Permit Application Status

PRRES20250365


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250365
Building Permit - Residential
Issued
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED AND UNCOVERED DECK -
02/02/2025
02/17/2025
Locations
Contacts
TRUMARK HOMES, LLC, Address:PO BOX 728, Phone:(816) 564-5613  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
MARK A YANCIK, Address:508 nw manor dr  
TRUMARKHOMES.MARK@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 02/17/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 02/17/2025
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 02/17/2025
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 02/17/2025
8350015-Water Meter Fee $748.03 $748.03 Paid 02/17/2025
9110078-Valuation Fee New Single Family $1,758.57 $1,758.57 Paid 02/17/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
All Rough Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AND RESTORE EROSION CONTROL TO COMPLIANCE
Erosion Control Inspection Residential Failed 3/27/2025 3/27/2025 03/27/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/27/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. ***3/27/25 -Provide erosion control methods at spoils piles on adjacent lot, clean debris from streets, post address.
Footing Inspection - Residential Passed 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
Approved by David Ainsworth on 3/26/25
Erosion Control Inspection Residential Partial 4/2/2025 4/2/2025 04/02/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
04/02/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. ***3/27/25 -Provide erosion control methods at spoils piles on adjacent lot, clean debris from streets, post address.
Erosion Control Inspection Residential Partial 04/16/2025
Underslab Plumbing Inspection - Residential Passed 4/16/2025 4/16/2025 04/16/2025
Erosion Control Inspection Residential Partial 04/23/2025
Sewer Service Inspection - R Passed 4/23/2025 4/23/2025 04/23/2025
Erosion Control Inspection Residential Failed 4/30/2025 04/30/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AND RESTORE EROSION CONTROL TO COMPLIANCE
Water Service Inspection - R Passed 4/30/2025 4/30/2025 04/30/2025
Documents & Images
Date Uploaded File Type Document Name
02/02/2025 LOT 128 WOODSIDE PERMIT APPLICATION
02/02/2025 128 Woodside Staked
02/02/2025 4365LA PLAN LOT 128 WOODSIDE
02/03/2025 Approved Plans APPROVED PLANS
02/03/2025 Plot Plan APPROVED PLOT PLAN
02/04/2025 Permit Codes Residential Plan Review
02/17/2025 Permit DS Building Permit
02/17/2025 Receipt Receipt for transaction:2025-000948
03/26/2025 3RD Party Insp Report M L Crose 2123 NW Killarney Ln LSMO 3rd Party Footing Inspection Report Pg 1 3-26-25
03/26/2025 3RD Party Insp Report M L Crose 2123 NW Killarney Ln LSMO 3rd Party Footing Inspection Report Pg 2 3-26-25
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home