Permit Application Status

PRRES20223227


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20223227
Building Permit - Residential
Certificate of Occupancy
NLV PERGOLA PARK LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED PATIO
07/12/2022
07/19/2022
01/09/2023
12/22/2023
Locations
Contacts
LANDROCK SIGNATURE HOMES LLC, Address:4335 MCGEE ST, Phone:(816) 863-5588  
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
JP Roberts, Address:4335 McGee St  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,356.34 $1,356.34 Paid 07/19/2022
$1,022.72
Right of Way Permit Fee $85.00 $85.00 Paid 07/19/2022
Residential Excise Tax Fee $1,022.72 $0.00 Paid 07/13/2022
Water Tap Fee $3,730.00 $3,730.00 Paid 07/19/2022
Water Meter Fee $550.50 $550.50 Paid 07/19/2022
Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 07/19/2022
New Longview Road and Bridge Escrow $1,022.72 $1,022.72 Paid 07/19/2022
Temporary Occupancy Fee $50.00 $50.00 Paid 08/11/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 08/08/2022
Misc
Informational
08/08/2022
COMPLETED BY THIRD PARTY EVERSTEAD BRADLEY HUXOL
Underslab Plumbing Inspection - Residential Passed 9/1/2022 9/1/2022 09/01/2022
Erosion Control Inspection Residential Failed 9/1/2022 09/01/2022
Miscellaneous Correction
Corrective Action Required
09/01/2022
- repair silt fence at front of lot. - clean debris from street
Erosion Control Inspection Residential Failed 9/30/2022 09/30/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
09/01/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 10/5/2022 10/05/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
09/30/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Informational
10/05/2022
CONTACTED JP ROBERTS, HE SAID HE WOULD TAKE CARE OF THIS BY 10/6/22 Shawn Hoffman 10/05/2022 9:34 AM
Erosion Control Inspection Residential Failed 10/7/2022 10/07/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/05/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Informational
10/05/2022
CONTACTED JP ROBERTS, HE SAID HE WOULD TAKE CARE OF THIS BY 10/6/22 Shawn Hoffman 10/05/2022 9:34 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/07/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 10/25/2022 10/25/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/07/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Informational
10/07/2022
CONTACTED JP ROBERTS, HE SAID HE WOULD TAKE CARE OF THIS BY 10/6/22 Shawn Hoffman 10/05/2022 9:34 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/07/2022
EROSION CONTROL REQUIRED. STOP WORK ORDER IS THE NEXT STEP.
Sewer Service Inspection - R Passed 12/8/2022 (1:00) 12/8/2022 12/08/2022
Water Service Inspection - R Partial 12/8/2022 (1:00) 12/8/2022 12/08/2022
Misc
Informational
12/08/2022
pex only
Water Service Inspection - R Passed 12/9/2022 (1:00) 12/9/2022 12/09/2022
Misc
Resolved
12/09/2022
All Rough Inspection - Residential Failed 1/5/2023 1/5/2023 01/05/2023
Misc
Corrective Action Required
01/05/2023
Portal frame only - anchorage to sill plate incomplete - 1000 lb. Straps are required and at least 12” on to king studs OK to cover outside
Erosion Control Inspection Residential Failed 3/10/2023 03/10/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
03/10/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Resolved
03/10/2023
CONTACTED JP ROBERTS, HE SAID HE WOULD TAKE CARE OF THIS BY 10/6/22 Shawn Hoffman 10/05/2022 9:34 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/25/2022
- Remove construction debris and trash from lot
Erosion Control Inspection Residential Failed 3/22/2023 03/22/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/10/2023
- Remove construction debris and trash from lot
Electrical Service Inspection Passed 4/6/2023 4/6/2023 04/06/2023
Gas Service Inspection - Residential Passed 4/6/2023 4/6/2023 04/06/2023
All Rough Inspection - Residential Failed 4/6/2023 4/6/2023 04/06/2023
Misc
Corrective Action Required
01/05/2023
- address triple LVL by entry hanger placement - Db fur down and stud space at kitchen wall - Provide anchor bolts at plate break garage - Install 2” washer and nut at garage PFH - Nail exterior corner to code - Complete ductwork for bathroom vent upstairs - Complete laundry vent to outside OK to insulate
All Rough Inspection - Residential Failed 4/11/2023 4/11/2023 04/11/2023
Misc
Corrective Action Required
04/06/2023
- Install 2” washer and nut at garage PFH (ensure anchor bolt in the middle 1/3 of sill plate)
All Rough Inspection - Residential Passed 4/14/2023 4/14/2023 04/14/2023
Misc
Resolved
04/14/2023
Sidewalk Inspection Partial 4/18/2023 4/18/2023 04/18/2023
Misc
Informational
04/18/2023
4-18-23 DP. Crew formed up sidewalk, aggregate was compacted, cross slopes in compliance but conditions can change. approved to pour.
Sidewalk Inspection Partial 4/25/2023 4/25/2023 04/20/2023
Misc
Informational
04/20/2023
4-25-23 DP SW was formed, aggregate compacted, cross slopes in compliance but conditions can change. approved to pour
Erosion Control Inspection Residential Failed 8/10/2023 08/10/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/10/2023
- Remove construction debris and trash from lot
Misc
Corrective Action Required
08/10/2023
- provide erosion control at front of lot until sod is installed
Occupancy Inspection - Codes Residential Failed 8/10/2023 8/10/2023 08/10/2023
Misc
Corrective Action Required
08/10/2023
- sidewalk inspection pending - Final grading and sod - Provide splash pads 26” away from foundation - Seal all exterior penetrations - Seal top of electrical meter can and A/C disconnect - Sump discharge shall be 36” away from foundation - Paint gas exterior piping - Provide anti siphon device on spigot at water main
Occupancy Inspection - Codes Residential Ready for Temp CO 8/11/2023 8/11/2023 08/11/2023
Misc
Corrective Action Required
08/10/2023
- sidewalk inspection pending - Final grading and sod - Provide splash pads 26” away from foundation - Seal all exterior penetrations - Seal top of electrical meter can and A/C disconnect - Sump discharge shall be 36” away from foundation - Paint gas exterior piping TCO expiration 9/11/23
Erosion Control Inspection Residential Failed 8/11/2023 08/11/2023
Misc
Resolved
08/11/2023
- provide erosion control at front of lot until sod is installed
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/11/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Silt fence needs to be dug in.
Plot Plan Inspection Passed 10/11/2023 10/11/2023
Erosion Control Inspection Residential Passed 10/11/2023 10/11/2023
DCM2 ESC DEFICIENT INSTALLATION
Resolved
10/11/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Silt fence needs to be dug in.
Occupancy Inspection - Codes Residential Failed 9/10/2023 10/11/2023
Misc
Corrective Action Required
08/11/2023
- sidewalk inspection pending TCO expiration 9/11/23
Sidewalk Inspection Passed 12/22/2023 12/22/2023 12/22/2023
Misc
Informational
04/20/2023
4-18-23 DP. Crew formed up sidewalk, aggregate was compacted, cross slopes in compliance but conditions can change. approved to pour. 12-22-23 DP SW was poured, cross slopes in compliance passed
Occupancy Inspection - Codes Residential Full C of O 12/22/2023 12/22/2023 12/22/2023
Misc
Resolved
12/22/2023
Documents & Images
Date Uploaded File Type Document Name
07/12/2022 1028 SW Armie St_ Building Application
07/12/2022 1028 SW Armie St_ Excise Tax Application
07/13/2022 Permit Codes Residential Plan Review
07/19/2022 Approved Plans Approved Drawings
07/19/2022 Plot Plan Approved Plot Plan
07/19/2022 Permit Codes Residential Plan Review
07/19/2022 Permit DS Building Permit
07/19/2022 Receipt Receipt for transaction:2022-005871
08/07/2022 92 Pergola Park FTNG
08/08/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/30/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/09/2022 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/11/2023 Certificate/License Codes Temporary Certificate of Occupancy
08/11/2023 Receipt Receipt for transaction:2023-006227
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
12/22/2023 Letter INSPECTION SUMMARY
12/22/2023 Letter Field Certificate of Occupancy
12/22/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home