Permit Application Status

PRRES20252500


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20252500
Building Permit - Residential
Issued
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED PATIO.
06/16/2025
06/23/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
HUNT MIDWEST RESIDENTIAL LLC, Address:1881 MAIN ST STE 200  
Elevate Design + Build , Address:350 Longview Blvd.   
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
BILL@ELEVATEDESIGNBUILDKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 06/23/2025
Water Meter Fee $748.03 $748.03 Paid 06/23/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 06/23/2025
Right of Way Permit Fee $85.00 $85.00 Paid 06/23/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/23/2025
Valuation Fee New Single Family $1,273.48 $1,273.48 Paid 06/23/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Misc
Corrective Action Required
10/14/2025
10/14/25 Tyler S. SW is formed and compacted. Approve to pour.
Driveway Inspection Pending
Misc
Informational
10/14/2025
10-13-25 Dustin A, dw has been formed, but is not compacted. Along the curb there is insufficient aggregate at the curb line ( min 4 inches ) Fail 10/14/25 Tyler S. DW has been fomed and is now compacted with 4+ inches of aggregate at curb. Approve to pour.
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
10/17/2025
10/17/25 Tyler S. Dirt and concrete at the curb on both sides of the DW need to be cleaned up. Silt fence also needs to be put back up. If straw waddles are not doing their job, silt fence should be installed. Fail.
Footing Inspection - Residential Passed 7/14/2025 07/14/2025
Sewer Service Inspection - R Passed 7/29/2025 07/29/2025
Water Service Inspection - R Passed 7/29/2025 07/29/2025
Underslab Plumbing Inspection - Residential Passed 7/30/2025 7/30/2025 07/30/2025
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
7-30-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
08/04/2025
7-30-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion control has been reestablished.
Electrical Service Inspection Passed 9/12/2025 9/12/2025 09/12/2025
Gas Service Inspection - Residential Passed 9/12/2025 9/12/2025 09/12/2025
All Rough Inspection - Residential Not Ready 9/12/2025 9/12/2025 09/12/2025
Misc
Corrective Action Required
09/12/2025
No city stamp plans on site
All Rough Inspection - Residential Failed 9/15/2025 9/15/2025 09/15/2025
Misc
Resolved
09/15/2025
No city stamp plans on site
Misc
Corrective Action Required
09/15/2025
-nail pattern in corner of garage -bolts in sill plate need to be in the center of the sill -stringer for fur down in basement over 4’span
All Rough Inspection - Residential Passed 9/16/2025 9/16/2025 09/16/2025
Misc
Resolved
09/16/2025
-nail pattern in corner of garage -bolts in sill plate need to be in the center of the sill -stringer for fur down in basement over 4’span
Driveway Inspection Failed 10/13/2025 10/13/2025 10/13/2025
Misc
Informational
10/13/2025
10-13-25 Dustin A, dw has been formed, but is not compacted. Along the curb there is insufficient aggregate at the curb line ( min 4 inches ) Fail
Sidewalk Inspection Failed 10/13/2025 10/13/2025 10/13/2025
Misc
Informational
10/13/2025
10-13-25 Dustin A, sw has been formed, Dis not check slopes due to not being compacted in some areas . Fail
Sidewalk Inspection Partial 10/14/2025 10/14/2025 10/14/2025
Misc
Corrective Action Required
10/14/2025
10/14/25 Tyler S. SW is formed and compacted. Approve to pour.
Driveway Inspection Partial 10/14/2025 10/14/2025 10/14/2025
Misc
Informational
10/13/2025
10-13-25 Dustin A, dw has been formed, but is not compacted. Along the curb there is insufficient aggregate at the curb line ( min 4 inches ) Fail 10/14/25 Tyler S. DW has been fomed and is now compacted with 4+ inches of aggregate at curb. Approve to pour.
Erosion Control Inspection Residential Failed 10/17/2025 10/17/2025 10/17/2025
Misc
Corrective Action Required
10/17/2025
10/17/25 Tyler S. Dirt and concrete at the curb on both sides of the DW need to be cleaned up. Silt fence also needs to be put back up. If straw waddles are not doing their job, silt fence should be installed. Fail.
Documents & Images
Date Uploaded File Type Document Name
06/16/2025 Residental Permit Application-25-6-16
06/16/2025 Tax_Application-25-6-16
06/18/2025 Permit Codes Residential Plan Review
06/23/2025 Permit DS Building Permit
06/23/2025 Receipt Receipt for transaction:2025-004748
06/24/2025 Approved Plans APPROVED PLANS
06/24/2025 Plot Plan APPROVED PLOT PLAN
07/11/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
07/14/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/15/2025 Letter INSPECTION SUMMARY
09/16/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/14/2025 Letter INSPECTION SUMMARY
10/14/2025 Letter INSPECTION SUMMARY
10/17/2025 Letter INSPECTION SUMMARY
10/17/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home