Permit Application Status

PRRES20220082


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220082
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES.
01/07/2022
01/18/2022
07/12/2022
01/31/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 01/18/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 01/18/2022
Water Meter Fee $479.24 $479.24 Paid 01/18/2022
Right of Way Permit Fee $85.00 $85.00 Paid 01/18/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 01/18/2022
Valuation Fee New Single Family $1,494.26 $1,494.26 Paid 01/18/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 01/17/2023
Not Ready Inspection Fee $50.00 $50.00 Paid 01/17/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 2/9/2022 02/09/2022
Water Service Inspection - R Partial 2/16/2022 02/16/2022
Sewer Service Inspection - R Passed 2/16/2022 (1:30) 2/16/2022 02/16/2022
Underslab Plumbing Inspection - Residential Not Ready 2/18/2022 2/18/2022 02/18/2022
Misc
Corrective Action Required
02/18/2022
INSPECTION DENIED NO ADDRESS POSTED
Erosion Control Inspection Residential Failed 2/18/2022 02/18/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/18/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. REPAIR DOWNED SILT FENCE
Underslab Plumbing Inspection - Residential Not Ready 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
02/18/2022
INSPECTION DENIED NO ADDRESS POSTED -still not posted Mitchell Schwarz 02/22/2022 11:17 AM
Water Service Inspection - R Passed 2/22/2022 (11:00) 2/22/2022 02/22/2022
Erosion Control Inspection Residential Failed 2/22/2022 02/22/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/18/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. REPAIR DOWNED SILT FENCE
Underslab Plumbing Inspection - Residential Passed 3/2/2022 3/2/2022 03/02/2022
Misc
Resolved
03/02/2022
INSPECTION DENIED NO ADDRESS POSTED -still not posted Mitchell Schwarz 02/22/2022 11:17 AM
Erosion Control Inspection Residential Partial 3/2/2022 03/02/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/02/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. REPAIR DOWNED SILT FENCE
Misc
Informational
03/02/2022
EROSION CONTROL BACK IN COMPLIANCE Mitchell Schwarz 03/02/2022 9:48 AM
Gas Service Inspection - Residential Failed 7/6/2022 7/6/2022 07/06/2022
Misc
Corrective Action Required
07/06/2022
Complete gas line install at fireplace for inspection
Electrical Service Inspection Failed 7/6/2022 7/6/2022 07/06/2022
Misc
Corrective Action Required
07/06/2022
Connect ufer ground to middle grounded bus bar.
Erosion Control Inspection Residential Failed 7/6/2022 07/06/2022
Misc
Resolved
07/06/2022
EROSION CONTROL BACK IN COMPLIANCE Mitchell Schwarz 03/02/2022 9:48 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Failed 7/6/2022 7/6/2022 07/06/2022
Misc
Corrective Action Required
07/06/2022
-nail top plate to header per design at garage portal framing -seal top plate penetrations in garage N wall -fireblock furr outs in garage into furr down -seal top plate penetrations in between garage doors -seal penetrations under tub above garage -fire block hvac chase to ceiling space -fire block garage E wall into furr down -tie garage S wall to other exterior S wall -fire block into furr down in kitchen and dead space -address holes less than 2” from each other in floor joist above kitchen/great room -fireblock left and right of great room windows into furr down -complete gas line install at fire place -stud pack left of front door for gt bearing -nail all intersecting wall corners to code -protect all NM within 6’ of attic access -seal top plate penetration at hvac -be sure to provide code compliant access to jacuzzi tub motor -missing truss hangers on A7,8,14—complete —complete gas line install at fire place for gas inspection -connect ufer ground to middle grounded bus bar
Gas Service Inspection - Residential Passed 7/18/2022 7/18/2022 07/18/2022
Misc
Resolved
07/18/2022
Complete gas line install at fireplace for inspection
Electrical Service Inspection Failed 7/18/2022 7/18/2022 07/18/2022
Misc
Corrective Action Required
07/06/2022
Connect ufer ground to middle grounded bus bar. must connect directly to ufer ground first
All Rough Inspection - Residential Failed 7/18/2022 7/18/2022 07/18/2022
Misc
Corrective Action Required
07/06/2022
-seal top plate penetrations in garage N wall -fire block hvac chase to ceiling space(seal penetrations) -fire block garage E wall into furr down(see furr out wall right of fridge -address holes less than 2” from each other in floor joist above kitchen/great room(no letter for fix -fireblock left and right of great room windows into furr down(seal gaps) -seal top plate penetration at hvac -missing truss hangers onA14 -connect ufer ground to middle grounded bus bar
All Rough Inspection - Residential Passed 7/27/2022 7/27/2022 07/27/2022
Misc
Resolved
07/27/2022
-seal top plate penetrations in garage N wall -fire block hvac chase to ceiling space(seal penetrations) -fire block garage E wall into furr down(see furr out wall right of fridge -address holes less than 2” from each other in floor joist above kitchen/great room(no letter for fix -fireblock left and right of great room windows into furr down(seal gaps) -seal top plate penetration at hvac -missing truss hangers onA14
Electrical Service Inspection Failed 7/29/2022 7/29/2022 07/29/2022
Misc
Corrective Action Required
07/18/2022
Connect ufer ground to middle grounded bus bar. must connect directly to ufer ground first
Electrical Service Inspection Passed 8/10/2022 8/10/2022 08/10/2022
Misc
Resolved
08/10/2022
Connect ufer ground to middle grounded bus bar. must connect directly to ufer ground first
Erosion Control Inspection Residential Failed 8/10/2022 08/10/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. maintain gravel filter. Mitchell Schwarz 08/10/2022 8:47 AM
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/10/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Partial 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. Driveway was formed up and aggregate was placed and compacted.
Sidewalk Inspection Partial 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. sidewalk was formed up and aggregate was placed and compacted.
Piers/Caissons Inspection - Residential Passed 1/17/2023 01/17/2023
Occupancy Inspection - Codes Residential Failed 1/17/2023 1/17/2023 01/17/2023
Misc
Corrective Action Required
01/17/2023
-address pending sidewalk inspection -pay all fees -spark ring for outlet above fireplace -outlets under sink not working -security screws at rear door 2 per hinge -garage door to be self closing and latching -outlets in garage to comply with code section E3901.9 -handrail in garage to be code compliant R311.7.8.5
Sidewalk Inspection Passed 1/20/2023 1/20/2023 01/20/2023
Misc
Informational
08/25/2022
8-25-22 RH. sidewalk was formed up and aggregate was placed and compacted. 1-20-23 PS Sidewalk meets ADA and LS specifications
Plot Plan Inspection Passed 01/30/2023
Occupancy Inspection - Codes Residential Failed 1/30/2023 1/30/2023 01/30/2023
Misc
Corrective Action Required
01/17/2023
-GFCI protection for dishwasher
Occupancy Inspection - Codes Residential Full C of O 1/31/2023 1/31/2023 01/31/2023
Misc
Resolved
01/31/2023
-GFCI protection for dishwasher
Documents & Images
Date Uploaded File Type Document Name
01/07/2022 HT #144 - PERMIT APP
01/11/2022 Approved Plans APPROVED DRAWINGS
01/11/2022 Approved Plans APPROVED TRUSS PACKAGE
01/11/2022 Approved Plans APPROVED TRUSS LAYOUT
01/13/2022 Permit Codes Residential Plan Review
01/18/2022 Plot Plan APPROVED PLOT PLAN
01/18/2022 Permit Codes Residential Plan Review
01/18/2022 Permit DS Building Permit
01/18/2022 Receipt Receipt for transaction:2022-000294
02/09/2022 144 hawthonre ridge footing inspection
02/16/2022 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/18/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/19/2022 144 Hawthorne Ridge Field Issue
07/29/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
11/02/2022 Plot Plan APPROVED AS BUILT PLOT PLAN
01/12/2023 Letter Codes 140 Day Letter
01/17/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/17/2023 Receipt Receipt for transaction:2023-000278
01/20/2023 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter Field Certificate of Occupancy
01/31/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home