CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED DECK. ROOF TRUSSES. STOP WORK ORDER generated on 04/25/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/25/2024 12:00 AM by username 'Dustin Agcopra'.
01/17/2024
01/26/2024
07/17/2024
08/26/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JASONH@CLOVERANDHIVE.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 01/26/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 01/26/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 01/26/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/26/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 01/26/2024
9110078-Valuation Fee New Single Family $1,472.04 $1,472.04 Paid 01/26/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 06/21/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 2/15/2024 02/15/2024
Miscellaneous Correction
Corrective Action Required
02/15/2024
Excavated dirt on to lot to the west needs to have erosion control installed.
Footing Inspection - Residential Failed 2/15/2024 02/15/2024
Miscellaneous Correction
Corrective Action Required
02/15/2024
Excavated dirt on to the lot to the west needs to have erosion control installed before footing inspection will be passed. Okay to pour footing.
Underslab Plumbing Inspection - Residential Passed 3/1/2024 3/1/2024 03/01/2024
Erosion Control Inspection Residential Failed 3/5/2024 03/05/2024
Miscellaneous Correction
Corrective Action Required
02/15/2024
Excavated dirt on to lot to the west needs to have erosion control installed.
Miscellaneous Correction
Corrective Action Required
03/05/2024
-Excavated dirt put on lot 1800 SW Hightown and lot dirt has encroached and entered the city storm water drain along the North/West corner. - Storm water drain needs to be cleaned out and proper erosion control must be completed Stop work order will be issued in three days if proper erosion control measures are not installed 03/05/24 KBEARD
Sewer Service Inspection - R Passed 3/20/2024 3/20/2024 03/20/2024
Water Service Inspection - R Partial 3/20/2024 03/20/2024
Miscellaneous Correction
Informational
03/20/2024
PEX has been run out from foundation about 15 feet. Meter has not been set. Ok to cover. This is a partial pass only
Water Service Inspection - R Passed 3/21/2024 3/21/2024 03/21/2024
Miscellaneous Correction
Informational
03/20/2024
PEX has been run out from foundation about 15 feet. Meter has not been set. Ok to cover. This is a partial pass only
Erosion Control Inspection Residential Failed 3/27/2024 03/27/2024
Miscellaneous Correction
Resolved
03/20/2024
Excavated dirt on to lot to the west needs to have erosion control installed.
Miscellaneous Correction
Resolved
03/20/2024
-Excavated dirt put on lot 1800 SW Hightown and lot dirt has encroached and entered the city storm water drain along the North/West corner. - Storm water drain needs to be cleaned out and proper erosion control must be completed Stop work order will be issued in three days if proper erosion control measures are not installed 03/05/24 KBEARD
Miscellaneous Correction
Corrective Action Required
03/27/2024
-Some silt fence has been damaged or is missing and gravel pile in the driveway needs to be spread. -Full erosion control must be installed and maintained until CofO -No further inspections until full compliance of erosion control
Footing Inspection - Residential Passed 4/17/2024 04/17/2024
Miscellaneous Correction
Resolved
04/17/2024
Excavated dirt on to the lot to the west needs to have erosion control installed before footing inspection will be passed. Okay to pour footing.
All Rough Inspection - Residential Failed 4/17/2024 4/17/2024 04/17/2024
Miscellaneous Correction
Corrective Action Required
04/17/2024
1712 SW Hightown. All rough -Provide information on garage CS-PF straps (Table R602.10.6.4, tension strap capacity) -Garage anchor bolts must be in the middle 1/3 of sole plate -Garage door triple sole plate needs to be tied down using anchor bolts -One garage anchor needs a bolt installed 3rd car garage roof truss to girder truss needs joist hangers installed -Install LIB’s on 45 degree angles or according to plan -Fire block top plate in garage to stairwell -Fire block top plate in garage to entry -Roof vent pipe boots are missing -Top of chase for radon and heater vent can not be of 1/2 inch plywood (R302.11.1) -Fire blocking for ceiling of fireplace cannot be 1/2 inch plywood (R302.11.1) -Ceiling fire blocking in chase at front bedroom can not be of 1/2 inch plywood (R302.11.1) -Vertically fire block basement northwest corner -Nail jack stud to jack stud along east side of basement triple window -Vertically fire block the northwest corner of the basement’s north bedroom -Fire block above the Ibeam in the basement bathroom above the tub -ALL TOP PLATE fire blocking in basement CAN NOT be of 1/2 plywood (R302.11.1) -ALL FIRE BLOCKING MATERIAL IN FURRED DOWN WALLS CEILING TO CEILING can not be of 1/2 and 3/8 inch plywood (R302.11.1) -Air vent in basement south bedroom needs to be fully opened or per manufacturer’s installation recommendation -Electrical ground for panel to ground rod is not connected -Back deck post to beam is not connected using through bolts
Gas Service Inspection - Residential Passed 4/17/2024 4/17/2024 04/17/2024
Electrical Service Inspection Failed 4/17/2024 4/17/2024 04/17/2024
Miscellaneous Correction
Corrective Action Required
04/17/2024
Electrical ground for panel to ground rod is not connected
Erosion Control Inspection Residential Partial 4/17/2024 04/17/2024
Miscellaneous Correction
Resolved
04/17/2024
-Some silt fence has been damaged or is missing and gravel pile in the driveway needs to be spread. -Full erosion control must be installed and maintained until CofO -No further inspections until full compliance of erosion control
Miscellaneous Correction
Informational
04/17/2024
Full erosion control is in place and must be maintained until CofO
Electrical Service Inspection Failed 4/23/2024 4/23/2024 04/23/2024
Miscellaneous Correction
Resolved
04/23/2024
Electrical ground for panel to ground rod is not connected
Miscellaneous Correction
Corrective Action Required
04/23/2024
Second inspection Electrical ground for panel to ground rod is not connected
Electrical Service Inspection Passed 4/23/2024 04/23/2024
Miscellaneous Correction
Resolved
04/23/2024
Second inspection Electrical ground for panel to ground rod is not connected
All Rough Inspection - Residential Failed 4/23/2024 4/23/2024 04/23/2024
Miscellaneous Correction
Corrective Action Required
04/17/2024
1712 SW Hightown. All rough -Provide information on garage CS-PF straps (Table R602.10.6.4, tension strap capacity) -Garage anchor bolts must be in the middle 1/3 of sole plate -Garage door triple sole plate needs to be tied down using anchor bolts -One garage anchor needs a bolt installed 3rd car garage roof truss to girder truss needs joist hangers installed -Install LIB’s on 45 degree angles or according to plan -Fire block top plate in garage to stairwell -Fire block top plate in garage to entry -Roof vent pipe boots are missing -Top of chase for radon and heater vent can not be of 1/2 inch plywood (R302.11.1) -Fire blocking for ceiling of fireplace cannot be 1/2 inch plywood (R302.11.1) -Ceiling fire blocking in chase at front bedroom can not be of 1/2 inch plywood (R302.11.1) -Vertically fire block basement northwest corner -Nail jack stud to jack stud along east side of basement triple window -Vertically fire block the northwest corner of the basement’s north bedroom -Fire block above the Ibeam in the basement bathroom above the tub -ALL TOP PLATE fire blocking in basement CAN NOT be of 1/2 plywood (R302.11.1) -ALL FIRE BLOCKING MATERIAL IN FURRED DOWN WALLS CEILING TO CEILING can not be of 1/2 and 3/8 inch plywood (R302.11.1) -Air vent in basement south bedroom needs to be fully opened or per manufacturer’s installation recommendation -Electrical ground for panel to ground rod is not connected -Back deck post to beam is not connected using through bolts
Miscellaneous Correction
Corrective Action Required
04/23/2024
1712 SW Hightown. All rough (2) • •One garage anchor needs a bolt installed •Install LIB’s on 45 degree angles or according to plan (LIB in garage N/E corner does not attach to bottom plate where anchor bolts are installed) (LIB in entry does not attach to the top plate) •Fire block top plate in garage to stairwell •Fire block top plate in garage to entry •Roof vent pipe boots are missing •Air vent in basement south bedroom needs to be fully opened or per manufacturer’s installation recommendation •Electrical ground for panel to ground rod is not connected
All Rough Inspection - Residential Passed 4/24/2024 4/24/2024 04/24/2024
Miscellaneous Correction
Resolved
04/24/2024
1712 SW Hightown. All rough -Provide information on garage CS-PF straps (Table R602.10.6.4, tension strap capacity) -Garage anchor bolts must be in the middle 1/3 of sole plate -Garage door triple sole plate needs to be tied down using anchor bolts -One garage anchor needs a bolt installed 3rd car garage roof truss to girder truss needs joist hangers installed -Install LIB’s on 45 degree angles or according to plan -Fire block top plate in garage to stairwell -Fire block top plate in garage to entry -Roof vent pipe boots are missing -Top of chase for radon and heater vent can not be of 1/2 inch plywood (R302.11.1) -Fire blocking for ceiling of fireplace cannot be 1/2 inch plywood (R302.11.1) -Ceiling fire blocking in chase at front bedroom can not be of 1/2 inch plywood (R302.11.1) -Vertically fire block basement northwest corner -Nail jack stud to jack stud along east side of basement triple window -Vertically fire block the northwest corner of the basement’s north bedroom -Fire block above the Ibeam in the basement bathroom above the tub -ALL TOP PLATE fire blocking in basement CAN NOT be of 1/2 plywood (R302.11.1) -ALL FIRE BLOCKING MATERIAL IN FURRED DOWN WALLS CEILING TO CEILING can not be of 1/2 and 3/8 inch plywood (R302.11.1) -Air vent in basement south bedroom needs to be fully opened or per manufacturer’s installation recommendation -Electrical ground for panel to ground rod is not connected -Back deck post to beam is not connected using through bolts
Miscellaneous Correction
Resolved
04/24/2024
1712 SW Hightown. All rough (2) • •One garage anchor needs a bolt installed •Install LIB’s on 45 degree angles or according to plan (LIB in garage N/E corner does not attach to bottom plate where anchor bolts are installed) (LIB in entry does not attach to the top plate) •Fire block top plate in garage to stairwell •Fire block top plate in garage to entry •Roof vent pipe boots are missing •Air vent in basement south bedroom needs to be fully opened or per manufacturer’s installation recommendation •Electrical ground for panel to ground rod is not connected
Erosion Control Inspection Residential Passed 04/25/2024
Miscellaneous Correction
Informational
04/17/2024
Full erosion control is in place and must be maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/25/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Driveway Inspection Partial 4/29/2024 4/29/2024 04/29/2024
Misc
Informational
04/29/2024
4-29-24 PS Driveway approach pre pour, forms in place and aggregate compacted, approved to pour
Sidewalk Inspection Partial 5/21/2024 5/21/2024 05/21/2024
Misc
Informational
05/21/2024
5-21-24 Dustin A, SW has been formed and compacted to city specs. Approved to pour.
Sidewalk Inspection Passed 5/28/2024 5/28/2024 05/28/2024
Misc
Informational
05/28/2024
5-28-24 Dustin A, Sw has been poured to city specs. Passed
Erosion Control Inspection Residential Partial 06/10/2024
Miscellaneous Correction
Informational
04/25/2024
Full erosion control is in place and must be maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/25/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/10/2024
6-10-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Street needs to be cleaned. Restroom needs to be moved off of public sidewalk onto green space.
Erosion Control Inspection Residential Passed 6/13/2024 6/13/2024 06/13/2024
Miscellaneous Correction
Informational
06/10/2024
Full erosion control is in place and must be maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/10/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/10/2024
6-10-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Street needs to be cleaned. Restroom needs to be moved off of public sidewalk onto green space. 6-13-24 Dustin A, Restroom has been moved off public Sw Passed
Driveway Inspection Passed 6/14/2024 6/14/2024 06/14/2024
Misc
Informational
04/29/2024
4-29-24 PS Driveway approach pre pour, forms in place and aggregate compacted, approved to pour 6-14-24 PS Driveway approach meets LS specs
Erosion Control Inspection Residential Failed 6/14/2024 6/14/2024 06/14/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/14/2024
6/14/24 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Not Ready 6/14/2024 6/14/2024 06/14/2024
Misc
Corrective Action Required
06/14/2024
House not ready for occupancy inspection. List is incomplete -Provide erosion control before any further inspections -Missing all cover plates at kitchen -Missing cover plates in living room -Missing spark rings at switches in kitchen -Missing deck landing -Missing hammer arrestors -Missing primary and secondary latch at sliding glass door
Plot Plan Inspection Passed 6/19/2024 06/19/2024
Erosion Control Inspection Residential Partial 6/19/2024 06/19/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/19/2024
6/14/24 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Miscellaneous Correction
Informational
06/19/2024
Full erosion control is in place and must be maintained until CofO
Occupancy Inspection - Codes Residential Failed 6/19/2024 6/19/2024 06/19/2024
Misc
Resolved
06/19/2024
House not ready for occupancy inspection. List is incomplete -Provide erosion control before any further inspections -Missing all cover plates at kitchen -Missing cover plates in living room -Missing spark rings at switches in kitchen -Missing deck landing -Missing hammer arrestors -Missing primary and secondary latch at sliding glass door
Miscellaneous Correction
Corrective Action Required
06/19/2024
1712 SW Hightown. Occupancy (2) -Remove detector dust covers in the primary bedroom and basement mechanical room -Provide spark rings for kitchen backsplash light switches -Fire block all openings in garage sheet rock -Sod, splash pads and sump pump extension are not installed -Seal front exterior lighting
Occupancy Inspection - Codes Residential Failed 6/21/2024 6/21/2024 06/21/2024
Miscellaneous Correction
Corrective Action Required
06/19/2024
1712 SW Hightown. Occupancy (3) -Sod, splash pads and sump pump extension are not installed -Pay $75 fee associated with this permit
Occupancy Inspection - Codes Residential Ready for Temp CO 8/14/2024 08/14/2024
Miscellaneous Correction
Resolved
08/14/2024
1712 SW Hightown. Occupancy (3) -Sod, splash pads and sump pump extension are not installed -Pay $75 fee associated with this permit
Miscellaneous Correction
Corrective Action Required
08/14/2024
Sod, splash pads and sump pump extension are not installed -Pay $75 fee associated with this permit
Erosion Control Inspection Residential Partial 8/16/2024 08/16/2024
Miscellaneous Correction
Resolved
08/16/2024
Full erosion control is in place and must be maintained until CofO
Miscellaneous Correction
Informational
08/16/2024
erosion control is in place and must be maintained until CofO
Occupancy Inspection - Codes Residential Ready for Temp CO 8/19/2024 08/19/2024
Miscellaneous Correction
Corrective Action Required
08/14/2024
Sod, splash pads and sump pump extension are not installed
Miscellaneous Correction
Corrective Action Required
08/19/2024
Sod, sump pump extensions and splash pads are not installed Builder sent in a TCO extension form
Erosion Control Inspection Residential Passed 8/26/2024 08/26/2024
Miscellaneous Correction
Resolved
08/26/2024
erosion control is in place and must be maintained until CofO
Occupancy Inspection - Codes Residential Full C of O 8/26/2024 8/26/2024 08/26/2024
Miscellaneous Correction
Corrective Action Required
08/19/2024
Sod, splash pads and sump pump extension are not installed
Miscellaneous Correction
Resolved
08/26/2024
Sod, sump pump extensions and splash pads are not installed Builder sent in a TCO extension form
Documents & Images
Date Uploaded File Type Document Name
01/17/2024 RR # 96 - PERMIT APP
01/17/2024 RR # 96 - TRUSS DETAILS
01/17/2024 RR # 96 - TRUSS LAYOUT
01/19/2024 Approved Plans APPROVED PLANS
01/19/2024 Permit Codes Residential Plan Review
01/26/2024 Plot Plan APPROVED PLOT PLAN
01/26/2024 Permit Codes Residential Plan Review
01/26/2024 Permit DS Building Permit
01/26/2024 Receipt Receipt for transaction:2024-000412
02/15/2024 Letter INSPECTION SUMMARY
02/15/2024 Letter INSPECTION SUMMARY
03/05/2024 Letter INSPECTION SUMMARY
03/05/2024 Letter INSPECTION SUMMARY
03/05/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/17/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter Stop Work Order
04/25/2024 Letter Stop Work Order
04/25/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
05/21/2024 Letter INSPECTION SUMMARY
05/28/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/10/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/21/2024 Letter INSPECTION SUMMARY
06/21/2024 Receipt Receipt for transaction:2024-005015
08/14/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/19/2024 RR #96 - TCO Extension
08/19/2024 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2024 Receipt Receipt for transaction:2024-006977
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2024 Receipt Receipt for transaction:2024-006995
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter Field Certificate of Occupancy
08/26/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home