PRRES20244575
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED DECK - ROOF TRUSSES STOP WORK ORDER generated on 10/30/2024 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 10/30/2024 12:00 AM by username 'Shawn Hoffman'.
08/27/2024
08/29/2024
05/05/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/29/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/29/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 08/29/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/29/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/29/2024
9110078-Valuation Fee New Single Family $1,742.74 $1,742.74 Paid 08/29/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 03/24/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/28/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 10/17/2024 10/17/2024
Misc
Corrective Action Required
10/17/2024
- CLEAN OUT DEBRIS FROM STORM INLET AT FRONT OF LOT. - REMOVE GRAVEL FROM STREET
Footing Inspection - Residential Passed 10/17/2024 10/17/2024
Misc
Informational
10/17/2024
- INSPECTION PERFORMED BY THIRD PARTY.
Water Service Inspection - R Passed 10/28/2024 10/28/2024 10/28/2024
Sewer Service Inspection - R Passed 10/28/2024 10/28/2024 10/28/2024
Underslab Plumbing Inspection - Residential Failed - Stop Work 10/30/2024 10/30/2024 10/30/2024
Corrective Action Required
10/30/2024
- NO INSPECTION REPORT FOR PIERS
Underslab Plumbing Inspection - Residential Passed 10/31/2024 10/30/2024 10/30/2024
Piers/Caissons Inspection - Residential Passed 10/30/2024 10/30/2024
Misc
Informational
10/30/2024
PIERS INSPECTED BY THIRD PARTY THIS INCLUDES 2 PIERS FOR DECK.
All Rough Inspection - Residential Failed 11/18/2024 11/18/2024 11/18/2024
Misc
Corrective Action Required
11/18/2024
- Garage poral ok - Porch roof missing hold down devices on trusses
All Rough Inspection - Residential Not Ready 12/12/2024 12/12/2024 12/12/2024
Misc
Corrective Action Required
11/18/2024
- Garage poral ok - Porch roof missing hold down devices on trusses
Misc
Corrective Action Required
12/12/2024
-clean all gravel out of the street . -No plans on site -no plate straps, missing plumbing support, missing fire blocking throughout, no inspection
Erosion Control Inspection Residential Failed 12/12/2024 12/12/2024
Misc
Corrective Action Required
10/17/2024
- CLEAN OUT DEBRIS FROM STORM INLET AT FRONT OF LOT. - REMOVE GRAVEL FROM STREET--- -- same as before no change
Erosion Control Inspection Residential Failed 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
- CLEAN OUT DEBRIS FROM STORM INLET AT FRONT OF LOT. - REMOVE GRAVEL FROM STREET--- -- same as before no change
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/17/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. = REMOVE GRAVEL AT CURB - REMOVE LOOSE TRASH FROM LOT
All Rough Inspection - Residential Failed 12/17/2024 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
- Garage poral ok - Porch roof missing hold down devices on trusses
Misc
Resolved
12/17/2024
-clean all gravel out of the street . -No plans on site -no plate straps, missing plumbing support, missing fire blocking throughout, no inspection
Misc
Corrective Action Required
12/17/2024
- Strap top plate of load bearing wall where DWV has over bored plate garage/ bathroom - Fire block top plate of HVAC chase in pantry - Fire block top of chase at dining/ great room - Fire block top of chase at north West corner of great room - Fire block top of chase at north east corner of flex room - Window at landing next to front door to be tempered - Nail double girder truss in primary bedroom to manufacture specifications -
Electrical Service Inspection Passed 12/17/2024 12/17/2024 12/17/2024
Gas Service Inspection - Residential Passed 12/17/2024 12/17/2024 12/17/2024
All Rough Inspection - Residential Passed 12/20/2024 12/20/2024 12/20/2024
Misc
Resolved
12/20/2024
- Strap top plate of load bearing wall where DWV has over bored plate garage/ bathroom - Fire block top plate of HVAC chase in pantry - Fire block top of chase at dining/ great room - Fire block top of chase at north West corner of great room - Fire block top of chase at north east corner of flex room - Window at landing next to front door to be tempered - Nail double girder truss in primary bedroom to manufacture specifications -
Erosion Control Inspection Residential Partial 12/20/2024 12/20/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
12/20/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. = REMOVE GRAVEL AT CURB - REMOVE LOOSE TRASH FROM LOT
Misc
Corrective Action Required
12/20/2024
Erosion control in place at time of inspection.
Erosion Control Inspection Residential Failed 1/2/2025 01/02/2025
Misc
Resolved
01/02/2025
Erosion control in place at time of inspection.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
01/02/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
All Rough Inspection - Residential Passed 1/2/2025 1/2/2025 01/02/2025
Misc
Informational
01/02/2025
ENGINEERS CORRECTIONS COMPLETED
Driveway Inspection Partial 3/19/2025 3/19/2025 03/19/2025
Misc
Informational
03/19/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow.
Driveway Inspection Partial 3/19/2025 3/19/2025 03/19/2025
Misc
Informational
03/19/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow. 3-19-25 DP DW is formed, aggregate compacted. Starting to rain so will need to call be in for day its being poured.
Driveway Inspection Partial 3/19/2025 3/19/2025 03/19/2025
Misc
Informational
03/19/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow. 3-19-25 DP DW is formed, aggregate compacted. Starting to rain so will need to call be in for day its being poured. 3-19-25 DP. Contractor removed curb. Aggregate is compacted in curb, dowels are in place. It is starting to rain so will need to call back in for an inspection on day they are going to pour.
Driveway Inspection Partial 3/20/2025 3/20/2025 03/20/2025
Misc
Informational
03/19/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow. 3-19-25 DP DW is formed, aggregate compacted. Starting to rain so will need to call be in for day its being poured. 3-19-25 DP. Contractor removed curb. Aggregate is compacted in curb, dowels are in place. It is starting to rain so will need to call back in for an inspection on day they are going to pour. 3-20-25 DP. Contractor needs to pour the curb before the DW approach. Approved to pour curb.
Driveway Inspection Partial 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
03/20/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow. 3-19-25 DP DW is formed, aggregate compacted. Starting to rain so will need to call be in for day its being poured. 3-19-25 DP. Contractor removed curb. Aggregate is compacted in curb, dowels are in place. It is starting to rain so will need to call back in for an inspection on day they are going to pour. 3-20-25 DP. Contractor needs to pour the curb before the DW approach. Approved to pour curb. 3-21-25 DP. DW is formed, aggregate compacted, approved to pour.
Driveway Inspection Passed 3/24/2025 3/24/2025 03/24/2025
Misc
Informational
03/21/2025
3-19-25 DP. DW is being poured tomorrow. Contractor is calling this back in due to incoming rain/snow. 3-19-25 DP DW is formed, aggregate compacted. Starting to rain so will need to call be in for day its being poured. 3-19-25 DP. Contractor removed curb. Aggregate is compacted in curb, dowels are in place. It is starting to rain so will need to call back in for an inspection on day they are going to pour. 3-20-25 DP. Contractor needs to pour the curb before the DW approach. Approved to pour curb. 3-21-25 DP. DW is formed, aggregate compacted, approved to pour. 3-24-25 DP. DW is poured, forms have been removed. Passed
Sidewalk Inspection Partial 3/24/2025 3/24/2025 03/24/2025
Misc
Corrective Action Required
03/24/2025
3-24-25 DP. Sidewalk on west side of property has a sidewalk panel that is broken in half around a manhole. Since this sidewalk is on the plot plan, this will need to be replaced. Please call back in for a pre pour inspection. This property is still able to get TCO with the sidewalk the way it is but will need to be fixed before receiving full Occupancy.
Plot Plan Inspection Passed 3/25/2025 03/25/2025
Erosion Control Inspection Residential Partial 3/25/2025 03/25/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
03/25/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Miscellaneous Correction
Corrective Action Required
03/25/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPRCTION
Occupancy Inspection - Codes Residential Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
- Driveway and sidewalk inspection pending - Provide Final grading and sod - sump discharge to be 36” away from foundation Provide splash - Provide splash pads - Land sew trace wire at grade - Provide security screws at exterior doors
Occupancy Inspection - Codes Residential Ready for Temp CO 3/27/2025 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/25/2025
- Driveway and sidewalk inspection pending - Provide Final grading and sod - sump discharge to be 36” away from foundation Provide splash - Provide splash pads - Land sew trace wire at grade - Provide security screws at exterior doors
Erosion Control Inspection Residential Passed 4/29/2025 04/29/2025
Miscellaneous Correction
Resolved
04/29/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPRCTION
Occupancy Inspection - Codes Residential Failed 4/29/2025 04/29/2025
Misc
Corrective Action Required
03/27/2025
- sidewalk inspection pending
Sidewalk Inspection Partial 4/30/2025 4/30/2025 04/30/2025
Misc
Corrective Action Required
04/30/2025
4-30-25 DP. Contractor replaced 1 panel around a manhole lid that was cracked. Just need to remove the forms and this can be passed.
Sidewalk Inspection Passed 5/5/2025 05/05/2025
Misc
Corrective Action Required
04/30/2025
3-24-25 DP. Sidewalk on west side of property has a sidewalk panel that is broken in half around a manhole. Since this sidewalk is on the plot plan, this will need to be replaced. Please call back in for a pre pour inspection. This property is still able to get TCO with the sidewalk the way it is but will need to be fixed before receiving full Occupancy. 5-5-25 DP. SW has been fixed. Passed
Occupancy Inspection - Codes Residential Full C of O 5/5/2025 5/5/2025 05/05/2025
Misc
Resolved
05/05/2025
- sidewalk inspection pending
Documents & Images
Date Uploaded File Type Document Name
08/27/2024 HM #155 - PERMIT APP
08/29/2024 Approved Plans APPROVED PLANS
08/29/2024 Plot Plan APPROVED PLOT PLAN
08/29/2024 Approved Plans APPROVED TRUSS LAYOUT
08/29/2024 Approved Plans APPROVED TRUSS PACKAGE
08/29/2024 Permit Codes Residential Plan Review
08/29/2024 Permit DS Building Permit
08/29/2024 Receipt Receipt for transaction:2024-007330
10/16/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter Stop Work Order
10/30/2024 155 Highland Meadows - Drilled Pier INSP-signed-stamped
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/27/2024 Approved Plans APPROVED REVISED PLANS
12/27/2024 Approved Plans APPROVED TRUSS LAYOUT
01/02/2025 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Receipt Receipt for transaction:2025-001732
03/24/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/28/2025 Receipt Receipt for transaction:2025-001872
04/29/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter Codes Final Certificate of Occupancy
05/05/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home