Permit Application Status

PRRES20232860


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20232860
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
06/19/2023
06/22/2023
11/28/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
  
  
  
  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 06/22/2023
Right of Way Permit Fee $85.00 $85.00 Paid 06/22/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/22/2023
Water Tap Fee $3,730.00 $3,730.00 Paid 06/22/2023
Water Meter Fee $550.50 $550.50 Paid 06/22/2023
Valuation Fee New Single Family $1,657.58 $1,657.58 Paid 06/22/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/29/2023 (11:00) 6/29/2023 06/29/2023
Misc
Informational
06/29/2023
UFER located on south East garage wall
Sewer Service Inspection - R Passed 7/19/2023 7/19/2023 07/19/2023
Underslab Plumbing Inspection - Residential Failed 7/19/2023 7/19/2023 07/19/2023
Misc
Corrective Action Required
07/19/2023
Grinder pump to be placed in permanent location
Water Service Inspection - R Passed 7/19/2023 (1:00) 7/19/2023 07/19/2023
Underslab Plumbing Inspection - Residential Passed 7/20/2023 7/20/2023 07/20/2023
Misc
Resolved
07/20/2023
Grinder pump to be placed in permanent location
Erosion Control Inspection Residential Failed 7/20/2023 7/20/2023 07/20/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/20/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/20/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Electrical Service Inspection Passed 9/5/2023 09/05/2023
Gas Service Inspection - Residential Failed 9/5/2023 09/05/2023
Misc
Corrective Action Required
09/05/2023
- No pressure at gauge
Erosion Control Inspection Residential Failed 9/5/2023 09/05/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/20/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/20/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Misc
Corrective Action Required
09/05/2023
- repair silt fence - remove gavel and debris from street - clean storm inlet - re-establish gravel filter at curb
All Rough Inspection - Residential Failed 9/5/2023 9/5/2023 09/05/2023
Misc
Corrective Action Required
09/05/2023
- Fir out post garage - Fire block ends of soffit in garage - Unable to inspect deck roof, provide access - Unable to inspect framing of front porch, make accessible - Provide 1” clearance for B- vent in upstairs chase - Anchor double girder at bedroom 1 and Bvent, both must be anchored - Anchor steel columns in basement - Header cut joists at furnace - Correct erosion control - No pressure on gas line
All Rough Inspection - Residential Passed 9/11/2023 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
- Fir out post garage - Fire block ends of soffit in garage - Unable to inspect deck roof, provide access - Unable to inspect framing of front porch, make accessible - Provide 1” clearance for B- vent in upstairs chase - Anchor double girder at bedroom 1 and Bvent, both must be anchored - Anchor steel columns in basement - Header cut joists at furnace - Correct erosion control - No pressure on gas line
Gas Service Inspection - Residential Passed 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
- No pressure at gauge
Driveway Inspection Partial 9/21/2023 9/21/2023 09/21/2023
Misc
Informational
09/21/2023
9-21-23 A.A, DW is formed. Aggregate is compacted. Depths are in compliance .
Driveway Inspection Passed 9/28/2023 9/28/2023 09/28/2023
Misc
Informational
09/21/2023
9-21-23 A.A, DW is formed. Aggregate is compacted. Depths are in compliance . 9-28-23 D.A DW is poured. Frames are pulled. Passed
Plot Plan Inspection Passed 11/22/2023
Occupancy Inspection - Codes Residential Failed 11/22/2023 11/22/2023 11/22/2023
Misc
Corrective Action Required
11/22/2023
Water anti syphon device installed with set screw sheered off.
Occupancy Inspection - Codes Residential Full C of O 11/28/2023 11/28/2023 11/28/2023
Misc
Resolved
11/28/2023
Documents & Images
Date Uploaded File Type Document Name
06/19/2023 H4 #113 - Winfield - Farmhouse - Sheets
06/19/2023 113 HAWTHORNE RIDGE 1ST FLOOR LAYOUT
06/19/2023 113 HAWTHORNE RIDGE 2ND FLOOR LAYOUT
06/19/2023 H4 #113 - TRUSS DETAILS
06/19/2023 LOT 113 FINAL NEW
06/19/2023 H4 #113 - PERMIT APP
06/22/2023 Approved Plans APPROVED 1ST FLOOR TRUSS LAYOUT
06/22/2023 Approved Plans APPROVED 2ND FLOOR TRUSS LAYOUT
06/22/2023 Approved Plans APPROVED PLANS
06/22/2023 Plot Plan approved plot plan
06/22/2023 Approved Plans APPROVED TRUSS PACKAGE
06/22/2023 Permit Codes Residential Plan Review
06/22/2023 Permit DS Building Permit
06/22/2023 Receipt Receipt for transaction:2023-004739
06/29/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/28/2023 Letter INSPECTION SUMMARY
11/17/2023 H4 #113 - Permit Extension
11/22/2023 Letter INSPECTION SUMMARY
11/22/2023 Letter INSPECTION SUMMARY
11/28/2023 Letter Field Certificate of Occupancy
11/28/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home