Permit Application Status

PRRES20222896


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20222896
Building Permit - Residential
Voided
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - FINISHED AND UNFINISHED BASEMENT -
06/24/2022
12/25/2022
06/28/2022
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
ASHLEY@NEWMARKHOMESKC.COM  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews

There are no reviews for this permit application.

Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
06/24/2022 2022_06_23_22-329 Lot 188 Woodside Ridge_Permit Drawings
06/24/2022 Permit Application
06/28/2022 Plot Plan APPROVED PLOT PLAN
06/28/2022 Permit Codes Residential Plan Review
06/28/2022 2022_06_23_22-328 Lot 180 Woodside Ridge_Permit Drawings
06/28/2022 LOT 180 FINAL
06/28/2022 Permit Application
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home