Permit Application Status

PRRES20252500


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20252500
Building Permit - Residential
Issued
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED PATIO.
06/16/2025
06/23/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
HUNT MIDWEST RESIDENTIAL LLC, Address:1881 MAIN ST STE 200  
Elevate Design + Build , Address:350 Longview Blvd.   
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
BILL@ELEVATEDESIGNBUILDKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 06/23/2025
Water Meter Fee $748.03 $748.03 Paid 06/23/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 06/23/2025
Right of Way Permit Fee $85.00 $85.00 Paid 06/23/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/23/2025
Valuation Fee New Single Family $1,273.48 $1,273.48 Paid 06/23/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
All Rough Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending 8/4/2025 8/4/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
7-30-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Footing Inspection - Residential Passed 7/14/2025 07/14/2025
Sewer Service Inspection - R Passed 7/29/2025 07/29/2025
Water Service Inspection - R Passed 7/29/2025 07/29/2025
Underslab Plumbing Inspection - Residential Passed 7/30/2025 7/30/2025 07/30/2025
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
7-30-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Documents & Images
Date Uploaded File Type Document Name
06/16/2025 Residental Permit Application-25-6-16
06/16/2025 Tax_Application-25-6-16
06/18/2025 Permit Codes Residential Plan Review
06/23/2025 Permit DS Building Permit
06/23/2025 Receipt Receipt for transaction:2025-004748
06/24/2025 Approved Plans APPROVED PLANS
06/24/2025 Plot Plan APPROVED PLOT PLAN
07/11/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
07/14/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home