Permit Application Status

PRRES20245956


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245956
Building Permit - Residential
Issued
DJ23 INVESTMENTS LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT BASEMENT. UNCOVERED DECK. ROOF TRUSSES - DEFERRED.
11/13/2024
11/22/2024
05/14/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
DJ23 INVESTMENTS LLC, Address:7200 W 132ND ST  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
CARUTHERS ELECTRICAL LLC, Address:30905 E TRUMAN RD, Phone:(816) 508-9050  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DOUG@APGKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 11/22/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 11/22/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 11/22/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/22/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 11/22/2024
9110078-Valuation Fee New Single Family $1,578.34 $1,578.34 Paid 11/22/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 03/17/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Miscellaneous Correction
Informational
02/11/2025
Full erosion control measures are in place at the time of inspection
All Rough Inspection - Residential Pending
Misc
Informational
04/04/2025
- Plans need to be revised to state "not intended for garage" or labeled " future craft area" If at a basement finish permit is obtained at a later date and the area is sectioned offit will need to be protected as a garage. Ok to insulate
Sidewalk Inspection Pending
Misc
Informational
04/18/2025
4-18-25 Dustin A, sw is not ready on this lot
Driveway Inspection Pending
Misc
Informational
04/23/2025
4-18-25 Dustin A, dw is formed and compacted . Approved to pour 4-23-25 Dustin A, Dw is poured to city specs, cannot pass until forms are poured.
Erosion Control Inspection Residential Partial 1/3/2025 01/03/2025
Miscellaneous Correction
Informational
01/03/2025
Erosion control is in place at the time of inspection
Footing Inspection - Residential Failed 1/3/2025 01/03/2025
Miscellaneous Correction
Corrective Action Required
01/03/2025
Footing passed by a third party Footing inspection failed due to no address posted on the property
Sewer Service Inspection - R Passed 1/23/2025 1/23/2025 01/23/2025
Water Service Inspection - R Passed 1/24/2025 1/24/2025 01/24/2025
Footing Inspection - Residential Passed 1/30/2025 01/30/2025
Miscellaneous Correction
Resolved
01/30/2025
Footing passed by a third party Footing inspection failed due to no address posted on the property
Erosion Control Inspection Residential Failed 1/30/2025 01/30/2025
Miscellaneous Correction
Resolved
01/30/2025
Erosion control is in place at the time of inspection
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post street address - Gravel filter needs to be extended to reach the foundation - Install erosion control measures around stock pile of soil in the lot next door
Underslab Plumbing Inspection - Residential Failed 1/30/2025 1/30/2025 01/30/2025
Miscellaneous Correction
Corrective Action Required
01/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post street address - Gravel filter needs to be extended to reach the foundation - Install erosion control measures around stock pile of soil in the lot next door Reschedule underslab inspection after the above corrections have been made
Erosion Control Inspection Residential Partial 2/4/2025 02/04/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/04/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post street address - Gravel filter needs to be extended to reach the foundation - Install erosion control measures around stock pile of soil in the lot next door
Miscellaneous Correction
Informational
02/04/2025
Full erosion control measures are in place at the time of inspection
Underslab Plumbing Inspection - Residential Passed 2/5/2025 02/05/2025
Miscellaneous Correction
Resolved
02/05/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post street address - Gravel filter needs to be extended to reach the foundation - Install erosion control measures around stock pile of soil in the lot next door Reschedule underslab inspection after the above corrections have been made
Erosion Control Inspection Residential Partial 2/11/2025 2/11/2025 02/11/2025
Miscellaneous Correction
Informational
02/04/2025
Full erosion control measures are in place at the time of inspection
All Rough Inspection - Residential Not Ready 2/11/2025 2/11/2025 02/11/2025
Miscellaneous Correction
Corrective Action Required
02/11/2025
Garage framing has not been started, so a garage PFH inspection could not be conducted Not ready for inspection Please walk your property before scheduling inspections
All Rough Inspection - Residential Failed 2/26/2025 2/26/2025 02/26/2025
Miscellaneous Correction
Resolved
02/26/2025
Garage framing has not been started, so a garage PFH inspection could not be conducted Not ready for inspection Please walk your property before scheduling inspections
Miscellaneous Correction
Corrective Action Required
02/26/2025
Exterioior garage PFH sheating is not nailed to the upper most top plate acording to plans page S530
All Rough Inspection - Residential Failed 3/4/2025 3/4/2025 03/04/2025
Miscellaneous Correction
Resolved
03/04/2025
Exterioior garage PFH sheating is not nailed to the upper most top plate acording to plans page S530
Miscellaneous Correction
Informational
03/04/2025
Exterior garage PFH sheathing passed and is okay to cover This is a partial pass only
All Rough Inspection - Residential Failed 3/28/2025 3/28/2025 03/28/2025
Miscellaneous Correction
Resolved
03/28/2025
Exterior garage PFH sheathing passed and is okay to cover This is a partial pass only
Misc
Corrective Action Required
03/28/2025
1916 sw hightown - Nail off girder trusses through out - Provide anchor bolts at breaks within 12 inches of end. in garage - Minimum of 3 studs at exterior corners in single bay garage - Nail off exterior corner studs throughout - Bedroom 3 fire block return air space penetration - Complete nailing of stud shoes in master bedroom exterior load bearing wall - Missing hanger master closet - Anchor all steel columns in basement - Provide anchor bolts with in 12” of plate breaks in basement - Address over notched double joists at basement near sump - Basement anchor bolts to be in middle third of plate - Update plans and submit for review the change of garage door in basement instead of 5 foot sliding door, load calls. Etc
Electrical Service Inspection Failed 3/28/2025 3/28/2025 03/28/2025
Misc
Corrective Action Required
03/28/2025
Incomplete
Gas Service Inspection - Residential Passed 3/28/2025 3/28/2025 03/28/2025
All Rough Inspection - Residential Failed 4/2/2025 4/2/2025 04/02/2025
Misc
Informational
04/02/2025
- Still have no recieved info on if any fire protection is requred for garage door in basement. Ok to insulate
Electrical Service Inspection Failed 4/3/2025 4/3/2025 04/03/2025
Misc
Resolved
04/03/2025
Incomplete
Misc
Corrective Action Required
04/03/2025
- REMOVE GREEN BONDINING SCREW FROM SUB PANEL IN BASEMENT.
All Rough Inspection - Residential Failed 4/4/2025 04/04/2025
Misc
Informational
04/02/2025
- Plans need to be revised to state "not intended for garage" or labeled " future craft area" If at a basement finish permit is obtained at a later date and the area is sectioned offit will need to be protected as a garage. Ok to insulate
Electrical Service Inspection Passed 4/4/2025 4/4/2025 04/04/2025
Misc
Resolved
04/04/2025
Driveway Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, dw is formed and compacted . Approved to pour
Sidewalk Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, sw is not ready on this lot
Driveway Inspection Partial 4/23/2025 4/23/2025 04/23/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, dw is formed and compacted . Approved to pour 4-23-25 Dustin A, Dw is poured to city specs, cannot pass until forms are poured.
Documents & Images
Date Uploaded File Type Document Name
11/13/2024 Avalon - Contemporary Layout GL
11/13/2024 RS 114 Permit Application Signed
11/13/2024 RS 114 Tax application
11/15/2024 Permit Codes Residential Plan Review
11/15/2024 Approved Plans APPROVED PLANS
11/19/2024 Plot Plan APPROVED PLOT PLAN
11/19/2024 Permit Codes Residential Plan Review
11/22/2024 Permit DS Building Permit
11/22/2024 Receipt Receipt for transaction:2024-009118
12/23/2024 Approved Plans 12-23-24 APPROVED PLANS
01/03/2025 114 Reserve at Stoney Creek - FTG-signed-stamped
01/03/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
02/05/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
03/04/2025 Letter INSPECTION SUMMARY
03/17/2025 Receipt Receipt for transaction:2025-001612
03/26/2025 114 RS - GT Letter - 250319
03/28/2025 Approved Plans APPROVED TRUSS PACKAGE
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Approved Plans APPROVED TRUSS LAYOUT
04/02/2025 114 Reserve at Stoney Creek- Drill floor joist field issue- stamped
04/02/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/10/2025 Approved Plans APPROVED REVISED PLANS
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home