Summary
PRRES20222753
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
06/20/2022
06/28/2022
07/18/2023
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
CBRUNING@NEWMARKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $510.00 $510.00 Paid 06/28/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 06/28/2022
Water Meter Fee $479.24 $479.24 Paid 06/28/2022
Right of Way Permit Fee $85.00 $85.00 Paid 06/28/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/28/2022
Valuation Fee New Single Family $1,334.27 $1,334.27 Paid 06/28/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/19/2022 08/19/2022
Underslab Plumbing Inspection - Residential Passed 9/16/2022 9/16/2022 09/16/2022
Miscellaneous Inspection Passed 11/3/2022 11/03/2022
Misc
Informational
11/03/2022
GARAGE & BREAKFAST ROOM PORTAL FRAMES 3RD PARTY BY CHRISTOPER VEITH @ APEX SIGNED & SEALED BY CLAYTON HESS UPLOADED TO PERMIT
Miscellaneous Inspection Passed 11/8/2022 11/08/2022
Misc
Informational
11/08/2022
GARAGE & BREAKFAST ROOM PORTAL FRAMING 3RD PARTY BY CHRISTOPHER VEITH @ APEX SIGNED & SEALED BY CLAYTON HESS UPLOADED TO PERMIT
Water Service Inspection - R Passed 12/14/2022 (1:00) 12/14/2022 12/14/2022
Sewer Service Inspection - R Passed 12/15/2022 (1:30) 12/15/2022 12/15/2022
Gas Service Inspection - Residential Passed 1/20/2023 1/20/2023 01/20/2023
All Rough Inspection - Residential Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
Fb top plate penetrations garage wall at stairs - Collar ties garage roof - Address deck post splice not to plan - No overlap entry wall and dining room wall at top plate - Joist hangers missing nails hall near owner suite - No overlap at top plate owners bedroom and sliding door wall - Stud shoes in owner bathroom should have nails or structural screws and missing a few - 3 studs minimum exterior corner basement bedroom 3 - No water line to hose bib near sump discharge
Electrical Service Inspection Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
Move UFER conductor to neutral buss bar or add #4 jumper from ground buss to neutral bus
Electrical Service Inspection Passed 1/27/2023 1/27/2023 01/27/2023
Misc
Resolved
01/27/2023
Move UFER conductor to neutral buss bar or add #4 jumper from ground buss to neutral bus
All Rough Inspection - Residential Passed 1/27/2023 1/27/2023 01/27/2023
Misc
Resolved
01/27/2023
Fb top plate penetrations garage wall at stairs - Collar ties garage roof - Address deck post splice not to plan - No overlap entry wall and dining room wall at top plate - Joist hangers missing nails hall near owner suite - No overlap at top plate owners bedroom and sliding door wall - Stud shoes in owner bathroom should have nails or structural screws and missing a few - 3 studs minimum exterior corner basement bedroom 3 - No water line to hose bib near sump discharge
Driveway Inspection Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 DP. Forms are placed and aggreagte is placed and compacted. Expansion joint was pointed out. Approved to pour.
Plot Plan Inspection Passed 07/11/2023
Occupancy Inspection - Codes Residential Failed 7/11/2023 7/11/2023 07/11/2023
Misc
Corrective Action Required
07/11/2023
-address pending driveway inspection -address pending pier inspection -sod -splash block and sump pump discharge to extend 36” from foundation -outlet at basement wet bar to be with 24” of sink -set screw sheered off at water anti syphon device -water heater relief valve discharge pump to high off ground see P2804.6.1(10) of the 2018 irc -bring hydrant valve lid and ring to grade
Driveway Inspection Passed 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
03/06/2023
3-6-23 DP. Forms are placed and aggregate is placed and compacted. Expansion joint was pointed out. Approved to pour. 7-12-23 DP. Driveway was poured, Forms removed. Passed.
Occupancy Inspection - Codes Residential Failed 7/13/2023 7/13/2023 07/13/2023
Misc
Corrective Action Required
07/11/2023
-Establish erosion control methods before any further inspections -address pending pier inspection -sod -splash block and sump pump discharge to extend 36” from foundation -outlet at basement wet bar to be with 24” of sink per IRC E3901.4 / NEC 210.52(c) -water heater relief valve discharge pump to high off ground see P2804.6.1(10) of the 2018 irc -bring hydrant valve lid and ring to grade
Piers/Caissons Inspection - Residential Passed 07/18/2023
Erosion Control Inspection Residential Passed 07/18/2023
Occupancy Inspection - Codes Residential Full C of O 7/18/2023 7/18/2023 07/18/2023
Misc
Resolved
07/18/2023
-Establish erosion control methods before any further inspections -sod -splash block and sump pump discharge to extend 36” from foundation -outlet at basement wet bar to be with 24” of sink per IRC E3901.4 / NEC 210.52(c) -bring hydrant valve lid and ring to grade
Documents & Images
Date Uploaded File Type Document Name
06/20/2022 Permit Application
06/21/2022 Permit Codes Residential Plan Review
06/23/2022 Plans APPROVED PLOT PLAN
06/28/2022 Permit Codes Residential Plan Review
06/28/2022 Permit DS Building Permit
06/28/2022 Receipt Receipt for transaction:2022-005222
06/29/2022 Approved Plans APPROVED PLANS
08/19/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
11/03/2022 Final_2022_10_28_PortalFrame_LSMO_New Mark Homes
11/03/2022 Letter INSPECTION SUMMARY
11/08/2022 Engineer Report/Study Final_2022_10_28_PortalFrame_LSMO_New Mark Homes
11/08/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/15/2022 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/26/2023 20230126_162114
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/13/2023 Letter INSPECTION SUMMARY
07/13/2023 2226 NW Killarney Ln_DECK PIER INSP_2023-07-12
07/18/2023 2226 CMR
07/18/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter Codes Final Certificate of Occupancy
07/18/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home