Permit Application Status

PRRES20250075


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250075
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME - SLAB ON GRADE, COVERED PORCH
01/06/2025
06/25/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $939.10 $939.10 Paid 04/03/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/03/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/03/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/03/2025
Water Meter Fee $748.03 $748.03 Paid 04/03/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/03/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 01/27/2026
Temporary Occupancy Fee $50.00 $50.00 Paid 02/12/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
02/09/2026
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/09/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-9-26 Dustin A, corrections made
Occupancy Inspection - Codes Residential Pending 3/14/2026
Misc
Corrective Action Required
02/12/2026
-final grade -sod
Erosion Control Inspection Residential Partial 5/14/2025 5/14/2025 05/14/2025
Misc
Corrective Action Required
05/14/2025
Maintain overgrown vegetation, being addressed under subd permit.
Footing Inspection - Residential Passed 5/22/2025 5/22/2025 05/22/2025
Underslab Plumbing Inspection - Residential Passed 6/3/2025 6/3/2025 06/03/2025
All Rough Inspection - Residential Failed 7/11/2025 7/11/2025 07/11/2025
Misc
Corrective Action Required
07/11/2025
PORTAL FRAME ONLY - EXTIERIOR SHEETING OK TO COVER ON PFH
Sewer Service Inspection - R Passed 8/5/2025 8/5/2025 08/05/2025
Water Service Inspection - R Passed 8/7/2025 8/7/2025 08/07/2025
All Rough Inspection - Residential Not Ready 8/13/2025 8/13/2025 08/13/2025
Misc
Corrective Action Required
07/11/2025
PORTAL FRAME ONLY - EXTIERIOR SHEETING OK TO COVER ON PFH
Misc
Corrective Action Required
08/13/2025
No city stamped plans on site inspection denied
All Rough Inspection - Residential Failed 8/14/2025 8/14/2025 08/14/2025
Misc
Resolved
08/14/2025
PORTAL FRAME ONLY - EXTIERIOR SHEETING OK TO COVER ON PFH
Misc
Resolved
08/14/2025
No city stamped plans on site inspection denied
Misc
Corrective Action Required
08/14/2025
-provide HVAC outlet within 25’ of outside equipment -main disconnect breaker not setting correctly due to tension from feeder cable -seal multiple penetrations at top plate and exterior wall in foyer near main disconnect -bond boxes at garage and front porch -protect all wires within 6’ of attic access -missing protection for dwv 2” below and above plates at top and bottom on mechanical rooms already drywall -Provide nail plates at primary bedroom N wall -address exterior wall studs over board for dwv in primary bath -seal top plate penetration at laundry/kitchen -missing windows at SW corner
Electrical Service Inspection Failed 8/14/2025 8/14/2025 08/14/2025
Misc
Corrective Action Required
08/14/2025
-main disconnect breaker not setting correctly due to tension from feeder cable (Check bend radius)
All Rough Inspection - Residential Failed 8/19/2025 8/19/2025 08/19/2025
Misc
Corrective Action Required
08/14/2025
-main disconnect breaker not setting correctly due to tension from feeder cable -bonding screw for all metallic boxes to be compliant with 250.126 of NEC -protect all wires within 6’ of attic -address exterior wall studs over board for dwv in primary bath (missing nailes in stud shoe) -truss plans do not match garage trusses doubled -
All Rough Inspection - Residential Failed 8/22/2025 8/22/2025 08/22/2025
Misc
Corrective Action Required
08/19/2025
-main disconnect breaker not setting correctly due to tension from feeder cable -bonding screw for all metallic boxes to be compliant with 250.126 of NEC -uncover covered from porch for viewing hold downs -no more than 2 NM through top plate penetrations check throughout -ufer ground connection to remain accessible
All Rough Inspection - Residential Passed 8/26/2025 8/26/2025 08/26/2025
Misc
Resolved
08/26/2025
-main disconnect breaker not setting correctly due to tension from feeder cable -bonding screw for all metallic boxes to be compliant with 250.126 of NEC -uncover covered from porch for viewing hold downs -no more than 2 NM through top plate penetrations check throughout -ufer ground connection to remain accessible
Electrical Service Inspection Passed 8/26/2025 8/26/2025 08/26/2025
Misc
Resolved
08/26/2025
-main disconnect breaker not setting correctly due to tension from feeder cable (Check bend radius)
Miscellaneous Inspection Failed 9/9/2025 9/9/2025 09/09/2025
Misc
Corrective Action Required
09/09/2025
-No plans on site to verify gb bracing locations. -ensure all panel edges are nailed to code
Miscellaneous Inspection Passed 9/12/2025 9/12/2025 09/12/2025
Misc
Resolved
09/12/2025
-No plans on site to verify gb bracing locations. -ensure all panel edges are nailed to code
Driveway Inspection Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Informational
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring.
Driveway Inspection Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Informational
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring. 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees .
Driveway Inspection Passed 1/22/2026 1/22/2026 01/22/2026
Misc
Informational
01/05/2026
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring. 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . 1-22-26 Dustin a, dw has been poured to city specs
Sidewalk Inspection Partial 01/22/2026
Misc
Corrective Action Required
01/22/2026
1-22-26 Dustin A, SW has been formed and compacted approved to pour
Sidewalk Inspection Passed 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
01/22/2026
1-22-26 Dustin A, SW has been formed and compacted approved to pour 2-5-26 Dustin A, Sw has been poured to city specs
Erosion Control Inspection Residential Failed 02/05/2026
Misc
Corrective Action Required
05/14/2025
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/05/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Failed 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
02/05/2026
628 -final grade -sod -splash blocks to extend 36” from foundation -seal all exterior penetrations and gaps -provide access to ufer ground connection -laundry outlet to be GFCI protected -provide lock out for all hardwired appliances not in view of panel -afci protection missing for multiple circuits (laundry,fridge,microwave,smokes) -uncover ufer connection -A/c condenser not set (30 amp breaker in panel) remove electrical whip until condenser installed -land sewer tracer wire -provide floodlight at rear per Lees Summit chapter 7 security code
Erosion Control Inspection Residential Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Corrective Action Required
02/05/2026
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/05/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-9-26 Dustin A, corrections made
Plot Plan Inspection Passed 02/11/2026
Occupancy Inspection - Codes Residential Failed 2/11/2026 2/11/2026 02/11/2026
Misc
Corrective Action Required
02/05/2026
628 -final grade -sod -splash blocks to extend 36” from foundation -A/c condenser breaker exceeds max breaker size for unit -land sewer tracer wire
Occupancy Inspection - Codes Residential Ready for Temp CO 2/12/2026 2/12/2026 02/12/2026
Misc
Corrective Action Required
02/11/2026
-final grade -sod
Documents & Images
Date Uploaded File Type Document Name
01/06/2025 Application Form G Permit Application Signed
01/06/2025 Application Form G Tax application
02/21/2025 Approved Plans Approved Final Grading Plan Lots 1 -12 Reserve at Blackwell
03/31/2025 Plans 21075_Blackwell Reserve_Bldg G CDs_250312
04/03/2025 Receipt Receipt for transaction:2025-002030
04/18/2025 Approved Plans APPROVED G PLANS
04/18/2025 Letter DS Building Permit
05/14/2025 Letter INSPECTION SUMMARY
05/20/2025 25-0227_23090 Blackwell_Struct_Rev#3 (Footing Changes)
05/20/2025 25-0227_Reunion at Blackwell_Struct_Rev#3 Narrative (Footing Change)
05/22/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/07/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/19/2025 Building G Roof Truss (1)
08/19/2025 Building G truss seals
08/19/2025 Letter INSPECTION SUMMARY
08/22/2025 QU03298_RESERVE BLDG G ALTERNATIVE LAYOUT_07302025 (1)
08/22/2025 QLT QU03298_RESERVE BLDG G ALTERNATIVE LAYOUT_07302025 MO 8 (1)
08/22/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
09/09/2025 Letter INSPECTION SUMMARY
09/11/2025 Building G ALTERNATIVE SEALS_07302025 MO 8
09/12/2025 Letter INSPECTION SUMMARY
10/29/2025 Approved Plans Approved trusses G
11/17/2025 Approved Plans Truss repair doc
12/30/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/27/2026 Receipt Receipt for transaction:2026-000528
02/05/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/06/2026 Engineer Report/Study Stand engineering Structural letter for Reserve buildings
02/09/2026 Letter INSPECTION SUMMARY
02/11/2026 Letter INSPECTION SUMMARY
02/11/2026 Letter INSPECTION SUMMARY
02/12/2026 Letter INSPECTION SUMMARY
02/12/2026 Certificate/License Codes Temporary Certificate of Occupancy
02/12/2026 Receipt Receipt for transaction:2026-000841
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home