Permit Application Status

PRRES20250470


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250470
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED PATIO. STOP WORK ORDER generated on 04/24/2025 12:00 AM by username 'Drew Fischer'. STOP WORK ORDER removed on 04/30/2025 12:00 AM by username 'Drew Fischer'. STOP WORK ORDER generated on 07/29/2025 12:00 AM by username 'Jamie Simerly'. STOP WORK ORDER removed on 07/31/2025 12:00 AM by username 'Drew Fischer'.
02/11/2025
02/19/2025
08/12/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
BILL@ELEVATEDESIGNBUILDKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 02/19/2025
Water Meter Fee $748.03 $748.03 Paid 02/19/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 02/19/2025
Right of Way Permit Fee $85.00 $85.00 Paid 02/19/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 02/19/2025
Valuation Fee New Single Family $1,332.16 $1,332.16 Paid 02/19/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
07/31/2025
- Erosion control in place at time of inspection.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/31/2025
07/25/25 Jamie S, Erosion control needs to be reestablished. Street need to be cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 07/29/25 Jamie S, Erosion control needs to be reestablished.
Misc
Corrective Action Required
07/31/2025
Proper erosion control in place at time of inspection and stop work order removed
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
07/31/2025
2631 SW Tracker - as graded plot plan needed - Irrigation outlet in garage needs labeled as non gfci - Outlet in single car bay doesn’t properly trip gfci - Obtain irrigation permit - Security screws needed at back door - Outlets in master bath trip gfci in front Hallway bathroom - Label sump outlet as non gfci - Land sewer tracer wire at grade - Outlet needed within 10’ of outside AC unit
Footing Inspection - Residential Passed 4/7/2025 4/7/2025 04/07/2025
Misc
Informational
04/07/2025
3rd party inspection
Sewer Service Inspection - R Passed 4/7/2025 4/7/2025 04/07/2025
Erosion Control Inspection Residential Failed 04/07/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/07/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Water Service Inspection - R Partial 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
Poly out of wall with 12’ of copper
Underslab Plumbing Inspection - Residential Passed 4/9/2025 4/9/2025 04/09/2025
Water Service Inspection - R Passed 4/9/2025 4/9/2025 04/09/2025
Misc
Resolved
04/09/2025
Poly out of wall with 12’ of copper
Erosion Control Inspection Residential Partial 4/22/2025 04/22/2025
Misc
Corrective Action Required
04/22/2025
- Erosion control in place at time of inspection.
All Rough Inspection - Residential Failed 4/22/2025 4/22/2025 04/22/2025
Misc
Corrective Action Required
04/22/2025
PORTAL FRAME AND CS-PF ONLY -CS-PF MISSING ONE STRAP - PFH SHEETING IS TO HAVE SHEET BREAKS IN THE MIDDLE 2 FT. FROM TOP OF HEADER TO BOTTEM OF SILL PLAE.
All Rough Inspection - Residential Failed 4/24/2025 4/24/2025 04/24/2025
Misc
Corrective Action Required
04/22/2025
PORTAL FRAME AND CS-PF ONLY -Portal frame ok -CS-PF ok
Erosion Control Inspection Residential Failed - Stop Work 04/24/2025
Misc
Corrective Action Required
04/22/2025
- Erosion control in place at time of inspection.
Misc
Corrective Action Required
04/24/2025
Remove all loose trash and debris blowing from lot
Erosion Control Inspection Residential Not Ready 4/28/2025 4/28/2025 04/28/2025
Misc
Corrective Action Required
04/24/2025
- Erosion control in place at time of inspection.
Misc
Corrective Action Required
04/24/2025
Remove all loose trash and debris blowing from lot Trash and debris still not removed. 04/28/25
Erosion Control Inspection Residential Partial 4/30/2025 4/30/2025 04/30/2025
Misc
Corrective Action Required
04/28/2025
- Erosion control in place at time of inspection.
Misc
Resolved
04/30/2025
Remove all loose trash and debris blowing from lot Trash and debris still not removed. 04/28/25
Electrical Service Inspection Passed 5/20/2025 5/20/2025 05/20/2025
Gas Service Inspection - Residential Passed 5/20/2025 5/20/2025 05/20/2025
All Rough Inspection - Residential Passed 5/20/2025 5/20/2025 05/20/2025
Misc
Informational
05/20/2025
PORTAL FRAME AND CS-PF ONLY -Portal frame ok -CS-PF ok
Piers/Caissons Inspection - Residential Passed 7/2/2025 7/2/2025 07/02/2025
Driveway Inspection Partial 7/3/2025 7/3/2025 07/03/2025
Misc
Informational
07/03/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour.
Driveway Inspection Failed 7/10/2025 7/10/2025 07/10/2025
Misc
Informational
07/03/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour. 07/10/25 Jamie S, DW does not have requested grout on the curb to patch damage of the curb during construction. All surfaces must be cleaned off for inspection. Call in for reinspection once curb is grouted.
Erosion Control Inspection Residential Failed 7/25/2025 7/25/2025 07/25/2025
Misc
Corrective Action Required
04/30/2025
- Erosion control in place at time of inspection.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/25/2025
07/25/25 Jamie S, Erosion control needs to be reestablished. Street need to be cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Passed 7/25/2025 7/25/2025 07/25/2025
Misc
Informational
07/10/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour. 07/10/25 Jamie S, DW does not have requested grout on the curb to patch damage of the curb during construction. All surfaces must be cleaned off for inspection. Call in for reinspection once curb is grouted. 07/25/25 Jamie S, DW is in compliance with city standards.
Erosion Control Inspection Residential Failed - Stop Work 7/29/2025 7/29/2025 07/29/2025
Misc
Corrective Action Required
07/25/2025
- Erosion control in place at time of inspection.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/25/2025
07/25/25 Jamie S, Erosion control needs to be reestablished. Street need to be cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 07/29/25 Jamie S, Erosion control needs to be reestablished.
Plot Plan Inspection Failed 7/31/2025 07/31/2025
Misc
Corrective Action Required
07/31/2025
As graded plot plan needed
Erosion Control Inspection Residential Partial 7/31/2025 07/31/2025
Misc
Corrective Action Required
07/29/2025
- Erosion control in place at time of inspection.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/29/2025
07/25/25 Jamie S, Erosion control needs to be reestablished. Street need to be cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 07/29/25 Jamie S, Erosion control needs to be reestablished.
Misc
Corrective Action Required
07/31/2025
Proper erosion control in place at time of inspection and stop work order removed
Occupancy Inspection - Codes Residential Failed 7/31/2025 7/31/2025 07/31/2025
Misc
Corrective Action Required
07/31/2025
2631 SW Tracker - as graded plot plan needed - Irrigation outlet in garage needs labeled as non gfci - Outlet in single car bay doesn’t properly trip gfci - Obtain irrigation permit - Security screws needed at back door - Outlets in master bath trip gfci in front Hallway bathroom - Label sump outlet as non gfci - Land sewer tracer wire at grade - Outlet needed within 10’ of outside AC unit
Plot Plan Inspection Passed 8/1/2025 08/01/2025
Misc
Resolved
08/01/2025
As graded plot plan needed
Documents & Images
Date Uploaded File Type Document Name
02/11/2025 Permit Application-25-2-11
02/11/2025 Tax_Application-25-2-11
02/13/2025 Permit Codes Residential Plan Review
02/19/2025 Approved Plans APPROVED PLANS
02/19/2025 Plot Plan APPROVED PLOT PLAN
02/19/2025 Permit Codes Residential Plan Review
02/19/2025 Permit DS Building Permit
02/19/2025 Receipt Receipt for transaction:2025-000996
03/07/2025 Approved Plans 3-7-25 APPROVED PLANS
03/19/2025 3RD Party Insp Report 138 Hook Farms - FTG-Stamped
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter Stop Work Order
04/24/2025 Letter INSPECTION SUMMARY
04/28/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
05/20/2025 Letter INSPECTION SUMMARY
05/20/2025 Letter INSPECTION SUMMARY
05/20/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/25/2025 Letter INSPECTION SUMMARY
07/25/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter Stop Work Order
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 138 Hook Farm As Graded 2631 Tracker
07/31/2025 Plot Plan APPROVED PLOT PLAN
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: