaks and the asphalt plants open. The base surfaced has already been installed before I took over this project.Steve Robbins 01/09/2018 11:43 AM
Driveway Inspection Partial 1/9/2018 at 1:15 PM 01/09/2018
PW-Misc
Informational
11/27/2017
Matt Munger 11/27/2017 10:13 AM The SE & SW driveway approaches maintained less than 2% throughout the sidewalk within the driveway approach. The NW driveway approach was not ready to be inspected at this time.
PW-Misc
Informational
11/27/2017
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
PW-Misc
Informational
11/27/2017
Matt Munger 11/20/2017 11:44 AM Workers were getting the driveway approaches ready to pour concrete. Some sections of the curbs that were hand poured need to have grout in place where honeycomb is present. I called Scott and spoke with him about the curb gutters in the driveway approaches and spoke with him about making sure the curbs that have honeycomb get grouted.
PW-Misc
Informational
01/09/2018
The approach on the west side of the building has been formed , rock has been installed and compacted. I let them know to cover the rock tonight with blankets and they can pour in the morning and they have to keep it covered because the temperature will be going down on thursday.Steve Robbins 01/09/2018 3:59 PM
Driveway Inspection Partial 1/10/2018 at 2:00 PM 01/10/2018
PW-Misc
Informational
01/09/2018
Matt Munger 11/27/2017 10:13 AM The SE & SW driveway approaches maintained less than 2% throughout the sidewalk within the driveway approach. The NW driveway approach was not ready to be inspected at this time.
PW-Misc
Informational
01/09/2018
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
PW-Misc
Informational
01/09/2018
Matt Munger 11/20/2017 11:44 AM Workers were getting the driveway approaches ready to pour concrete. Some sections of the curbs that were hand poured need to have grout in place where honeycomb is present. I called Scott and spoke with him about the curb gutters in the driveway approaches and spoke with him about making sure the curbs that have honeycomb get grouted.
PW-Misc
Informational
01/09/2018
The approach on the west side of the building has been formed , rock has been installed and compacted. I let them know to cover the rock tonight with blankets and they can pour in the morning and they have to keep it covered because the temperature will be going down on thursday.Steve Robbins 01/09/2018 3:59 PM
Informational
01/10/2018
The approach has been poured with kcmmb mix. I talked with the contractor and they are going to put blankets on the concrete once it sets up. I told them they need to leave the blankets on because the weather is going to changing tomorrow.Steve Robbins 01/10/2018 3:38 PM
Driveway Inspection Passed 1/17/2018 at 10:30 AM 01/17/2018
PW-Misc
Informational
01/10/2018
Matt Munger 11/27/2017 10:13 AM The SE & SW driveway approaches maintained less than 2% throughout the sidewalk within the driveway approach. The NW driveway approach was not ready to be inspected at this time.
PW-Misc
Informational
01/10/2018
Matt Munger 11/17/2017 9:11 AM Checked the SE and SW driveway approaches for compacted gravel and ran a string line to see if there was space for 8" of concrete. I contacted Scott Fischer and told him the SW driveway approach needs to have some work done in the middle to allow 8" of concrete throughout the driveway approach. I also informed Scott that there is plans for sidewalks to go through the driveway approaches and that they need to carry a 1.5% cross slope throughout driveway approach inside of the 5ft wide walking space throughout the driveway approach. The NW driveway approach was not ready at this time, I told Scott to let me know when they are going to be ready to pour that approach.
PW-Misc
Informational
01/10/2018
Matt Munger 11/20/2017 11:44 AM Workers were getting the driveway approaches ready to pour concrete. Some sections of the curbs that were hand poured need to have grout in place where honeycomb is present. I called Scott and spoke with him about the curb gutters in the driveway approaches and spoke with him about making sure the curbs that have honeycomb get grouted.
PW-Misc
Informational
01/17/2018
The driveway approach has been poured and has had the blanket on it since 1/10/18. The weather will be warmer tomorrow and they can remove the blankets.
Site Visit Partial 1/22/2018 at 11:40 AM 01/22/2018
PW-Misc
Informational
01/22/2018
Jeremy Young 01/22/2018 11:40 AM No work being done outside today because of the weather.
Site Visit Partial 1/23/2018 at 11:00 AM 01/23/2018
PW-Misc
Informational
01/08/2018
Matt Munger 12/29/2017 10:20 AM Checked on the site for Steve while he was out for the day. Spoke with the workers that were setting up the forms for the concrete area on the NW side. I informed to make sure they don't pour concrete today due to the temperature being too cold. They stated they may try and pour next week. I told them to get with Steve before they are going to pour.
PW-Misc
Informational
01/08/2018
I talked with the contractors earlier in the week about the temperature being too cold to pour concrete, they told me they would not pour. The contractors have been forming and putting in re-bar for the ramp leading into the building. I drove by this morning and they were brooming the ramp they had poured earlier this morning, they told me the boss said to pour it anyway. The temperature was 25 degrees when I drove by and the temperature throug this week has been in the teens and single digits. Steve Robbins 01/05/2018 1:57 PM
PW-Misc
Corrective Action Required
01/08/2018
The contractors poured more concrete on saturday when the temperature was is the 20's. I got here at 9:00 this morning and they have 3 concrete trucks and have been pouring, the temperature was 30 degrees when I got here. The ground seems to be frozen. I just talked with Scott Fischer about the concrete situation and he said he will make the concrete crew aware of our concern. I let him know what they are doing does not meet our standards for concrete. I also let him know that I have brought this to the attention of my boss and I will be getting back with him.Steve Robbins 01/08/2018 9:48 AM
PW-Misc
Informational
01/23/2018
No work going on outside today.Steve Robbins 01/23/2018 11:24 AM
Site Visit Partial 1/24/2018 at 11:00 AM 01/24/2018
PW-Misc
Informational
01/24/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
Site Visit Partial 1/25/2018 at 1:00 PM 01/25/2018
PW-Misc
Informational
01/24/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
PW-Misc
Informational
01/25/2018
No work going on here today.Steve Robbins 01/25/2018 3:55 PM
Site Visit Partial 1/26/2018 at 1:30 PM 01/26/2018
PW-Misc
Informational
01/25/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
PW-Misc
Informational
01/25/2018
No work going on here today.Steve Robbins 01/25/2018 3:55 PM
PW-Misc
Informational
01/26/2018
No work going on outside today.Steve Robbins 01/26/2018 1:47 PM
Site Visit Partial 1/29/2018 at 10:00 AM 01/29/2018
PW-Misc
Informational
01/26/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
PW-Misc
Informational
01/26/2018
No work going on here today.Steve Robbins 01/25/2018 3:55 PM
PW-Misc
Informational
01/26/2018
No work going on outside today.Steve Robbins 01/26/2018 1:47 PM
PW-Misc
Informational
01/29/2018
I talked with the contractor and they are working on getting the parking lot graded so they can put down 4" of subgrade and 6" of concrete. They were planning on putting in asphalt but are now leaning toward concrete.Steve Robbins 01/29/2018 10:59 AM
Site Visit Partial 4/2/2018 at 9:35 AM 02/01/2018
PW-Misc
Informational
01/29/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
PW-Misc
Informational
01/29/2018
No work going on here today.Steve Robbins 01/25/2018 3:55 PM
PW-Misc
Informational
01/29/2018
No work going on outside today.Steve Robbins 01/26/2018 1:47 PM
PW-Misc
Informational
01/29/2018
Nothing going on outside today. They still have asphalt in the parking lot to do.Steve Robbins 01/29/2018 11:03 AM
PW-Misc
Informational
02/01/2018
Nothing going on outside today.Steve Robbins 02/01/2018 2:31 PM
PW-Misc
Informational
04/02/2018
Jeremy Young 04/02/2018 2:11 PM No work today due to weather.
Site Visit Complete 2/5/2018 02/05/2018
PW-Misc
Informational
02/01/2018
I drove by and the contractors have moved some rocks and dirt, hopefully preparing to put in the erosion control.Steve Robbins 01/24/2018 3:39 PM
PW-Misc
Informational
02/01/2018
No work going on here today.Steve Robbins 01/25/2018 3:55 PM
PW-Misc
Informational
02/01/2018
No work going on outside today.Steve Robbins 01/26/2018 1:47 PM
PW-Misc
Informational
02/01/2018
Nothing going on outside today. They still have asphalt in the parking lot to do.Steve Robbins 01/29/2018 11:03 AM
PW-Misc
Informational
02/01/2018
Nothing going on outside today.Steve Robbins 02/01/2018 2:31 PM
Erosion Control Inspection Failed 2/20/2018 at 2:30 PM 02/20/2018
PW-Erosion and Sediment Control
Corrective Action Required
12/08/2017
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
12/08/2017
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
12/08/2017
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
12/08/2017
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
12/08/2017
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
12/08/2017
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
12/08/2017
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
PW-Erosion and Sediment Control
Corrective Action Required
02/20/2018
Your project is in violation of the Erosion and Sediment control policy.The silt fence is down in the front of the building, it is good in the back, I am going to let them know they need to get there silt fence back up. I did not see any mud running off the property.Steve Robbins 02/20/2018 3:04 PM
Erosion Control Inspection Failed 2/21/2018 at 1:15 PM 02/21/2018
PW-Erosion and Sediment Control
Corrective Action Required
02/20/2018
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
02/20/2018
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
02/20/2018
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/20/2018
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
02/20/2018
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
02/20/2018
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
02/20/2018
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
PW-Erosion and Sediment Control
Corrective Action Required
02/20/2018
Your project is in violation of the Erosion and Sediment control policy.The silt fence is down in the front of the building, it is good in the back, I am going to let them know they need to get there silt fence back up. I did not see any mud running off the property.Steve Robbins 02/20/2018 3:04 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/21/2018
There are problems with the erosion control devices on your site. I talked with Scott Fischer today about the silt fence being down. He said he will get it put back up. I am giving them until March 2.Steve Robbins 02/21/2018 1:46 PM
Site Visit Complete 2/27/2018 02/28/2018
Sidewalk Inspection Partial 2/28/2018 at 3:00 PM 02/28/2018
PW-Install sidewalk
Informational
02/28/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
Sidewalk Inspection Partial 3/1/2018 at 8:15 AM 03/01/2018
PW-Install sidewalk
Informational
02/28/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
03/01/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
Site Visit Complete 3/1/2018 03/01/2018
Sidewalk Inspection Partial 3/6/2018 at 12:45 PM 03/06/2018
PW-Install sidewalk
Informational
03/01/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
03/01/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
03/06/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
Sidewalk Inspection Failed 3/13/2018 at 1:00 PM 03/13/2018
PW-Install sidewalk
Informational
03/06/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
03/06/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
03/06/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
03/13/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
Street - Surface Course Partial 3/14/2018 at 3:00 PM 03/21/2018
PW-Misc
Informational
01/09/2018
The contractors are planning on installing the surface when the weather breaks and the asphalt plants open. The base surfaced has already been installed before I took over this project.Steve Robbins 01/09/2018 11:43 AM
PW-Misc
Informational
03/21/2018
The surface aphalt has not been installed yet.Steve Robbins 03/21/2018 3:57 PM
Sidewalk Inspection Failed 3/22/2018 at 2:00 PM 03/22/2018
PW-Install sidewalk
Informational
03/13/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
03/13/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
03/13/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
03/13/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
03/22/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
Erosion Control Inspection Failed 3/26/2018 at 11:00 AM 03/26/2018
PW-Erosion and Sediment Control
Corrective Action Required
02/21/2018
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
02/21/2018
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
02/21/2018
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/21/2018
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
02/21/2018
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
02/21/2018
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
02/21/2018
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
PW-Erosion and Sediment Control
Corrective Action Required
02/21/2018
Your project is in violation of the Erosion and Sediment control policy.The silt fence is down in the front of the building, it is good in the back, I am going to let them know they need to get there silt fence back up. I did not see any mud running off the property.Steve Robbins 02/20/2018 3:04 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/21/2018
There are problems with the erosion control devices on your site. I talked with Scott Fischer today about the silt fence being down. He said he will get it put back up. I am giving them until March 2.Steve Robbins 02/21/2018 1:46 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/26/2018
There are problems with the erosion control devices on your site.There is silt fence that is down and needs to be put back up.Steve Robbins 03/26/2018 2:30 PM
Erosion Control Inspection Passed 3/30/2018 at 10:00 AM 03/30/2018
PW-Erosion and Sediment Control
Corrective Action Required
03/26/2018
Matt Munger 10/06/2017 2:23 PM Your project is in violation of the Erosion and Sediment control policy. The silt fence is down in several areas around the property and erosion control devices need to be in place around storm inlets.
PW-Erosion and Sediment Control
Informational
03/26/2018
Matt Munger 10/17/2017 3:47 PM Walked the site to make sure the storm inlets had ESC. Two of the inlets on the south side do not have any protection. The north side of the site needs to have a silt fence put in place.
PW-Misc
Informational
03/26/2018
Matt Munger 10/26/2017 2:17 PM Inlets had erosion control devices in place.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/26/2018
Matt Munger 11/14/2017 11:40 AM There are problems with the erosion control devices on your site. I observed no devices in place in the curb inlets along the NE Akin Dr. Per the plans the Contractor is supposed to maintain inlet protection along Akin Drive per city of Lee's Summit standards. It appears there is a 3rd construction entrance being used that doesnt not have gravel in place (tire tracks leaving the site). If the opening is going to be used as an entrance (not on the plans) there needs to be a proper construction entrance in place. If the area is not going to be used as an construction entrance a silt fence needs to be put in place to prevent silt from getting onto the road and into the curb inlets. These issues need to be taken care of soon as possible or you will be in violation and a stop work order issued.
PW-Misc
Informational
03/26/2018
Matt Munger 11/16/2017 10:50 AM ESC devices were not in place in the curb inlets per the plans, I contacted Doug and he stated they would get them in there and take care of it. Contrsuction entrances need to be put in place for the entrances that are not on the plans and the roadways need to be cleaned of dirt and debris. I sent an email as well in regards to the construction entrances.
PW-Misc
Informational
03/26/2018
Matt Munger 11/17/2017 10:09 AM I obserbed ESC devices in place in the curb inlets on NE Akin Dr. and spoke with Scott and asked that they keep the roadways clean as well.
PW-Erosion and Sediment Control
Corrective Action Required
03/26/2018
Your project is in violation of the Erosion and Sediment control policy. Matt Munger 11/22/2017 2:04 PM The areas that are being used as entrances need to have large rock in place to reduce the mud and rock getting onto the pavement as trucks are coming and going. the streets along Akin Dr. need to be cleaned as well.
PW-Erosion and Sediment Control
Corrective Action Required
03/26/2018
Your project is in violation of the Erosion and Sediment control policy.The silt fence is down in the front of the building, it is good in the back, I am going to let them know they need to get there silt fence back up. I did not see any mud running off the property.Steve Robbins 02/20/2018 3:04 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/26/2018
There are problems with the erosion control devices on your site. I talked with Scott Fischer today about the silt fence being down. He said he will get it put back up. I am giving them until March 2.Steve Robbins 02/21/2018 1:46 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/26/2018
There are problems with the erosion control devices on your site.There is silt fence that is down and needs to be put back up.Steve Robbins 03/26/2018 2:30 PM
PW-Misc
Informational
03/30/2018
The contractors have put back up the erosion control silt fence. Everything appears to be fine.Steve Robbins 03/30/2018 3:48 PM
Sidewalk Inspection Partial 4/5/2018 at 11:30 AM 04/05/2018
PW-Install sidewalk
Informational
03/22/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
03/22/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
03/22/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
03/22/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
03/22/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/05/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
Sidewalk Inspection Failed 4/18/2018 at 9:30 AM 04/18/2018
PW-Install sidewalk
Informational
04/05/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
04/05/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
04/05/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
04/05/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/05/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/05/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
04/18/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
Sidewalk Inspection Failed 4/30/2018 at 10:30 AM 04/30/2018
PW-Install sidewalk
Informational
04/18/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
04/18/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
04/18/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
04/18/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/18/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/18/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
04/18/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
04/30/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
Sidewalk Inspection Failed 5/4/2018 at 11:00 AM 05/04/2018
PW-Install sidewalk
Informational
04/30/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
04/30/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
04/30/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
04/30/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/30/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
04/30/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
04/30/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
04/30/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/04/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
Sidewalk Inspection Partial 5/11/2018 at 10:30 AM 05/11/2018
PW-Install sidewalk
Informational
05/04/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
05/04/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
05/04/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
05/04/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/04/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/04/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/04/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/04/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/04/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/11/2018
They have not corrected the ADA problem yet.Steve Robbins 05/11/2018 11:10 AM
Sidewalk Inspection Partial 5/30/2018 at 9:30 AM 05/30/2018
PW-Install sidewalk
Informational
05/11/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
05/11/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
05/11/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
05/11/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/11/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/11/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/11/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/11/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/11/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/11/2018
They have not corrected the ADA problem yet.Steve Robbins 05/11/2018 11:10 AM
Corrective Action Required
05/30/2018
The conctractors have removed the sidewalk ramp and are planning on installed the trunkated dome for the ADA ramp. Steve Robbins 05/30/2018 2:32 PM
Street - Surface Course Partial 5/31/2018 at 2:00 PM 05/31/2018
PW-Misc
Informational
03/21/2018
The contractors are planning on installing the surface when the weather breaks and the asphalt plants open. The base surfaced has already been installed before I took over this project.Steve Robbins 01/09/2018 11:43 AM
PW-Misc
Informational
03/21/2018
The surface aphalt has not been installed yet.Steve Robbins 03/21/2018 3:57 PM
Informational
05/31/2018
They have not installed the surface yet.Steve Robbins 05/31/2018 2:24 PM
Sidewalk Inspection Partial 6/1/2018 at 9:50 AM 06/01/2018
PW-Install sidewalk
Informational
05/30/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
05/30/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
05/30/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
05/30/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/30/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
05/30/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/30/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/30/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
05/30/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/01/2018
The sidewalk does not meet ADA guidelines. They tore out the ada that was wrong but did not install a new one yet. Nothing was going on outside today.Steve Robbins 06/01/2018 2:51 PM
Sidewalk Inspection Partial 6/6/2018 at 11:00 AM 06/06/2018
PW-Install sidewalk
Informational
06/01/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
06/01/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
06/01/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
06/01/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/01/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/01/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/01/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/01/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/01/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/01/2018
The sidewalk does not meet ADA guidelines. They tore out the ada that was wrong but did not install a new one yet. Nothing was going on outside today.Steve Robbins 06/01/2018 2:51 PM
PW-Misc
Corrective Action Required
06/06/2018
The contractors are planning on installing this ada ramp in the next few days, they have been working on pouring sidewalk and steps on the private side in the parking lot.Steve Robbins 06/06/2018 2:23 PM
Sidewalk Inspection Partial 6/11/2018 at 1:15 PM 06/11/2018
PW-Install sidewalk
Informational
06/06/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
06/06/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
06/06/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
06/06/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/06/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/06/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/06/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/06/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/06/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/06/2018
The sidewalk does not meet ADA guidelines. They tore out the ada that was wrong but did not install a new one yet. Nothing was going on outside today.Steve Robbins 06/01/2018 2:51 PM
PW-Misc
Corrective Action Required
06/06/2018
The contractors are planning on installing this ada ramp in the next few days, they have been working on pouring sidewalk and steps on the private side in the parking lot.Steve Robbins 06/06/2018 2:23 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/11/2018
An ADA panel is required for your sidewalk crossing. This work has not been done yet.Steve Robbins 06/11/2018 3:09 PM
Site Visit Complete 6/12/2018 at 11:41 AM 06/12/2018
PW-Misc
Informational
06/12/2018
Brice Lawson 06/12/2018 5:21 PM There did not appear to be any activity for this permit.
Sidewalk Inspection Passed 7/9/2018 at 7:45 AM 07/09/2018
PW-Install sidewalk
Informational
06/11/2018
The sidewalk by the first approach has been formed , about 200 ft. The rock is installed and has been compacted. This will be a series of inspections because they have a lot of sidewalk to pour.Steve Robbins 02/28/2018 3:32 PM
PW-Install sidewalk
Informational
06/11/2018
The next section of sidewalk has been formed and has passed the pre-pour. They will work on the ADA ramps and getting them formed today.Steve Robbins 03/01/2018 12:00 PM
PW-Install sidewalk
Informational
06/11/2018
I did another pre-pour instection for the sidewalk on Akin, this is to the east of the first driveway appproach going to the property line. Today they are also pouring the ADA ramps .Steve Robbins 03/06/2018 3:47 PM
PW-Sidewalk does not meet ADA requirements
Partial Correction
06/11/2018
The sidewalk does not meet ADA guidelines. The sidewalk for the approach on the east side of the building going toward the west has all been installed and has passed except for the ADA going across the street to the south side. The contractors did not install a truncated ada dome. Steve Robbins 03/13/2018 2:14 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/11/2018
I have not yet got a response over this yet.Steve Robbins 03/22/2018 2:59 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/11/2018
An ADA panel is required for your sidewalk crossing. I spoke with the contractor about the ADA ramp dome not being installed and he said he would let the sidewalk contractor know about it , they still have some other sidewalk to install.Steve Robbins 04/05/2018 3:08 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/11/2018
The sidewalk does not meet ADA guidelines. The contractors have not finished all the sidewalk that is to be installed and they have not corrected to ada ramp problem yet. Nothing going on outside but they are working on the building.Steve Robbins 04/18/2018 2:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/11/2018
The sidewalk does not meet ADA guidelines. They have not yet corrected the ADA ramp.Steve Robbins 04/30/2018 2:27 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/11/2018
The sidewalk does not meet ADA guidelines. They have not worked on the ADA ramp as of yet.Steve Robbins 05/04/2018 3:42 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
06/11/2018
The sidewalk does not meet ADA guidelines. They tore out the ada that was wrong but did not install a new one yet. Nothing was going on outside today.Steve Robbins 06/01/2018 2:51 PM
PW-Misc
Corrective Action Required
06/11/2018
The contractors are planning on installing this ada ramp in the next few days, they have been working on pouring sidewalk and steps on the private side in the parking lot.Steve Robbins 06/06/2018 2:23 PM
PW-Install ADA for sidewalk
Corrective Action Required
06/11/2018
An ADA panel is required for your sidewalk crossing. This work has not been done yet.Steve Robbins 06/11/2018 3:09 PM
PW-Misc
Resolved
07/09/2018
The ADA ramp has been installed correctly. This completes all the public sidewalk for this project.Steve Robbins 07/09/2018 3:13 PM
Street - Surface Course Passed 7/31/2018 08/06/2018
PW-Misc
Informational
05/31/2018
The contractors are planning on installing the surface when the weather breaks and the asphalt plants open. The base surfaced has already been installed before I took over this project.Steve Robbins 01/09/2018 11:43 AM
Water Line - Valve Passed 08/06/2018
Water Line - Fire Hydrant Passed 08/06/2018
Water Line - Thrust Restraint Passed 08/06/2018
Water Line - Construction Taps Removed Passed 08/06/2018
Water Line - Construction Inspection Passed 08/06/2018
Install Street and Stop Signs Passed 08/06/2018
Grading/Excavation/Fill Inspection Passed 08/06/2018
Hydrant Inspection Passed 08/06/2018
Fire Line Construction Inspection Passed 08/06/2018
Water Line - Hydrostatic Test Passed 08/06/2018
Storm Sewer Construction Inspection Passed 08/06/2018
ESC - (Vegetation/Ground Cover) Partial 8/24/2018 at 9:00 AM 08/24/2018
PW-Misc
Informational
08/24/2018
None of the vegegtation has been installed or established yet. Steve Robbins 08/24/2018 2:29 PM
ESC - (Vegetation/Ground Cover) Partial 8/30/2018 at 1:30 PM 08/30/2018
PW-Misc
Informational
08/24/2018
None of the vegegtation has been installed or established yet. Steve Robbins 08/24/2018 2:29 PM
PW-Misc
Informational
08/30/2018
No sod or vegetation has been installed yet.Steve Robbins 08/30/2018 2:48 PM
Storm - Inlets Clean Passed 09/07/2018
ESC - (Vegetation/Ground Cover) Partial 10/5/2018 at 9:39 AM 10/05/2018
PW-Misc
Informational
08/30/2018
None of the vegegtation has been installed or established yet. Steve Robbins 08/24/2018 2:29 PM
PW-Misc
Informational
08/30/2018
No sod or vegetation has been installed yet.Steve Robbins 08/30/2018 2:48 PM
PW-Misc
Informational
10/05/2018
The contractors have been working on the landscaping but they have not put in any vegetation yet.Steve Robbins 10/05/2018 2:45 PM
ESC - (Vegetation/Ground Cover) Partial 11/19/2018 at 8:00 AM 11/19/2018
PW-Misc
Informational
10/05/2018
None of the vegegtation has been installed or established yet. Steve Robbins 08/24/2018 2:29 PM
PW-Misc
Informational
10/05/2018
No sod or vegetation has been installed yet.Steve Robbins 08/30/2018 2:48 PM
PW-Misc
Informational
10/05/2018
The contractors have been working on the landscaping but they have not put in any vegetation yet.Steve Robbins 10/05/2018 2:45 PM
PW-Misc
Informational
11/19/2018
The landscaping and the sod for around the building has been installed. The contractors have installed seed and straw throughout the site in the back of the building. I will check back in March to check the progress of the grass coming in.Steve Robbins 11/19/2018 12:43 PM
ESC - (Vegetation/Ground Cover) Passed 1/3/2020 01/03/2020
PW-Misc
Informational
11/19/2018
None of the vegegtation has been installed or established yet. Steve Robbins 08/24/2018 2:29 PM
PW-Misc
Informational
11/19/2018
No sod or vegetation has been installed yet.Steve Robbins 08/30/2018 2:48 PM
PW-Misc
Informational
11/19/2018
The contractors have been working on the landscaping but they have not put in any vegetation yet.Steve Robbins 10/05/2018 2:45 PM
PW-Misc
Informational
11/19/2018
The landscaping and the sod for around the building has been installed. The contractors have installed seed and straw throughout the site in the back of the building. I will check back in March to check the progress of the grass coming in.Steve Robbins 11/19/2018 12:43 PM
Storm - Swales Passed 08/20/2020
Sanitary Sewer Construction Inspection Passed 8/20/2020 08/20/2020
Misc
Informational
08/20/2020
John Jackson notified me that the contractor has installed the new top cone on the sanitary MH that is located in front of the building. This needed to be done because they put too many riser rings on the old MH.
Documents & Images
Date Uploaded File Type Document Name
06/02/2017 Receipt Receipt for transaction: 2017-003390
06/02/2017 Receipt Receipt for transaction: 2017-003390
06/09/2017 Letter PW-Permit
06/26/2017 Letter PW-Daily Inspection Summary
07/26/2017 Letter PW-Daily Inspection Summary
08/03/2017 Letter PW-Daily Inspection Summary
08/29/2017 Letter PW-Daily Inspection Summary
09/11/2017 Letter DE-Daily Inspection Summary.pdf
09/11/2017 Letter DE-Daily Inspection Summary
09/12/2017 Letter DE-Daily Inspection Summary
09/13/2017 Letter DE-Daily Inspection Summary
09/14/2017 Letter DE-Daily Inspection Summary
09/27/2017 Letter DE-Daily Inspection Summary
09/29/2017 Letter DE-Daily Inspection Summary
09/29/2017 Letter DE-Daily Inspection Summary
10/04/2017 Letter DE-Daily Inspection Summary
10/05/2017 Letter DE-Daily Inspection Summary
10/06/2017 Letter DE-Daily Inspection Summary
10/06/2017 Letter DE-Daily Inspection Summary
10/10/2017 Letter DE-Daily Inspection Summary
10/11/2017 Letter DE-Daily Inspection Summary
10/12/2017 Letter DE-Daily Inspection Summary
10/13/2017 Letter DE-Daily Inspection Summary
10/16/2017 Letter DE-Daily Inspection Summary
10/16/2017 Letter DE-Daily Inspection Summary
10/17/2017 DOC101717-10172017070739
10/17/2017 Letter DE-Daily Inspection Summary
10/26/2017 Letter DE-Daily Inspection Summary
10/30/2017 Letter DE-Daily Inspection Summary
10/31/2017 Letter DE-Daily Inspection Summary
11/01/2017 Letter DE-Daily Inspection Summary
11/02/2017 Letter DE-Daily Inspection Summary
11/03/2017 Letter DE-Daily Inspection Summary
11/06/2017 Letter DE-Daily Inspection Summary
11/06/2017 Letter DE-Daily Inspection Summary
11/08/2017 Letter DE-Daily Inspection Summary
11/09/2017 Letter DE-Daily Inspection Summary
11/10/2017 DOC111017-11102017072412 Curb Concrete Ticket
11/10/2017 Letter DE-Daily Inspection Summary
11/13/2017 Letter DE-Daily Inspection Summary
11/13/2017 Letter DE-Daily Inspection Summary
11/14/2017 Letter DE-Daily Inspection Summary
11/14/2017 Letter DE-Daily Inspection Summary
11/14/2017 Letter DE-Daily Inspection Summary
11/15/2017 Letter DE-Daily Inspection Summary
11/16/2017 Letter DE-Daily Inspection Summary
11/17/2017 Letter DE-Daily Inspection Summary
11/22/2017 Letter DE-Daily Inspection Summary
11/27/2017 Letter DE-Daily Inspection Summary
11/27/2017 Letter DE-Daily Inspection Summary
11/28/2017 Letter DE-Daily Inspection Summary
11/29/2017 Letter DE-Daily Inspection Summary
12/04/2017 Letter DE-Daily Inspection Summary
12/05/2017 Letter DE-Daily Inspection Summary
12/05/2017 Letter DE-Daily Inspection Summary
12/12/2017 Letter DE-Daily Inspection Summary
12/18/2017 Letter DE-Daily Inspection Summary
12/19/2017 Letter DE-Daily Inspection Summary
12/20/2017 Letter DE-Daily Inspection Summary
12/22/2017 Letter DE-Daily Inspection Summary
12/29/2017 Letter DE-Site Visit Inspection
01/05/2018 Letter DE-Daily Inspection Summary
01/08/2018 Letter DE-Daily Inspection Summary
01/09/2018 Letter DE-Daily Inspection Summary
01/09/2018 Letter DE-Daily Inspection Summary
01/10/2018 Letter DE-Daily Inspection Summary
01/17/2018 Letter DE-Daily Inspection Summary
01/22/2018 Letter DE-Site Visit Inspection
01/23/2018 Letter DE-Daily Inspection Summary
01/24/2018 Letter DE-Daily Inspection Summary
01/25/2018 Letter DE-Daily Inspection Summary
01/26/2018 Letter DE-Daily Inspection Summary
01/29/2018 Letter DE-Daily Inspection Summary
02/01/2018 Letter DE-Daily Inspection Summary
02/20/2018 Letter DE-Daily Inspection Summary
02/21/2018 Letter DE-Daily Inspection Summary
02/28/2018 Letter DE-Daily Inspection Summary
03/01/2018 Letter DE-Daily Inspection Summary
03/06/2018 Letter DE-Daily Inspection Summary
03/13/2018 Letter DE-Daily Inspection Summary
03/21/2018 Letter DE-Daily Inspection Summary
03/22/2018 Letter DE-Daily Inspection Summary
03/26/2018 Letter DE-Daily Inspection Summary
03/30/2018 Letter DE-Daily Inspection Summary
04/05/2018 Letter DE-Daily Inspection Summary
04/18/2018 Letter DE-Daily Inspection Summary
04/30/2018 Letter DE-Daily Inspection Summary
05/04/2018 Letter DE-Daily Inspection Summary
05/11/2018 Letter DE-Daily Inspection Summary
05/30/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Daily Inspection Summary
06/01/2018 Letter DE-Daily Inspection Summary
06/06/2018 Letter DE-Daily Inspection Summary
07/09/2018 Letter DE-Daily Inspection Summary
08/24/2018 Letter DE-Daily Inspection Summary
08/30/2018 Letter DE-Daily Inspection Summary
09/06/2018 Letter DE-Punch List
09/06/2018 Letter DE-Certificate of Substantial Completion Multiple Lot
09/07/2018 Control Services Substantial and Punch List
10/05/2018 Letter DE-Daily Inspection Summary
11/19/2018 Letter DE-Daily Inspection Summary
08/20/2020 Letter DE-Daily Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.