Summary
PRRES20251357
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - HOUSE BUILT ON SLAB
04/08/2025
04/23/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
SARA@ELEVATEDESIGNBUILDKC.COM  
FIVE STAR MECHANICAL CONTRACT INC, Address:P O BOX 11964, Phone:(816) 358-4444  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/23/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/23/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/23/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/23/2025
Water Meter Fee $748.03 $748.03 Paid 04/23/2025
Valuation Fee New Single Family $1,288.09 $1,288.09 Paid 04/23/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Misc
Informational
08/08/2025
Check ceiling in furnace room for proper fire blocking
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
09/03/2025
8/21/25 Tyler S. Silt fence is down in multiple areas and gravel and debris needs swept off of the road and curb line. The porta-potty need to be moved and cannot be on public roadways. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Corrections need to be done by the 27th or a stop work order will be issued.
Footing Inspection - Residential Passed 5/27/2025 05/27/2025
Sewer Service Inspection - R Passed 6/11/2025 6/11/2025 06/11/2025
Water Service Inspection - R Passed 6/13/2025 6/13/2025 06/13/2025
Underslab Plumbing Inspection - Residential Passed 6/20/2025 6/20/2025 06/20/2025
All Rough Inspection - Residential Failed 8/5/2025 8/5/2025 08/05/2025
Misc
Corrective Action Required
08/05/2025
Garage portal frame missing proper nailing pattern on right side, cs-pf at rear living trim wall missing bottom plate bolts, square washers and nuts
Electrical Service Inspection Passed 8/8/2025 8/8/2025 08/08/2025
Gas Service Inspection - Residential Passed 8/8/2025 8/8/2025 08/08/2025
Occupancy Inspection - Codes Residential Failed 8/8/2025 08/08/2025
Misc
Informational
08/08/2025
Check ceiling in furnace room for proper fire blocking
All Rough Inspection - Residential Failed 8/8/2025 8/8/2025 08/08/2025
Misc
Resolved
08/08/2025
Garage portal frame missing proper nailing pattern on right side, cs-pf at rear living trim wall missing bottom plate bolts, square washers and nuts
Misc
Corrective Action Required
08/08/2025
2132 SW Wheatfield dr - Security blocking at back door - Add straps at top plate at hvac penetrations - Fire blocking needed top of dryer vent
All Rough Inspection - Residential Passed 8/11/2025 8/11/2025 08/11/2025
Misc
Resolved
08/11/2025
2132 SW Wheatfield dr - Security blocking at back door - Add straps at top plate at hvac penetrations - Fire blocking needed top of dryer vent
Driveway Inspection Partial 8/22/2025 8/22/2025 08/22/2025
Misc
Informational
08/22/2025
8/21/25 Tyler S. DW is in compliance. Approve to pour.
Erosion Control Inspection Residential Failed 8/22/2025 8/22/2025 08/22/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/22/2025
8/21/25 Tyler S. Silt fence is down in multiple areas and gravel and debris needs swept off of the road and curb line. The porta-potty need to be moved and cannot be on public roadways. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Corrections need to be done by the 27th or a stop work order will be issued.
Erosion Control Inspection Residential Failed 8/27/2025 8/27/2025 08/29/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/22/2025
8/21/25 Tyler S. Silt fence is down in multiple areas and gravel and debris needs swept off of the road and curb line. The porta-potty need to be moved and cannot be on public roadways. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Corrections need to be done by the 27th or a stop work order will be issued.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/29/2025
8/29/25 Tyler S. Curb line still need s to be cleaned. Silt fence is still lacking in areas. Restrooms need to be in the green space. Need to be corrected by 9/3/25.EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Passed 8/29/2025 8/29/2025 08/29/2025
Misc
Informational
08/22/2025
8/21/25 Tyler S. DW is in compliance. Approve to pour. 8/29/25 Tyler S. DW is in compliance and meets city specs. Pass.
Erosion Control Inspection Residential Partial 9/3/2025 9/3/2025 09/03/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/29/2025
8/21/25 Tyler S. Silt fence is down in multiple areas and gravel and debris needs swept off of the road and curb line. The porta-potty need to be moved and cannot be on public roadways. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Corrections need to be done by the 27th or a stop work order will be issued.
DCM3 ESC REQUIRED 2 DAY
Resolved
09/03/2025
8/29/25 Tyler S. Curb line still need s to be cleaned. Silt fence is still lacking in areas. Restrooms need to be in the green space. Need to be corrected by 9/3/25.EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 9/3/25 Tyler S. Erosion control has been corrected and is in compliance. Porta-potty has been moved and curb cleaned up.
Documents & Images
Date Uploaded File Type Document Name
04/08/2025 License_Tax_Application-25-4-8
04/08/2025 Permit Application-25-4-8
04/10/2025 Permit Codes Residential Plan Review
04/10/2025 Plot Plan APPROVED PLOT PLAN
04/23/2025 Permit DS Building Permit
04/23/2025 Receipt Receipt for transaction:2025-002531
04/24/2025 Approved Plans APPROVED PLANS
05/23/2025 149 Hook Farms - FTG-Stamped
05/27/2025 Letter INSPECTION SUMMARY
06/03/2025 149 Hook Farms - FND-Stamped
06/11/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/11/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/29/2025 Letter INSPECTION SUMMARY
08/29/2025 Letter INSPECTION SUMMARY
08/29/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home