Summary
PRRES20252025
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED DECK - ROOF TRUSSES
05/16/2025
05/19/2025
11/15/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/19/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/19/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/19/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 05/19/2025
Water Meter Fee $748.03 $748.03 Paid 05/19/2025
Valuation Fee New Single Family $1,326.39 $1,326.39 Paid 05/19/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -repair down silt fence/straw wattles -maintain overgrown vegetation
Footing Inspection - Residential Passed 6/2/2025 6/2/2025 06/02/2025
Underslab Plumbing Inspection - Residential Passed 6/6/2025 6/6/2025 06/06/2025
Sewer Service Inspection - R Passed 6/10/2025 6/10/2025 06/10/2025
Water Service Inspection - R Passed 6/11/2025 6/11/2025 06/11/2025
All Rough Inspection - Residential Partial 6/27/2025 6/27/2025 06/27/2025
Misc
Corrective Action Required
06/27/2025
Garage portal exterior nailing and covers porch and patio trusses only inspected- okay to cover
Erosion Control Inspection Residential Failed 7/17/2025 07/17/2025
Misc
Corrective Action Required
07/17/2025
- REMOVE LOOSE TRASH ON LOT.
Gas Service Inspection - Residential Passed 7/17/2025 7/17/2025 07/17/2025
Electrical Service Inspection Passed 7/17/2025 7/17/2025 07/17/2025
All Rough Inspection - Residential Failed 7/17/2025 7/17/2025 07/17/2025
Misc
Resolved
07/17/2025
Garage portal exterior nailing and covers porch and patio trusses only inspected- okay to cover
Misc
Corrective Action Required
07/17/2025
- Address anchor bolts at garage sill plate breaks too close to edge. To be 7x the diameter of bolt used from end and not more than 12” in. - Provide roof boots - Provide attic access - No sill plate or stud on West side of exterior corner wall of basement north/ west corner
All Rough Inspection - Residential Failed 7/22/2025 7/22/2025 07/22/2025
Misc
Corrective Action Required
07/17/2025
- Address anchor bolts at garage sill plate breaks too close to edge. Anchor bolts To be not closer than 7x the diameter of bolt from end and not more than 12” away - No sill plate under stud on West side of exterior corner wall of basement north/ west corner
Erosion Control Inspection Residential Failed 7/22/2025 7/22/2025 07/22/2025
Misc
Resolved
07/22/2025
- REMOVE LOOSE TRASH ON LOT.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -repair down silt fence/straw wattles -maintain overgrown vegetation
All Rough Inspection - Residential Passed 7/24/2025 7/24/2025 07/24/2025
Misc
Resolved
07/24/2025
- Address anchor bolts at garage sill plate breaks too close to edge. Anchor bolts To be not closer than 7x the diameter of bolt from end and not more than 12” away - No sill plate under stud on West side of exterior corner wall of basement north/ west corner
Driveway Inspection Partial 8/27/2025 8/27/2025 08/27/2025
Misc
Informational
08/27/2025
8-27-25 Dustin A, Dw has been formed and compacted. Approved to pour
Sidewalk Inspection Partial 8/27/2025 8/27/2025 08/27/2025
Misc
Informational
08/27/2025
8-27-25 Dustin A, Sw has been formed and compacted. Slopes are in compliance. Approved to pour.
Driveway Inspection Passed 9/3/2025 9/3/2025 09/03/2025
Misc
Informational
08/27/2025
8-27-25 Dustin A, Dw has been formed and compacted. Approved to pour 9-3-25 Dustin A, Dw has been poured to city specs. Pass
Sidewalk Inspection Passed 9/3/2025 9/3/2025 09/03/2025
Misc
Informational
08/27/2025
8-27-25 Dustin A, Sw has been formed and compacted. Slopes are in compliance. Approved to pour. 9-3-25 Dustin A, Sw has been poured to city specs and slopes are in compliance. Pass
Piers/Caissons Inspection - Residential Failed 9/12/2025 9/12/2025 09/12/2025
Misc
Corrective Action Required
09/12/2025
Piers not correct dept or diameter
Piers/Caissons Inspection - Residential Passed 9/12/2025 (P.M.) 9/12/2025 09/12/2025
Misc
Resolved
09/12/2025
Piers not correct dept or diameter
Documents & Images
Date Uploaded File Type Document Name
05/16/2025 BY #2050 - PERMIT APP'
05/19/2025 Permit Codes Residential Plan Review
05/19/2025 Approved Plans APPROVED PLANS
05/19/2025 Approved Plans APPROVED TRUSS LAYOUT
05/19/2025 Approved Plans APPROVED TRUSS PACKET
05/19/2025 Permit Codes Residential Plan Review
05/19/2025 Plot Plan APPROVED PLOT PLAN
05/19/2025 Permit DS Building Permit
05/19/2025 Receipt Receipt for transaction:2025-003532
05/31/2025 3RD Party Insp Report M L Crose 1432 SE Silo St, LSMO 3rd Party Footing Inspection Report Pg 1 of 2 5-30-25
05/31/2025 3RD Party Insp Report M L Crose 1432 SE Silo St, LSMO 3rd Party Footing Inspection Report Pg 2 of 2 5-30-25
06/02/2025 Letter INSPECTION SUMMARY
06/06/2025 Letter INSPECTION SUMMARY
06/10/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/24/2025 Letter INSPECTION SUMMARY
08/27/2025 Letter INSPECTION SUMMARY
08/27/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home