Permit Application Status

PRRES20250416


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250416
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO - SUSPENDED STOOP STOP WORK ORDER generated on 04/23/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/24/2025 12:00 AM by username 'Jamie Simerly'.
02/04/2025
02/27/2025
08/24/2025
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
kevin higdon, Address:po box 847  
KEVIN@HIGDONBUILDERS.COM  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8350015-Water Meter Fee $748.03 $748.03 Paid 02/27/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 02/27/2025
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 02/27/2025
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 02/27/2025
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 02/27/2025
9110078-Valuation Fee New Single Family $1,413.70 $1,413.70 Paid 02/27/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
06/05/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX -maintain gravel filter -clean silt and debris from street
Misc
Corrective Action Required
06/05/2025
Cut grass Clean street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/05/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 3/14/2025 03/14/2025
Misc
Corrective Action Required
03/14/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX - PROTECTION OF STOCK PILE REQUIRED
Footing Inspection - Residential Passed 3/14/2025 3/14/2025 03/14/2025
Misc
Informational
03/14/2025
UFER 20' BEHIND GARAGE ON WEST WALL
Sewer Service Inspection - R Passed 4/1/2025 4/1/2025 04/01/2025
Water Service Inspection - R Passed 4/2/2025 4/2/2025 04/02/2025
Erosion Control Inspection Residential Failed 4/2/2025 04/02/2025
Misc
Corrective Action Required
03/14/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX - PROTECTION OF STOCK PILE REQUIRED - POST ADDRESS
Underslab Plumbing Inspection - Residential Passed 4/9/2025 4/9/2025 04/09/2025
Erosion Control Inspection Residential Failed 4/21/2025 4/21/2025 04/21/2025
Misc
Corrective Action Required
04/02/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX - PROTECTION OF STOCK PILE REQUIRED - POST ADDRESS
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/21/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-21-25 Dustin A, Silt fence is down right side of approach
Erosion Control Inspection Residential Failed - Stop Work 4/23/2025 4/23/2025 04/23/2025
Misc
Corrective Action Required
04/21/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX - PROTECTION OF STOCK PILE REQUIRED - POST ADDRESS
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/21/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-21-25 Dustin A, Silt fence is down right side of approach 4-23-25 Dustin A, Silt fence has not been repaired.
Erosion Control Inspection Residential Partial 4/24/2025 4/24/2025 04/24/2025
Misc
Corrective Action Required
04/23/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX - PROTECTION OF STOCK PILE REQUIRED - POST ADDRESS
DCM3 ESC REQUIRED 2 DAY
Resolved
04/24/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-21-25 Dustin A, Silt fence is down right side of approach 4-23-25 Dustin A, Silt fence has not been repaired. 04-24-25 Jamie S, Erosion control has been installed.
Erosion Control Inspection Residential Failed 5/8/2025 05/08/2025
Misc
Corrective Action Required
04/24/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX -maintain gravel filter -clean silt and debris from street
Piers/Caissons Inspection - Residential Passed 5/8/2025 5/8/2025 05/08/2025
All Rough Inspection - Residential Failed 5/30/2025 5/30/2025 05/30/2025
Misc
Corrective Action Required
05/30/2025
-add stud at roof load -nail roof joist hanger in living room/kitchen -kicker stud at all roof rafters -bolt down basement post -nail strap water lines -notch in floor joist -derate sub panel in basement to accommodate thermal condition in garage attic space
Erosion Control Inspection Residential Failed 5/30/2025 05/30/2025
Misc
Corrective Action Required
05/08/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX -maintain gravel filter -clean silt and debris from street
Misc
Corrective Action Required
05/30/2025
Cut grass Clean street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/30/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 6/2/2025 6/2/2025 06/02/2025
Misc
Corrective Action Required
05/30/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX -maintain gravel filter -clean silt and debris from street
Misc
Corrective Action Required
05/30/2025
Cut grass Clean street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/30/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/02/2025
06-02-25 Jamie S, Erosion control needs to be reestablished. Streets need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 6/5/2025 6/5/2025 06/05/2025
Misc
Corrective Action Required
06/02/2025
- CLEAN AND RESTORE PROTECION AT STORM INLET BOX -maintain gravel filter -clean silt and debris from street
Misc
Corrective Action Required
06/02/2025
Cut grass Clean street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/02/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Resolved
06/05/2025
06-02-25 Jamie S, Erosion control needs to be reestablished. Streets need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 06-05-25 Jamie S, Erosion Control has been reestablished.
All Rough Inspection - Residential Passed 6/5/2025 6/5/2025 06/05/2025
Misc
Resolved
06/05/2025
-add stud at roof load -nail roof joist hanger in living room/kitchen -kicker stud at all roof rafters -bolt down basement post -nail strap water lines -notch in floor joist -derate sub panel in basement to accommodate thermal condition in garage attic space
Documents & Images
Date Uploaded File Type Document Name
02/04/2025 exciseapplication 3932 sw flintrock
02/06/2025 Permit Codes Residential Plan Review
02/07/2025 Application Form Lees Summit Residental Permit Application 3932 sw flintrock
02/25/2025 Permit Codes Residential Plan Review
02/25/2025 Plot Plan APPROVED PLOT PLAN
02/27/2025 Plans APPROVED PLANS
02/27/2025 Permit Codes Residential Plan Review
02/27/2025 Permit DS Building Permit
02/27/2025 Receipt Receipt for transaction:2025-001171
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter Stop Work Order
04/23/2025 Letter Stop Work Order
04/24/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
06/05/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home