PRRES20242124
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. ENGINEERED FLOOR SYSTEM - DEFERRED.
04/29/2024
05/09/2024
10/30/2024
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
JORDAN@JFECONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/09/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/09/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/09/2024
9110078-Valuation Fee New Single Family $1,671.27 $1,671.27 Paid 05/09/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
Misc
Informational
01/09/2025
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
Driveway Inspection Pending
Misc
Informational
04/09/2025
4-9-25 NS Site visited and it appears that driveway meets city standards for pre-pour inspection. No sidewalk. I will come out to do my final inspection when rough inspection is requested.
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
04/16/2025
**INSTALL EROSION CONTROL ALONG THE CREEK AT REAR -Driveway not approved on record -Piers not inspected and approved by city. Submit inspection record from 3rd party -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Complete installation of floor receptacles -Isolate low voltage in fireplace switch box -Provide gfci protection for dishwasher outlet. Not tripping -Install deck receptacle weatherproof cover -Screw the exterior door embedded jamb brace into studs through the 4 pre-drilled holes; screw the security strike plate to the embedded jamb brace -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections -Cover insulation paper facing with approved material -Support mineral wool with metal support wire -The water heater P&T discharge pipe must be no lower than 1.5” from floor -Fb floor space from mechanical room -Install light cover in basement bedroom and closet
Erosion Control Inspection Residential Partial 7/15/2024 07/15/2024
Misc
Informational
07/15/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Footing Inspection - Residential Passed 07/15/2024
Informational
07/15/2024
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Partial 7/29/2024 07/29/2024
Misc
Informational
07/15/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Sewer Service Inspection - R Passed 7/29/2024 07/29/2024
Underslab Plumbing Inspection - Residential Passed 9/11/2024 9/11/2024 09/11/2024
Erosion Control Inspection Residential Partial 9/11/2024 09/11/2024
Misc
Informational
07/29/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Underslab Electrical Inspection - Residential Passed 9/12/2024 9/12/2024 09/12/2024
Erosion Control Inspection Residential Partial 10/3/2024 10/03/2024
Misc
Informational
09/11/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 10/3/2024 10/3/2024 10/03/2024
Misc
Corrective Action Required
10/03/2024
Garage PFH and rear CSPF walls nailing-OK
Electrical Service Inspection Passed 1/9/2025 1/9/2025 01/09/2025
Gas Service Inspection - Residential Failed 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/09/2025
Provide min 10 psi pressure for testing
Erosion Control Inspection Residential Partial 1/9/2025 01/09/2025
Misc
Informational
10/03/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
Gas Service Inspection - Residential Failed 1/13/2025 1/13/2025 01/13/2025
Misc
Corrective Action Required
01/09/2025
Provide min 10 psi pressure for testing
All Rough Inspection - Residential Failed 1/13/2025 1/13/2025 01/13/2025
Misc
Corrective Action Required
10/03/2024
-Protect plumbing in master bathroom -Fb wall at refrigerator -Install straps at rear dining CSPF walls per plan -Complete kitchen hood exhaust duct installation -Each combustion air opening must be minimum 100 sq inches of clear area -Anchor basement sill plate within 12” of break (near bedroom 4 window) -Fb wall at wet bar from soffit/joist space; fb wall space adjacent to basement bath tub from joist space -Install/restore EBk1/blockings per plan -Gas test fails **Ok TO INSULATE
All Rough Inspection - Residential Passed 1/21/2025 1/21/2025 01/21/2025
Misc
Resolved
01/21/2025
-Protect plumbing in master bathroom -Fb wall at refrigerator -Install straps at rear dining CSPF walls per plan -Complete kitchen hood exhaust duct installation -Each combustion air opening must be minimum 100 sq inches of clear area -Anchor basement sill plate within 12” of break (near bedroom 4 window) -Fb wall at wet bar from soffit/joist space; fb wall space adjacent to basement bath tub from joist space -Install/restore EBk1/blockings per plan -Gas test fails **Ok TO INSULATE
Gas Service Inspection - Residential Passed 1/21/2025 1/21/2025 01/21/2025
Misc
Resolved
01/21/2025
Provide min 10 psi pressure for testing
Driveway Inspection Partial 4/9/2025 4/9/2025 04/09/2025
Misc
Informational
04/09/2025
4-9-25 NS Site visited and it appears that driveway meets city standards for pre-pour inspection. No sidewalk. I will come out to do my final inspection when rough inspection is requested.
Occupancy Inspection - Codes Residential Failed 4/16/2025 4/16/2025 04/16/2025
Misc
Corrective Action Required
04/16/2025
**INSTALL EROSION CONTROL ALONG THE CREEK AT REAR -Driveway not approved on record -Piers not inspected and approved by city. Submit inspection record from 3rd party -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Complete installation of floor receptacles -Isolate low voltage in fireplace switch box -Provide gfci protection for dishwasher outlet. Not tripping -Install deck receptacle weatherproof cover -Screw the exterior door embedded jamb brace into studs through the 4 pre-drilled holes; screw the security strike plate to the embedded jamb brace -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections -Cover insulation paper facing with approved material -Support mineral wool with metal support wire -The water heater P&T discharge pipe must be no lower than 1.5” from floor -Fb floor space from mechanical room -Install light cover in basement bedroom and closet
Documents & Images
Date Uploaded File Type Document Name
04/29/2024 WO16 - Permit App
04/29/2024 WO16 - Tac App
05/03/2024 Permit Codes Residential Plan Review
05/09/2024 Plot Plan APPROVED PLOT PLAN
05/09/2024 Approved Plans APPROVED PLANS
05/09/2024 Permit Codes Residential Plan Review
05/09/2024 Permit DS Building Permit
05/09/2024 Receipt Receipt for transaction:2024-003215
07/15/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/19/2024 Approved Plans APPROVED JOIST PACKAGE
09/11/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/13/2024 3RD Party Insp Report THIRD PARTY SLAB INSPECTION
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home