Permit Application Status

PRSGN20254255


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20254255
Sign Permit
Issued
DEER BROOK BGOG LLC
SIGN
Install (1) new wall sign - illuminated channel letters on non-illuminated backer panel - 179"W x 52.5"H
10/02/2025
10/02/2025
Locations
Contacts
HEARTLAND SIGN & LIGHTING, Address:P O BOX 14982, Phone:(913) 642-7446  
DEER BROOK BGOG LLC, Address:199 S HIGH ST STE 100  
Julie Higgins, Address:P.O. Box 14982, Phone:(913) 642-7446  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 10/06/2025 10/02/2025
Claire Byers
Fees
Paid Fees Amount Paid Owing Date Paid
Sign Permit-Permanent Fee $100.00 $100.00 Paid 10/02/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Electrical Inspection Pending
Sign Confirmation Inspection Pending 11/20/2025
Sign Confirmation Inspection Not Ready 10/23/2025 10/29/2025
Documents & Images
Date Uploaded File Type Document Name
10/02/2025 Q113248 BAM_Lees Summit MO - 7 16 25
10/02/2025 Landowner Signature Page - City of LS - Bricks Sign 93025[11]
10/02/2025 Permit DS P/R Corrections Document
10/02/2025 Permit DS Building Permit
10/02/2025 Receipt Receipt for transaction:2025-007517
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home