Summary
PRRES20222996
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
06/29/2022
08/05/2022
01/01/2023
08/15/2023
Locations
Contacts
KC CUSTOM HOMES, Address:406 NW DONOVAN RD, Phone:(816) 564-5149  
Steve Froehlich, Address:406 NW Donovan Rd  
STEVE@KC-CUSTOMHOMES.COM  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
THE SOLAR GUYS, Address:6114 MO-9 HWY STE C1, Phone:(913) 424-2112  
ONE HOUR HEATING & AIR CONDITIONING, Address:712 SW BLUE PKWY, Unit A, Phone:(816) 524-2121  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $85.00 $85.00 Paid 08/05/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/05/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 08/05/2022
Water Meter Fee $479.24 $479.24 Paid 08/05/2022
Valuation Fee New Single Family $1,656.09 $1,656.09 Paid 08/05/2022
$1,892.67
8331507-Sewer Connection Fee $0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/11/2022 08/11/2022
Misc
Informational
08/11/2022
UFER 2 FOOT NORTH ON WEST BASEMENT WALL
Underslab Plumbing Inspection - Residential Passed 9/13/2022 9/13/2022 09/13/2022
Erosion Control Inspection Residential Failed 9/13/2022 09/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - MAINTAIN SILT FENCE -
Piers/Caissons Inspection - Residential Passed 9/22/2022 09/22/2022
Misc
Informational
09/22/2022
3rd party by APEX (3) 24 X 36 PIERS
All Rough Inspection - Residential Failed 2/16/2023 2/16/2023 02/16/2023
Misc
Corrective Action Required
02/16/2023
**2/16/23 INSPECTION DENIED POST ADDRESS, INSTALL DOORS
Gas Service Inspection - Residential Failed 2/16/2023 2/16/2023 02/16/2023
Misc
Corrective Action Required
02/16/2023
INSPECTION DENIED -POST ADDRESS
Electrical Service Inspection Failed 2/16/2023 02/16/2023
Misc
Corrective Action Required
02/16/2023
INSPECTION DENIED -POST ADDRESS
All Rough Inspection - Residential Failed 2/22/2023 2/22/2023 02/22/2023
Misc
Corrective Action Required
02/16/2023
-Address no suspended slab inspection of file -Install entry door and back door -Complete exterior nailing pattern at PFH-eyebrow will also need removed to nail header -Seal plate penetrations in garage -Fur down for insulation at hvac -Seal penetrations and gaps in ceiling line fireblocking in garage -Seal fireblocking in both hvac chases -Anchor bolts to be in middle third of plate in garage -(9) studs required at main beam in garage -Strap both sides of top plate lapped less than 24” near beam/dining -Load bearing stud notched greater than 25% near SE garage -Seal plate and through floor penetrations at shower seat/garage -Address holes bored closer than 2” together and closer than 2” from bottom of joist at pex lines in garage and dining -Nail rafter to joist connections per code -Complete blocking for lateral restraint above load bearing wall at owner’s entry -Seal through floor and 3” plate penetration in bath near bed 5 -(3) stud pack required under each end of I beam in bed 5 -Complete blocking of cantilevered joists at bed 5 -Seal plate and floor penetrations in kitchen/bed 5 sill plate -Pex lines bored too close to bottom of joists and closer than 2” in bed 5 -Address no bearing for joists in pantry, and joist cut short of bearing -Seal bottom plate plate penetrations in pantry -Missing joist hangers at pantry/ kitchen -Provide bearing for deck beam in 2x6 wall-one side only 1 trimmer, other side has none -Beams for deck to be (2) 2x12 per plan -Expose lVl ridge beam and connections at covered deck for inspection -(2) trimmers and (3) king studs per plan under (3) 2x12 header at SGD -Studs in both 2x6 walls to be 12” oc -Solid block and nail horizontal seams in exterior sheathing -Land electrical at book cases by fireplace -Complete gas Pilar FP-CSST in not allowed through fp enclosure -Seal top plate penetration in 2x6?wall by stairs -Provide snow blocking at roof line above fireplace -(3) stud pack required at great room/ hallway in line with steel beam -Seal penetration at 2x6 wall near entry door -Midpoint strap 2” dwv at entry -Support notched sub floor under bath above dining -Fireblock tub trap above dining -(3) king studs per plan at entry door -(3) studs per plan under 16” LVL upstairs hallway/ laundry -Protect pex and nm less than 1.25” to face of framing at bath 2 -Seal top plate penetrations at bed/bath 2 -Secure vertical pex max 48” oc at bath 2 -Have engineer address rafters landing on 2x4s on edge and connections to joists in bed 2 -Support ridge beam above window in bed 2 -Seal bottom plate penetrations in bath 2 -Support ridge beam above window in bed 3 -Fireblock ceiling line bed 3 at window and bed 4 wall and exterior wall -Solid block and nail horizontal seams in bed 4 -Fireblock tub trap bath 3/4 -Seal top plate penetration bed 4 by bed 3 -Address joists landing on non load bearing wall in laundry/ master wall -Missing hangers by entry to master/ laundry -(3) studs under each side of lvl in master per plan -Solid block and nail seams at master -Provide hanger at joist cut for attic access -Address joists and roof loads bearing on non bearing walls in master bath and walk in closet -Missing hangers in master bath -Provide lateral restraint for LVL upset for roof loads in master -Protect dryer duct 2” below plate line in master -Seal stud penetration in return air stud cavity in master -Seal bottom plate penetration at stairwell/ dining -Fireblock top of fur out walls at basement landing and vertical 10’ oc max -Joist hangers at joists to stair header -Light switch required at top and bottom of stairs for stair lighting -Anchor steel column bases -Missing all hangers at (3) 2x10 Missing stud packs in exterior walls at stairwell per plan -Provide (3) studs at exterior corners in basement per code -Provide anchor bolts at end of plates at SGDand return walls -Overnotched stud at exterior wall by electrical panel -Identify ground conductor at sub panel -Seal space from basement to garage near HVAC -Secure water service line -No pressure on gas, bond metallic gas piping -Address deck post to beam connections -Provide hanger at end joust to ledger
Gas Service Inspection - Residential Failed 2/22/2023 02/22/2023
Misc
Corrective Action Required
02/16/2023
Bond gas line, perform pressure test
Electrical Service Inspection Passed 02/22/2023
Misc
Resolved
02/22/2023
All Rough Inspection - Residential Failed 3/14/2023 3/14/2023 03/14/2023
Misc
Corrective Action Required
03/14/2023
-Address no suspended slab inspection of file -Install entry door and back door -Complete exterior nailing pattern at PFH-eyebrow will also need removed to nail header -Seal plate penetrations in garage -Fur down for insulation at hvac -Seal penetrations and gaps in ceiling line fireblocking in garage -Seal fireblocking in both hvac chases -Anchor bolts to be in middle third of plate in garage -(9) studs required at main beam in garage -Strap both sides of top plate lapped less than 24” near beam/dining -Load bearing stud notched greater than 25% near SE garage -Seal plate and through floor penetrations at shower seat/garage -Address holes bored closer than 2” together and closer than 2” from bottom of joist at pex lines in garage and dining -Nail rafter to joist connections per code -Complete blocking for lateral restraint above load bearing wall at owner’s entry -Seal through floor and 3” plate penetration in bath near bed 5 -(3) stud pack required under each end of I beam in bed 5 -Complete blocking of cantilevered joists at bed 5 -Seal plate and floor penetrations in kitchen/bed 5 sill plate -Pex lines bored too close to bottom of joists and closer than 2” in bed 5 -Address no bearing for joists in pantry, and joist cut short of bearing -Seal bottom plate plate penetrations in pantry -Missing joist hangers at pantry/ kitchen -Provide bearing for deck beam in 2x6 wall-one side only 1 trimmer, other side has none -Beams for deck to be (2) 2x12 per plan -Expose lVl ridge beam and connections at covered deck for inspection -(2) trimmers and (3) king studs per plan under (3) 2x12 header at SGD -Studs in both 2x6 walls to be 12” oc -Solid block and nail horizontal seams in exterior sheathing -Land electrical at book cases by fireplace -Complete gas Pilar FP-CSST in not allowed through fp enclosure -Seal top plate penetration in 2x6?wall by stairs -Provide snow blocking at roof line above fireplace -(3) stud pack required at great room/ hallway in line with steel beam -Seal penetration at 2x6 wall near entry door -Midpoint strap 2” dwv at entry -Support notched sub floor under bath above dining -Fireblock tub trap above dining -(3) king studs per plan at entry door -(3) studs per plan under 16” LVL upstairs hallway/ laundry -Protect pex and nm less than 1.25” to face of framing at bath 2 -Seal top plate penetrations at bed/bath 2 -Secure vertical pex max 48” oc at bath 2 -Have engineer address rafters landing on 2x4s on edge and connections to joists in bed 2 -Support ridge beam above window in bed 2 -Seal bottom plate penetrations in bath 2 -Support ridge beam above window in bed 3 -Fireblock ceiling line bed 3 at window and bed 4 wall and exterior wall -Solid block and nail horizontal seams in bed 4 -Fireblock tub trap bath 3/4 -Seal top plate penetration bed 4 by bed 3 -Address joists landing on non load bearing wall in laundry/ master wall -Missing hangers by entry to master/ laundry -(3) studs under each side of lvl in master per plan -Solid block and nail seams at master -Provide hanger at joist cut for attic access -Address joists and roof loads bearing on non bearing walls in master bath and walk in closet -Missing hangers in master bath -Provide lateral restraint for LVL upset for roof loads in master -Protect dryer duct 2” below plate line in master -Seal stud penetration in return air stud cavity in master -Seal bottom plate penetration at stairwell/ dining -Fireblock top of fur out walls at basement landing and vertical 10’ oc max -Joist hangers at joists to stair header -Light switch required at top and bottom of stairs for stair lighting -Anchor steel column bases -Missing all hangers at (3) 2x10 Missing stud packs in exterior walls at stairwell per plan -Provide (3) studs at exterior corners in basement per code -Provide anchor bolts at end of plates at SGDand return walls -Overnotched stud at exterior wall by electrical panel -Identify ground conductor at sub panel -Seal space from basement to garage near HVAC -Secure water service line -No pressure on gas, bond metallic gas piping -Address deck post to beam connections -Provide hanger at end joust to ledger
Misc
Corrective Action Required
03/14/2023
-Install entry door -(9) studs required at main beam in garage (over notched stud) -Load bearing stud notched greater than 25% near SE garage -Seal plate and through floor penetrations at shower seat/garage -Seal through floor and 3” plate penetration in bath near bed 5 -(3) stud pack required under each end of I beam in bed 5 (north end) -Seal plate and floor penetrations in kitchen/bed 5 sill plate -Seal bottom plate plate penetrations in pantry -Provide bearing for deck beam in 2x6 wall-one side only 1 trimmer, other side has none -Beams for deck to be (2) 2x12 per plan -Land electrical at book cases by fireplace -Seal top plate penetration in 2x6?wall by stairs -(3) stud pack required at great room/ hallway at landing -Seal penetration at 2x6 wall near entry door -Support notched sub floor under bath above dining -(3) king studs per plan at entry door -Seal bottom plate penetration at stairwell/ dining -Identify ground conductor at sub panel -Seal space from basement to garage near HVAC -No pressure on gas, bond metallic gas piping -Address deck post to beam connections -electrical hanging at right side of slider -fur out gas line in garage
Gas Service Inspection - Residential Failed 3/14/2023 03/15/2023
Misc
Corrective Action Required
02/22/2023
Bond gas line, perform pressure test was inspected on 03/14/2023
All Rough Inspection - Residential Failed 3/14/2023 03/15/2023
Misc
Resolved
03/15/2023
-Address no suspended slab inspection of file -Install entry door and back door -Complete exterior nailing pattern at PFH-eyebrow will also need removed to nail header -Seal plate penetrations in garage -Fur down for insulation at hvac -Seal penetrations and gaps in ceiling line fireblocking in garage -Seal fireblocking in both hvac chases -Anchor bolts to be in middle third of plate in garage -(9) studs required at main beam in garage -Strap both sides of top plate lapped less than 24” near beam/dining -Load bearing stud notched greater than 25% near SE garage -Seal plate and through floor penetrations at shower seat/garage -Address holes bored closer than 2” together and closer than 2” from bottom of joist at pex lines in garage and dining -Nail rafter to joist connections per code -Complete blocking for lateral restraint above load bearing wall at owner’s entry -Seal through floor and 3” plate penetration in bath near bed 5 -(3) stud pack required under each end of I beam in bed 5 -Complete blocking of cantilevered joists at bed 5 -Seal plate and floor penetrations in kitchen/bed 5 sill plate -Pex lines bored too close to bottom of joists and closer than 2” in bed 5 -Address no bearing for joists in pantry, and joist cut short of bearing -Seal bottom plate plate penetrations in pantry -Missing joist hangers at pantry/ kitchen -Provide bearing for deck beam in 2x6 wall-one side only 1 trimmer, other side has none -Beams for deck to be (2) 2x12 per plan -Expose lVl ridge beam and connections at covered deck for inspection -(2) trimmers and (3) king studs per plan under (3) 2x12 header at SGD -Studs in both 2x6 walls to be 12” oc -Solid block and nail horizontal seams in exterior sheathing -Land electrical at book cases by fireplace -Complete gas Pilar FP-CSST in not allowed through fp enclosure -Seal top plate penetration in 2x6?wall by stairs -Provide snow blocking at roof line above fireplace -(3) stud pack required at great room/ hallway in line with steel beam -Seal penetration at 2x6 wall near entry door -Midpoint strap 2” dwv at entry -Support notched sub floor under bath above dining -Fireblock tub trap above dining -(3) king studs per plan at entry door -(3) studs per plan under 16” LVL upstairs hallway/ laundry -Protect pex and nm less than 1.25” to face of framing at bath 2 -Seal top plate penetrations at bed/bath 2 -Secure vertical pex max 48” oc at bath 2 -Have engineer address rafters landing on 2x4s on edge and connections to joists in bed 2 -Support ridge beam above window in bed 2 -Seal bottom plate penetrations in bath 2 -Support ridge beam above window in bed 3 -Fireblock ceiling line bed 3 at window and bed 4 wall and exterior wall -Solid block and nail horizontal seams in bed 4 -Fireblock tub trap bath 3/4 -Seal top plate penetration bed 4 by bed 3 -Address joists landing on non load bearing wall in laundry/ master wall -Missing hangers by entry to master/ laundry -(3) studs under each side of lvl in master per plan -Solid block and nail seams at master -Provide hanger at joist cut for attic access -Address joists and roof loads bearing on non bearing walls in master bath and walk in closet -Missing hangers in master bath -Provide lateral restraint for LVL upset for roof loads in master -Protect dryer duct 2” below plate line in master -Seal stud penetration in return air stud cavity in master -Seal bottom plate penetration at stairwell/ dining -Fireblock top of fur out walls at basement landing and vertical 10’ oc max -Joist hangers at joists to stair header -Light switch required at top and bottom of stairs for stair lighting -Anchor steel column bases -Missing all hangers at (3) 2x10 Missing stud packs in exterior walls at stairwell per plan -Provide (3) studs at exterior corners in basement per code -Provide anchor bolts at end of plates at SGDand return walls -Overnotched stud at exterior wall by electrical panel -Identify ground conductor at sub panel -Seal space from basement to garage near HVAC -Secure water service line -No pressure on gas, bond metallic gas piping -Address deck post to beam connections -Provide hanger at end joust to ledger
Misc
Corrective Action Required
03/14/2023
corrected list from 3/14 -Install entry door -(9) studs required at main beam in garage (over notched stud) -Load bearing stud notched greater than 25% near SE garage -Seal plate and through floor penetrations at shower seat/garage -Seal through floor and 3” plate penetration in bath near bed 5 -(3) stud pack required under each end of I beam in bed 5 (north end) -Seal plate and floor penetrations in kitchen/bed 5 sill plate -Seal bottom plate plate penetrations in pantry -Provide bearing for deck beam in 2x6 wall-one side only 1 trimmer, other side has none -Beams for deck to be (2) 2x12 per plan -Land electrical at book cases by fireplace -Seal top plate penetration in 2x6?wall by stairs -(3) stud pack required at great room/ hallway at landing -Seal penetration at 2x6 wall near entry door -Support notched sub floor under bath above dining -(3) king studs per plan at entry door -Seal bottom plate penetration at stairwell/ dining -Identify ground conductor at sub panel -Seal space from basement to garage near HVAC -No pressure on gas, bond metallic gas piping -Address deck post to beam connections -electrical hanging at right side of slider -fur out gas line in garage
Gas Service Inspection - Residential Passed 3/17/2023 3/17/2023 03/17/2023
Misc
Resolved
03/17/2023
Bond gas line, perform pressure test was inspected on 03/14/2023
All Rough Inspection - Residential Failed 3/22/2023 3/22/2023 03/22/2023
Misc
Corrective Action Required
03/15/2023
-Install entry door - (over notched stud) -Load bearing stud notched greater than 25% near SE garage -(3) king studs per plan at entry door -Address deck post to beam connections OK to insulate
All Rough Inspection - Residential Passed 3/28/2023 3/28/2023 03/28/2023
Misc
Resolved
03/28/2023
-Install entry door - (over notched stud) -Load bearing stud notched greater than 25% near SE garage -(3) king studs per plan at entry door -Address deck post to beam connections OK to insulate
Sewer Service Inspection - R Passed 4/21/2023 (8:15) 4/21/2023 04/21/2023
Water Service Inspection - R Failed 4/21/2023 (1:00) 4/21/2023 04/21/2023
Misc
Corrective Action Required
04/21/2023
Meter to be 14" to 18" to top pit
Water Service Inspection - R Passed 4/21/2023 4/21/2023 04/21/2023
Misc
Resolved
04/21/2023
Meter to be 14" to 18" to top pit
Driveway Inspection Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/26/2023
4-26-23 DP. Driveway was formed, aggregate compacted. Told to keep cross slopes in compliance. Approved to pour.
Sidewalk Inspection Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/26/2023
4-26-23 DP. Sidewalk was formed, aggregate compacted, cross slopes in compliance but conditions can change. approved to pour
Occupancy Inspection - Codes Residential Temporary C of O 7/26/2023 7/26/2023 07/26/2023
Misc
Resolved
07/26/2023
Plot Plan Inspection Passed 8/15/2023 08/15/2023
Occupancy Inspection - Codes Residential Full C of O 8/15/2023 08/15/2023
Documents & Images
Date Uploaded File Type Document Name
06/30/2022 Permit Application
06/30/2022 Excise Tax Application
07/05/2022 Permit Codes Residential Plan Review
07/18/2022 Approved Plans APPROVED PLANS
07/18/2022 Plot Plan approved plot plan
07/18/2022 Permit Codes Residential Plan Review
08/05/2022 Permit DS Building Permit
08/05/2022 Receipt Receipt for transaction: 2022-006447
08/11/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/21/2022 Final_2022_09_14_DPier_LSMO_Pat Cochran Concrete
09/22/2022 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
03/13/2023 Suspended Garage Slab Engineering Inspection
03/13/2023 Engineering Report Framing Issues
03/15/2023 Letter INSPECTION SUMMARY
03/15/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/27/2023 Revised Apex Framing Report
03/28/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Certificate/License Codes Temporary Certificate of Occupancy
08/15/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter Field Certificate of Occupancy
08/15/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home