Permit Application Status

PRRES20216304


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216304
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
12/09/2021
12/15/2021
06/11/2022
12/02/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,640.21 $1,640.21 Paid 12/15/2021
Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/15/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 12/15/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 12/15/2021
Water Meter Fee $479.24 $479.24 Paid 12/15/2021
Not Ready Inspection Fee $75.00 $75.00 Paid 11/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 1/10/2022 01/10/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/10/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Passed 1/10/2022 01/10/2022
Misc
Informational
01/10/2022
see 3rd party inspection report
Erosion Control Inspection Residential Failed 1/13/2022 01/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/10/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/13/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN UP STREET LARGE CLUMPS OF DIRT FALLING IN ROAD WAY FROM SPOILS PILE AT NORTH OF LOT
Sewer Service Inspection - R Passed 1/18/2022 (8:30) 1/18/2022 01/18/2022
Water Service Inspection - R Passed 1/19/2022 (11:00) 1/19/2022 01/19/2022
Erosion Control Inspection Residential Failed 1/28/2022 01/28/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/28/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
01/28/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN UP STREET LARGE CLUMPS OF DIRT FALLING IN ROAD WAY FROM SPOILS PILE AT NORTH OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/28/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN EROSION CONTROL AT FRONT OF LOT
Erosion Control Inspection Residential Failed 2/8/2022 02/08/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
02/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN EROSION CONTROL AT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/08/2022 3:25 PM
Erosion Control Inspection Residential Failed 2/14/2022 02/14/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/08/2022 3:25 PM
Misc
Corrective Action Required
02/14/2022
Maintain gravel filter and move rock dump in street
Underslab Plumbing Inspection - Residential Failed 2/14/2022 2/14/2022 02/14/2022
Misc
Corrective Action Required
02/14/2022
Inspection denied due to insufficient erosion control -repair silt fence by storm drain -remove rock from street and maintain gravel filter
Erosion Control Inspection Residential Partial 3/4/2022 03/04/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
03/04/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/08/2022 3:25 PM
Misc
Resolved
03/04/2022
Maintain gravel filter and move rock dump in street
Misc
Informational
03/04/2022
EROSION CONTRON BACK IN COMPLIANCE Mitchell Schwarz 03/04/2022 9:59 AM
Underslab Plumbing Inspection - Residential Passed 3/4/2022 3/4/2022 03/04/2022
Misc
Resolved
03/04/2022
Inspection denied due to insufficient erosion control -repair silt fence by storm drain -remove rock from street and maintain gravel filter
All Rough Inspection - Residential Not Ready 7/11/2022 7/11/2022 07/11/2022
Misc
Corrective Action Required
07/11/2022
inspection denied erosion control not in compliance. silt fence around lot not in compliance.
Gas Service Inspection - Residential Failed 7/11/2022 7/11/2022 07/11/2022
Misc
Corrective Action Required
07/11/2022
inspection denied erosion control not in compliance.
Electrical Service Inspection Failed 7/11/2022 7/11/2022 07/11/2022
Misc
Corrective Action Required
07/11/2022
inspection denied erosion control not in compliance.
Erosion Control Inspection Residential Failed 7/11/2022 07/11/2022
Misc
Resolved
07/11/2022
EROSION CONTRON BACK IN COMPLIANCE Mitchell Schwarz 03/04/2022 9:59 AM
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Gas Service Inspection - Residential Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/11/2022
-COMPLETE GAS LINE INSTALL AT FIREPLACE, PRESSURE TEST AFTER CONNECTION
Electrical Service Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/11/2022
-use correct size lug for sub feeder at main service panel to neutral bar -GEC for UFER must be continuous, no splices or breaks E3607.5 SYSTEM GROUNDING. An unspliced main bonding jumper shall be used to connect the equipment grounding conductor(s) and the service-disconnect enclosure to the grounded conductor of the system within the enclosure for each service disconnect. -Provide jumper from ground bar to neutral bar or land CEE on neutral bar
All Rough Inspection - Residential Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/11/2022
-fireblock HVAC fur out garage -seal top and bottom plate penetrations garage, garage entry, master closet, kitchen, 2nd floor -provide joist hanger at joist to header connection at HVAC chase garage entry -provide bonding screws at metal light plates -install all exterior doors -complete gas line install at fireplace -seal floor penetrations at fireplace -secure gas flex line at fireplace -have engineer address top plate corner lap connection at great room to kitchen wall, dbl girder trusses landing on 2x4 blocks above top plate, lateral restraint and uplift resistance -min 24” lap between dbl top plate break - see breakfast exterior wall -provide H2.5 truss hold downs at both plies dbl girder trusses great room -fur down for DWV front bathroom -LIB x bracing all locations per plans -all truss hangers per plans -all truss lateral bracing per plans -provide (4) 2X stud packs at 1st floor girder truss bearing points to transfer load from 2nd floor truss stud packs -H2.5 truss hold down clips at 2nd floor girder trusses -have engineer with truss manufacturer address dbl girder truss 2nd floor that has been bored for electrical -dbl girder truss (6) 2x6 stud pack bearing at stair wall per plans -complete plumbing basement -address floor joist cut for DWV at south basement -land electrical wire to box at sump pump -address cut floor joist for DWV north basement -provide 3.5” and 4” SCH 40 steel columns at W10x26 steel beam basement per plans -use correct size lug for sub feeder at main service panel to neutral bar -GEC for UFER must be continuous, no splices or breaks E3607.5 SYSTEM GROUNDING. An unspliced main bonding jumper shall be used to connect the equipment grounding conductor(s) and the service-disconnect enclosure to the grounded conductor of the system within the enclosure for each service disconnect. -Provide jumper from ground bar to neutral bar or land CEE on neutral bar
Gas Service Inspection - Residential Passed 7/22/2022 7/22/2022 07/22/2022
Misc
Resolved
07/22/2022
-COMPLETE GAS LINE INSTALL AT FIREPLACE, PRESSURE TEST AFTER CONNECTION
Electrical Service Inspection Passed 7/22/2022 7/22/2022 07/22/2022
Misc
Resolved
07/22/2022
All Rough Inspection - Residential Passed 7/22/2022 7/22/2022 07/22/2022
Misc
Resolved
07/22/2022
Driveway Inspection Partial 8/22/2022 8/22/2022 08/19/2022
Misc
Informational
08/19/2022
8-19-22 RH. Rain stopped work and contractor will be ready for inspection 8-22-22.
Driveway Inspection Passed 8/22/2022 8/22/2022 08/22/2022
Misc
Informational
08/19/2022
8-19-22 RH. Rain stopped work and contractor will be ready for inspection 8-22-22.
Misc
Informational
08/22/2022
On Monday, 8-22-2022. I (Tom Taylor) performed and passed a driveway for placement of concrete at this location.
Sidewalk Inspection Passed 8/22/2022 08/22/2022
Misc
Informational
08/22/2022
On Monday 8-22-2022. I performed and passed a sidewalk inspection at this location for placement of concrete.
Piers/Caissons Inspection - Residential Passed 11/17/2022 11/17/2022
Occupancy Inspection - Codes Residential Failed 11/17/2022 11/17/2022 11/17/2022
Misc
Corrective Action Required
11/17/2022
-provide as graded plot plan -pay all fees -obtain issued lawn irrigation permit -garage GFCI outlet closet to stairs in garage not working properly -spark ring as required by code for kitchen outlets where greater than 3/8 gap -spark ring for outlet above fire place -stairs greater than 3/8 difference in rise at back patio -GFCI outlet for disposal in kitchen
Plot Plan Inspection Passed 11/18/2022 11/18/2022
Occupancy Inspection - Codes Residential Failed 11/29/2022 11/29/2022 11/29/2022
Misc
Corrective Action Required
11/17/2022
-spark ring as required by code for kitchen outlets where greater than 3/8 gap
Occupancy Inspection - Codes Residential Full C of O 12/2/2022 12/2/2022 12/02/2022
Misc
Resolved
12/02/2022
-spark ring as required by code for kitchen outlets where greater than 3/8 gap
Documents & Images
Date Uploaded File Type Document Name
12/09/2021 HT #143 - PERMIT APPLICATION
12/13/2021 Permit Codes Residential Plan Review
12/13/2021 Approved Plans Approved Drawings
12/13/2021 Approved Plans Approved Truss Layout
12/13/2021 Approved Plans Approved Truss Package
12/14/2021 Plot Plan Approved Plot Plan
12/14/2021 Permit Codes Residential Plan Review
12/15/2021 Permit DS Building Permit
12/15/2021 Receipt Receipt for transaction:2021-009309
01/10/2022 143 Hawthorne Ridge FTNG
01/10/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/19/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/19/2022 143 HAWTHORNE RIDGE LETTER
07/19/2022 143 truss letter
07/22/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/17/2022 Plot Plan Approved As-Graded Plot Plan
11/17/2022 Receipt Receipt for transaction:2022-009012
11/29/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter Codes Final Certificate of Occupancy
12/02/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home