Permit Application Status

PRRES20245022


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245022
Building Permit - Residential
Temporary Occupancy
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT -
09/23/2024
09/24/2024
03/23/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 09/24/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/24/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 09/24/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 09/24/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 09/24/2024
9110078-Valuation Fee New Single Family $1,442.42 $1,442.42 Paid 09/24/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/01/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/01/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/14/2025
2-26-25 Dustin A, Storm inlet and curb line needs cleaned of mud and silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/14/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Pending 5/31/2025
Misc
Corrective Action Required
05/01/2025
Home locked no entry. 03/28/25 -sod -provide as graded plot plan prior to sod -splash blocks and sump pump discharge to extend 36” from foundation -meter pit missing gravel -provide as graded plot plan -seal top of A/c disconnect
Footing Inspection - Residential Passed 10/14/2024 10/14/2024 10/14/2024
Erosion Control Inspection Residential Failed 10/23/2024 10/23/2024 10/23/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/23/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -REMOVE GRAVEL FROM STREET -SPREAD GRAVEL FILTER AT ENTRANCE
Sewer Service Inspection - R Passed 10/29/2024 10/29/2024 10/29/2024
Water Service Inspection - R Passed 10/31/2024 10/31/2024 10/31/2024
Underslab Plumbing Inspection - Residential Passed 11/1/2024 11/1/2024 11/01/2024
All Rough Inspection - Residential Failed 12/3/2024 12/3/2024 12/03/2024
Misc
Corrective Action Required
12/03/2024
PORTAL FRAME AND PORCH ONLY APPROVED
All Rough Inspection - Residential Failed 1/10/2025 1/10/2025 01/10/2025
Misc
Resolved
01/10/2025
PORTAL FRAME AND PORCH ONLY APPROVED
Misc
Corrective Action Required
01/10/2025
- Provide security blocking at front door - Provide lateral support for gable truss A5
Electrical Service Inspection Passed 1/10/2025 1/10/2025 01/10/2025
Gas Service Inspection - Residential Passed 1/10/2025 1/10/2025 01/10/2025
All Rough Inspection - Residential Passed 1/13/2025 1/13/2025 01/13/2025
Misc
Resolved
01/13/2025
- Provide security blocking at front door - Provide lateral support for gable truss A5
Driveway Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, DW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour
Miscellaneous Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, curb is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour
Sidewalk Inspection Partial 2/14/2025 2/14/2025 02/14/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, SW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour. There was 2 panels that were cracked due to a machine driving over it. Possibly from gas company. Informed contractor that needed to be replaced as well
Erosion Control Inspection Residential Failed 2/26/2025 2/26/2025 02/26/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/23/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -REMOVE GRAVEL FROM STREET -SPREAD GRAVEL FILTER AT ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/26/2025
2-26-25 Dustin A, Storm inlet and curb line needs cleaned of mud and silt. No erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Partial 2/26/2025 2/26/2025 02/26/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, DW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour 2-26-25 Dustin A, DW is poured to city specs and slopes are in compliance. cannot pass until forms pulled
Miscellaneous Inspection Partial 2/27/2025 2/27/2025 02/26/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, curb is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour 2-26-25 Dustin A, Curb is poured to city specs. Cannot pass until forms pulled
Sidewalk Inspection Partial 02/26/2025
Misc
Informational
02/14/2025
2-14-25 Dustin A, SW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour. There was 2 panels that were cracked due to a machine driving over it. Possibly from gas company. Informed contractor that needed to be replaced as well 2-26-25 Dustin A, SW is poured and slopes are in compliance. Cannot pass until forms pulled
Driveway Inspection Passed 03/14/2025
Misc
Informational
02/26/2025
2-14-25 Dustin A, DW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour 2-26-25 Dustin A, DW is poured to city specs and slopes are in compliance. cannot pass until forms pulled
Sidewalk Inspection Passed 03/14/2025
Misc
Informational
02/26/2025
2-14-25 Dustin A, SW is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour. There was 2 panels that were cracked due to a machine driving over it. Possibly from gas company. Informed contractor that needed to be replaced as well 2-26-25 Dustin A, SW is poured and slopes are in compliance. Cannot pass until forms pulled
Occupancy Inspection - Codes Residential Failed 3/14/2025 3/14/2025 03/14/2025
Misc
Corrective Action Required
03/14/2025
-sod -provide as graded plot plan prior to sod -splash blocks and sump pump discharge to extend 36” from foundation -meter pit missing gravel -meter pit lid broken -provide as graded plot plan -missing afci protection at fireplace circuit in living room -open junction box under entry bathroom in basement -seal top of A/c disconnect
Erosion Control Inspection Residential Failed 03/14/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
03/14/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -REMOVE GRAVEL FROM STREET -SPREAD GRAVEL FILTER AT ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/26/2025
2-26-25 Dustin A, Storm inlet and curb line needs cleaned of mud and silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/14/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Miscellaneous Inspection Passed 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
02/26/2025
2-14-25 Dustin A, curb is formed and compacted. Informed contractor that cannot pour until its above freezing, They moved pour back few hours to meet temp. Approved to pour 2-26-25 Dustin A, Curb is poured to city specs. Cannot pass until forms pulled 3-14-24 Dustin A, forms were pulled
Occupancy Inspection - Codes Residential Failed 3/28/2025 3/28/2025 03/28/2025
Misc
Corrective Action Required
03/14/2025
Home locked no entry. 03/28/25 -sod -provide as graded plot plan prior to sod -splash blocks and sump pump discharge to extend 36” from foundation -meter pit missing gravel -meter pit lid broken -provide as graded plot plan -missing afci protection at fireplace circuit in living rooma -open junction box under entry bathroom in basement -seal top of A/c disconnect
Occupancy Inspection - Codes Residential Ready for Temp CO 3/31/2025 3/31/2025 03/31/2025
Misc
Corrective Action Required
03/28/2025
Home locked no entry. 03/28/25 -sod -provide as graded plot plan prior to sod -splash blocks and sump pump discharge to extend 36” from foundation -meter pit missing gravel -provide as graded plot plan -seal top of A/c disconnect
Occupancy Inspection - Codes Residential Ready for Temp CO 5/1/2025 05/01/2025
Misc
Corrective Action Required
03/31/2025
Home locked no entry. 03/28/25 -sod -provide as graded plot plan prior to sod -splash blocks and sump pump discharge to extend 36” from foundation -meter pit missing gravel -provide as graded plot plan -seal top of A/c disconnect
Documents & Images
Date Uploaded File Type Document Name
09/23/2024 Application Form HT #202 - PERMIT APP
09/24/2024 Permit Codes Residential Plan Review
09/24/2024 Approved Plans APPROVED PLANS
09/24/2024 Approved Plans APPROVED TRUSS LAYOUT
09/24/2024 Approved Plans APPROVED TRUSS PACKAGE
09/24/2024 Permit Codes Residential Plan Review
09/24/2024 Plot Plan APPROVED PLOT PLAN
09/24/2024 Permit DS Building Permit
09/24/2024 Receipt Receipt for transaction:2024-007889
10/10/2024 M L Crose 1613 SW Buckhorn St LSMO Foundation Footing Inspection Report 10-9-24
10/14/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
01/10/2025 Letter INSPECTION SUMMARY
01/10/2025 Letter INSPECTION SUMMARY
01/10/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/01/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/01/2025 Receipt Receipt for transaction:2025-001940
04/23/2025 TCO EXTENSION
05/01/2025 Letter INSPECTION SUMMARY
05/01/2025 Certificate/License Codes Temporary Certificate of Occupancy
05/01/2025 Receipt Receipt for transaction:2025-002749
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home