Summary
PRRES20221278
Building Permit - Residential
Final Completion
HANLEY MICHAEL & REBECCA
ALTERATION SINGLE FAMILY
ROOF MOUNTED SOLAR - 5.8 KW
04/04/2022
04/12/2022
10/09/2022
05/13/2022
Locations
Contacts
ASTRAWATT SOLAR, Address:3525 ROANOKE RD #110, Phone:(816) 489-4154  
MHAIL@ASTRAWATT.SOLAR  
HANLEY MICHAEL & REBECCA, Address:1509 SW GEORGETOWN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/14/2022 04/12/2022
Joe Frogge
Misc
Resolved
04/12/2022

Exterior conductors must be rated for wet conditions. Action required: Update conduit schedule to comply. 4/7/22 - Not addressed. THHN is not rated for wet conditions.
Fire Department Solar Review Approved 04/11/2022 04/12/2022
Jim Eden
Residential Plan Review Rejected 04/11/2022 04/07/2022
Joe Frogge
Miscellaneous Correction
Resolved
04/07/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed plumber to relocate vent pipe. (or revise designs to avoid vents)
Misc
Corrective Action Required
04/07/2022

Exterior conductors must be rated for wet conditions. Action required: Update conduit schedule to comply. 4/7/22 - Not addressed. THHN is not rated for wet conditions.
Fire Department Solar Review Approved 04/06/2022 04/06/2022
Jim Eden
Residential Plan Review Rejected 04/06/2022 04/04/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/04/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed plumber to relocate vent pipe. (or revise designs to avoid vents)
Misc
Corrective Action Required
04/04/2022

Exterior conductors must be rated for wet conditions. Action required: Update conduit schedule to comply.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Single Family $59.50 $59.50 Paid 04/12/2022
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Residential Not Ready 5/12/2022 5/12/2022 05/12/2022
Misc
Corrective Action Required
05/12/2022
NO ACCESS, CONTRACTOR FORGOT ABOUT APPT
Electrical Service Inspection Failed 5/12/2022 5/12/2022 05/12/2022
Misc
Corrective Action Required
05/12/2022
NO ACCESS, CONTRACTOR FORGOT ABOUT APPT
Electrical Service Inspection Passed 5/13/2022 5/13/2022 05/13/2022
Misc
Resolved
05/13/2022
NO ACCESS, CONTRACTOR FORGOT ABOUT APPT
Final Electrical Inspection - Residential Passed 5/13/2022 5/13/2022 05/13/2022
Final Inspection - Residential Passed 5/13/2022 5/13/2022 05/13/2022
Misc
Resolved
05/13/2022
NO ACCESS, CONTRACTOR FORGOT ABOUT APPT
Documents & Images
Date Uploaded File Type Document Name
04/04/2022 Application Form Hanley Permit Application (1)
04/04/2022 Plans Permit Plans_HANLEY, MICHAEL_04022022_REV-D (2)
04/06/2022 Permit Codes Residential Plan Review
04/07/2022 Plans Permit Plans_HANLEY, MICHAEL_04072022_REV-G
04/12/2022 Permit Codes Residential Plan Review
04/12/2022 Plans Permit Plans_HANLEY, MICHAEL_04072022_REV-G (2)
04/12/2022 Approved Plans approved - Permit Plans_HANLEY, MICHAEL_04072022_REV-G (2)
04/12/2022 Permit DS Building Permit
04/12/2022 Receipt Receipt for transaction:2022-002025
05/10/2022 Plans Permit Plans_HANLEY, MICHAEL_05062022_REV-H (1)
05/10/2022 Plans Hanley One Line Revions (1)
05/10/2022 Approved Plans approved - Hanley One Line Revions (1)
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home