Permit Application Status

PRRES20220731


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220731
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
03/01/2022
03/17/2022
08/31/2022
06/22/2023
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Nick Zvacek, Address:1009 Industrial Drive, Phone:(816) 325-3440  
ARROW CIRCLE ELECTRIC, Address:7801 BLUE RIDGE BLVD, Phone:(816) 373-4888  
COMFORT SYSTEMS HTG/CLG, Address:17232 BEL-RAY PL, Phone:(816) 322-1013  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 03/24/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 03/24/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 03/24/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/24/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/24/2022
9110078-Valuation Fee New Single Family $1,222.85 $1,222.85 Paid 03/24/2022
9110052-NSF Returned Check Fee $25.00 $25.00 Paid 03/24/2022
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$125.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/18/2022 04/18/2022
Misc
Informational
04/18/2022
third party inspection performed
Underslab Plumbing Inspection - Residential Not Ready 4/18/2022 4/18/2022 04/18/2022
Misc
Corrective Action Required
04/18/2022
not ready inspection denied -clean up street -repair downed silt fence -no premises identification
Erosion Control Inspection Residential Failed 4/18/2022 04/18/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/18/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 04/18/2022 9:29 AM
Erosion Control Inspection Residential Passed 4/22/2022 4/22/2022 04/22/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/22/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 04/18/2022 9:29 AM
Underslab Plumbing Inspection - Residential Failed 4/22/2022 4/22/2022 04/22/2022
Misc
Resolved
04/22/2022
not ready inspection denied -clean up street -repair downed silt fence -no premises identification
Misc
Corrective Action Required
04/22/2022
uncover all dwv for inspection Mitchell Schwarz 04/22/2022 1:28 PM
Underslab Plumbing Inspection - Residential Passed 4/26/2022 4/26/2022 04/26/2022
Misc
Resolved
04/26/2022
uncover all dwv for inspection Mitchell Schwarz 04/22/2022 1:28 PM
Sewer Service Inspection - R Passed 5/23/2022 (10:45) 5/23/2022 05/23/2022
Water Service Inspection - R Partial 5/23/2022 (10:45) 5/23/2022 05/23/2022
Misc
Informational
05/23/2022
Pex ran roughly 20’ from foundation
Water Service Inspection - R Passed 5/25/2022 (8:30) 5/25/2022 05/25/2022
Misc
Resolved
05/25/2022
Pex ran roughly 20’ from foundation
Piers/Caissons Inspection - Residential Passed 7/7/2022 (8:00) 7/7/2022 07/07/2022
All Rough Inspection - Residential Not Ready 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
-inspection denied no city stamped plans on site -no further inspections until erosion control is in compliance, maintain vegetation
Corrective Action Required
08/26/2022
Erosion Control Inspection Residential Failed 8/26/2022 08/26/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/26/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. maintain vegetation
Gas Service Inspection - Residential Failed 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
-inspection denied no city stamped plans on site -no further inspections until erosion control is in compliance, maintain vegetation
Electrical Service Inspection Failed 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
-inspection denied no city stamped plans on site -no further inspections until erosion control is in compliance, maintain vegetation
Piers/Caissons Inspection - Residential Failed 8/31/2022 (10:15) 8/31/2022 08/31/2022
Misc
Informational
08/31/2022
PIERS APROVED 7/7/22 AND POURED. NO OTHER PIERS FOUND.
Driveway Inspection Partial 9/7/2022 9/7/2022 09/07/2022
Misc
Informational
09/07/2022
9-7-22 RH. Driveway was formed up and aggregate was placed and compacted.
Driveway Inspection Partial 9/9/2022 9/9/2022 09/09/2022
Misc
Informational
09/07/2022
9-7-22 RH. Driveway was formed up and aggregate was placed and compacted.
Sidewalk Inspection Partial 9/12/2022 9/12/2022 09/12/2022
Misc
Informational
09/12/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Driveway Inspection Passed 9/16/2022 9/16/2022 09/16/2022
Misc
Informational
09/09/2022
9-7-22 RH. Driveway was formed up and aggregate was placed and compacted. 9-16-22 RH. Driveway meets LS and ADA Specification.
All Rough Inspection - Residential Failed 9/23/2022 09/23/2022
Miscellaneous Correction
Corrective Action Required
09/23/2022
- Flashing and trim all windows - Provide missing sliding door - Fire block penetrations in return air space media room at shower - Fire block penetration top plate powder room near garage - Install vent fan at powder room at front door and garage - Purlin struts spaced every 48” - Address over notched stud, basement sill plate near electrical panel - Anchor all steel columns in basement - Provide anchor bolt with in 12” of plate break south wall basement rec room - Fire block all basement exterior walls that have been fured out vertically every 10’ horizontal - Vent in basement bathroom should be at least 36” from shower
Gas Service Inspection - Residential Passed 9/23/2022 09/23/2022
Misc
Corrective Action Required
08/26/2022
-inspection denied no city stamped plans on site -no further inspections until erosion control is in compliance, maintain vegetation
Electrical Service Inspection Passed 9/23/2022 09/23/2022
Misc
Corrective Action Required
08/26/2022
-inspection denied no city stamped plans on site -no further inspections until erosion control is in compliance, maintain vegetation
Sidewalk Inspection Partial 10/10/2022 10/10/2022 10/10/2022
Misc
Informational
09/12/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 10-10-22 RH. Sidewalk is mostly poured and meets LS and ADA specification. There is one panel that is not poured yet.
All Rough Inspection - Residential Failed 10/12/2022 10/12/2022 10/12/2022
Miscellaneous Correction
Corrective Action Required
09/23/2022
- Install vent fan at powder room at front door and garage - Provide anchor bolt with in 12” of plate break south wall basement rec room
All Rough Inspection - Residential Passed 10/24/2022 10/24/2022 10/24/2022
Miscellaneous Correction
Resolved
10/24/2022
- Install vent fan at powder room at front door and garage - Provide anchor bolt with in 12” of plate break south wall basement rec room
Sidewalk Inspection Partial 11/7/2022 11/7/2022 10/31/2022
Misc
Informational
10/10/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 10-10-22 RH. Sidewalk is mostly poured and meets LS and ADA specification. There is one panel that is not poured yet. 10-31-22 RH. Sidewalk is still not completely finished.
Occupancy Inspection - Codes Residential Failed 6/6/2023 6/6/2023 06/06/2023
Misc
Corrective Action Required
06/06/2023
-address pending pier inspection -address pending sidewalk inspection -pay fees on irrigation permit -smoke combo required outside the immediate facility of bedroom (see master)
Plot Plan Inspection Failed 6/6/2023 06/06/2023
Misc
Corrective Action Required
06/06/2023
Uncover covered manhole
Occupancy Inspection - Codes Residential Failed 6/6/2023 06/06/2023
Misc
Corrective Action Required
06/06/2023
-address pending pier inspection -address pending sidewalk inspection -pay fees on irrigation permit -smoke combo required outside the immediate facility of bedroom (see master) -uncover covered manhole
Sidewalk Inspection Passed 6/7/2023 6/7/2023 06/07/2023
Misc
Informational
10/31/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 10-10-22 RH. Sidewalk is mostly poured and meets LS and ADA specification. There is one panel that is not poured yet. 10-31-22 RH. Sidewalk is still not completely finished. 6-7-23 BR Sidewalk is concreted to the specs of LS specification.
Piers/Caissons Inspection - Residential Passed 6/9/2023 06/09/2023
Misc
Resolved
06/09/2023
PIERS APROVED 7/7/22 AND POURED. NO OTHER PIERS FOUND.
Erosion Control Inspection Residential Passed 06/12/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/12/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. maintain vegetation
Plot Plan Inspection Passed 06/12/2023
Misc
Resolved
06/12/2023
Uncover covered manhole
Occupancy Inspection - Codes Residential Failed 6/12/2023 6/12/2023 06/12/2023
Misc
Corrective Action Required
06/06/2023
-pay fees on irrigation permit
Occupancy Inspection - Codes Residential Full C of O 6/22/2023 6/22/2023 06/22/2023
Misc
Resolved
06/22/2023
-pay fees on irrigation permit
Documents & Images
Date Uploaded File Type Document Name
03/01/2022 Excise Tax
03/03/2022 Permit Codes Residential Plan Review
03/03/2022 Application
03/04/2022 Permit Codes Residential Plan Review
03/09/2022 Approved Plans APPROVED DRAWINGS
03/14/2022 Plot Plan APPROVED PLOT PLAN
03/14/2022 Permit Codes Residential Plan Review
03/17/2022 Permit DS Building Permit
03/17/2022 Receipt Receipt for transaction:2022-001476
03/21/2022 M L Crose 3210 SW Enoch St LSMO NZC Permit 2022-0731 3rd Party Footing Inspection Report 3-21-22
03/24/2022 Receipt Receipt for transaction: 2022-001615
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
05/25/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/31/2022 Letter INSPECTION SUMMARY
03/20/2023 Letter Codes 140 Day Letter
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/07/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/09/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter Field Certificate of Occupancy
06/22/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home