Summary
PRRES20216307
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT - COVERED DECK
12/09/2021
12/13/2021
06/08/2022
10/28/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $450.00 $450.00 Paid 12/13/2021
Right of Way Permit Fee $85.00 $85.00 Paid 12/13/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/13/2021
Valuation Fee New Single Family $1,214.15 $1,214.15 Paid 12/13/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 12/13/2021
Water Meter Fee $479.24 $479.24 Paid 12/13/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/22/2021 (1:00) 12/22/2021 12/22/2021
Misc
Informational
01/20/2022
deck peir pads poured with footing
Sewer Service Inspection - R Passed 1/12/2022 01/12/2022
Water Service Inspection - R Passed 1/14/2022 (10:45) 1/14/2022 01/14/2022
Erosion Control Inspection Residential Failed 1/14/2022 01/14/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Failed 2/3/2022 2/3/2022 02/03/2022
Misc
Corrective Action Required
02/03/2022
can not inspect, plumbing covered in snow
Underslab Plumbing Inspection - Residential Passed 2/8/2022 2/8/2022 02/08/2022
Misc
Resolved
02/08/2022
can not inspect, plumbing covered in snow
Gas Service Inspection - Residential Failed 7/6/2022 7/6/2022 07/06/2022
Misc
Corrective Action Required
07/06/2022
Provide minimum 10psi at pressure gauge for gas line.
Electrical Service Inspection Passed 7/6/2022 7/6/2022 07/06/2022
Erosion Control Inspection Residential Failed 7/6/2022 07/06/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/06/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter
All Rough Inspection - Residential Failed 7/6/2022 7/6/2022 07/06/2022
Misc
Corrective Action Required
07/06/2022
NO FURTHER INSPECTIONS UNTIL EROSION CONTROL IS IN COMPLIANCE. -nail top plate to header at pfh -fire block furr down end in garage with dwv -midway strap dwv 2” or less in stud bays -fireblock hvac chase into furr down -fire block furr out wall for dwv into furr down in garage -fire block great room W wall to ceiling space -cspf at sliding back door —nail top plate to header at all cspf -lib bracing bed 4 to plans -provide attic access throughout to code -(2) 2x6 per plans at stairwell in basement -address over notched floor joisted above sump pump -address pex drilled through floor joist under laundry closer than 2” to each other -address cspf at basement windows per plans -solid blocking under kitchen island per plans -lib bracing in basement per plans -provide minimum 10psi at gas gauge -Address notched joist near bottom of stairs well in basement in middle 1/3 of floor joist -
Erosion Control Inspection Residential Failed 7/13/2022 07/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/06/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter
DCM5 ESC INSP DENIED
Corrective Action Required
07/13/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
All Rough Inspection - Residential Failed 7/13/2022 7/13/2022 07/13/2022
Misc
Corrective Action Required
07/06/2022
NO FURTHER INSPECTIONS UNTIL EROSION CONTROL IS IN COMPLIANCE. -nail top plate to header at pfh -fire block furr down end in garage with dwv -midway strap dwv 2” or less in stud bays -fireblock hvac chase into furr down -fire block furr out wall for dwv into furr down in garage -fire block great room W wall to ceiling space -cspf at sliding back door —nail top plate to header at all cspf -lib bracing bed 4 to plans -provide attic access throughout to code -(2) 2x6 per plans at stairwell in basement -address over notched floor joisted above sump pump -address pex drilled through floor joist under laundry closer than 2” to each other -address cspf at basement windows per plans -solid blocking under kitchen island per plans -lib bracing in basement per plans -provide minimum 10psi at gas gauge -Address notched joist near bottom of stairs well in basement in middle 1/3 of floor joist -
Misc
Corrective Action Required
07/13/2022
inspection denied due to erosion control. Mitchell Schwarz 07/13/2022 9:16 AM
Gas Service Inspection - Residential Failed 7/13/2022 7/13/2022 07/13/2022
Misc
Corrective Action Required
07/06/2022
Provide minimum 10psi at pressure gauge for gas line.
Misc
Corrective Action Required
07/13/2022
inspection denied due to lack of erosion control. Mitchell Schwarz 07/13/2022 9:16 AM
All Rough Inspection - Residential Failed 7/21/2022 7/21/2022 07/21/2022
Misc
Corrective Action Required
07/13/2022
-nail top plate to header at pfh -fire block furr down end in garage with dwv -midway strap dwv 2” or less in stud bays -fire block furr out wall for dwv into furr down in garage —nail top plate to header at all cspf -lib bracing bed 4 to plans -solid blocking under kitchen island per plans
Misc
Resolved
07/21/2022
inspection denied due to erosion control. Mitchell Schwarz 07/13/2022 9:16 AM
Gas Service Inspection - Residential Passed 7/21/2022 7/21/2022 07/21/2022
Misc
Resolved
07/21/2022
Provide minimum 10psi at pressure gauge for gas line.
Misc
Resolved
07/21/2022
inspection denied due to lack of erosion control. Mitchell Schwarz 07/13/2022 9:16 AM
All Rough Inspection - Residential Passed 7/22/2022 7/22/2022 07/22/2022
Misc
Resolved
07/22/2022
-nail top plate to header at pfh -fire block furr down end in garage with dwv -midway strap dwv 2” or less in stud bays -fire block furr out wall for dwv into furr down in garage —nail top plate to header at all cspf -lib bracing bed 4 to plans -solid blocking under kitchen island per plans
Driveway Inspection Partial 8/4/2022 08/04/2022
Misc
Informational
08/04/2022
8-4-22 RH. Driveway was formed up and aggregate was placed and compacted.
Sidewalk Inspection Partial 8/4/2022 08/04/2022
Misc
Informational
08/04/2022
8-4-22 RH. Sidewalk was formed up and aggregate was placed and compacted.
Driveway Inspection Passed 8/12/2022 8/12/2022 08/15/2022
Misc
Informational
08/04/2022
8-4-22 RH. Driveway was formed up and aggregate was placed and compacted. 8-15-22 RH. Driveway passed LS and ADA specification.
Sidewalk Inspection Passed 8/12/2022 8/12/2022 08/15/2022
Misc
Informational
08/04/2022
8-4-22 RH. Sidewalk was formed up and aggregate was placed and compacted. 8-15-22 RH. Sidewalk passed LS and ADA specification.
Piers/Caissons Inspection - Residential Passed 10/20/2022 10/20/2022
Erosion Control Inspection Residential Passed 10/20/2022 10/20/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/20/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/20/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter
DCM5 ESC INSP DENIED
Resolved
10/20/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Occupancy Inspection - Codes Residential Failed 10/20/2022 10/20/2022 10/20/2022
Misc
Corrective Action Required
10/20/2022
-provide as graded plot plan -locate and identify sewer tracer wire -garage door to be self closing and latching -hardware at rear slider -deck stairs greater than 3/8” difference in rise -multiple stairs to basement greater than 7 3/4” rise -label all non GFCI outlets in unfinished spaces
Plot Plan Inspection Passed 10/28/2022
Occupancy Inspection - Codes Residential Full C of O 10/28/2022 10/28/2022 10/28/2022
Misc
Resolved
10/28/2022
-provide as graded plot plan -garage door to be self closing and latching -hardw -label all non GFCI outlets in unfinished spaces
Documents & Images
Date Uploaded File Type Document Name
12/09/2021 H4 #131 - PERMIT APPLICATION
12/09/2021 Approved Plans APPROVED PLANS
12/09/2021 Approved Plans APPROVED TRUSS DRAWINGS
12/09/2021 Approved Plans APPROVED TRUSS LAYOUT
12/10/2021 Permit Codes Residential Plan Review
12/10/2021 SKM_C36821121011310
12/10/2021 Permit Codes Residential Plan Review
12/10/2021 Plot Plan APPROVED PLOT PLAN
12/13/2021 Permit DS Building Permit
12/13/2021 Receipt Receipt for transaction:2021-009239
12/22/2021 Letter INSPECTION SUMMARY
01/12/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
02/03/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter Codes 140 Day Letter
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/08/2022 131 Hawthorn Ridge letter
07/14/2022 131 Hawthorne Ridge letter
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
10/28/2022 Letter INSPECTION SUMMARY
10/28/2022 Letter Field Certificate of Occupancy
10/28/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.