Permit Application Status

PRRES20216115


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216115
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK - ENG. FLOOR SYSTEM (DEF)
11/29/2021
06/20/2022
05/29/2022
04/24/2023
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
PERMITTING@JFECONSTRUCTION.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/20/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/20/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/20/2022
9110078-Valuation Fee New Single Family $1,100.15 $1,100.15 Paid 06/20/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 06/20/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 06/20/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/18/2022 (1:15) 7/18/2022 07/18/2022
Erosion Control Inspection Residential Failed 7/18/2022 07/18/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/18/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Underslab Plumbing Inspection - Residential Passed 7/25/2022 7/25/2022 07/25/2022
Sewer Service Inspection - R Passed 8/5/2022 (8:00) 8/5/2022 08/05/2022
Water Service Inspection - R Passed 8/10/2022 08/10/2022
Gas Service Inspection - Residential Passed 12/5/2022 12/5/2022 12/05/2022
Electrical Service Inspection Passed 12/5/2022 12/5/2022 12/05/2022
All Rough Inspection - Residential Failed 12/5/2022 12/5/2022 12/05/2022
Misc
Corrective Action Required
12/05/2022
- Tighten anchor bolts garage - Provide window master bedroom - Provide window master bathroom - Security blocking basement door - Flash and trim missing windows
All Rough Inspection - Residential Passed 12/9/2022 12/9/2022 12/09/2022
Misc
Resolved
12/09/2022
Sidewalk Inspection Partial 1/24/2023 1/24/2023 01/24/2023
Misc
Informational
01/24/2023
1-24-23 PS Partial inspection on pre pour for right east side of driveway. Forms are in place and aggregate compacted.OK to pour on that side. Per contractor will have to call back in for sidewalk on west side of driveway as communication box is being relocated from where sidewalk will be placed.
Driveway Inspection Partial 1/24/2023 1/24/2023 01/24/2023
Misc
Informational
01/24/2023
1-24-23 PS Forms are in place and aggregate has been compacted, ok to pour
Erosion Control Inspection Residential Failed 2/22/2023 02/22/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/22/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/22/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sidewalk Inspection Passed 3/20/2023 3/20/2023 03/20/2023
Misc
Informational
01/24/2023
1-24-23 PS Partial inspection on pre pour for right east side of driveway. Forms are in place and aggregate compacted.OK to pour on that side. Per contractor will have to call back in for sidewalk on west side of driveway as communication box is being relocated from where sidewalk will be placed. 3-20-23 RH. Driveway meets LS and ADA specificaiton.
Driveway Inspection Passed 3/20/2023 3/20/2023 03/20/2023
Misc
Informational
01/24/2023
1-24-23 PS Forms are in place and aggregate has been compacted, ok to pour 3-20-23 RH. Driveway meets LS and ADA specification.
Piers/Caissons Inspection - Residential Passed 4/13/2023 04/13/2023
Occupancy Inspection - Codes Residential Failed 4/13/2023 4/13/2023 04/13/2023
Misc
Corrective Action Required
04/13/2023
-identify sewer tracer wire -sod splash blocks and sump pump discharge to extend 36” from foundation -obtain issued lawn irrigation permit. -hardware for rear slider -all outlets in master closet/laundry to be GFCI Protected -security screws at rear patio door. 2 per hinge and strike plate
Plot Plan Inspection Passed 4/13/2023 04/13/2023
Erosion Control Inspection Residential Passed 04/24/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/24/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/24/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Resolved
04/24/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Full C of O 4/24/2023 4/24/2023 04/24/2023
Misc
Resolved
04/24/2023
-identify sewer tracer wire -sod splash blocks and sump pump discharge to extend 36” from foundation -obtain issued lawn irrigation permit. -hardware for rear slider -all outlets in master closet/laundry to be GFCI Protected -security screws at rear patio door. 2 per hinge and strike plate
Documents & Images
Date Uploaded File Type Document Name
11/29/2021 HF 60 - Tax App
11/30/2021 Plot Plan APPROVED PLOT PLAN
11/30/2021 Permit Codes Residential Plan Review
11/30/2021 HF 60 - Permit App
05/31/2022 Permit Codes Residential Plan Review
06/20/2022 Permit DS Building Permit
06/20/2022 Receipt Receipt for transaction:2022-004888
07/01/2022 Approved Plans APPROVED PLANS
07/14/2022 Wilmoth 2114 SW Red Barn Ln LSMO Retreat at Hook Farms Lot 60 3rd Party Footing Inspection Report 7-12-22
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/25/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
09/08/2022 2114 SW Red Barn Ln_DECK PIER INSP_2022-09-07
09/15/2022 2114 SW Red Barn Ln_SUS GAR SLAB INSP_2022-09-14
10/17/2022 2114 SW Red Barn Ln_DECK PIER INSP_2022-09-07
10/17/2022 2114 SW Red Barn Ln_SUS GAR SLAB INSP_2022-09-14
12/05/2022 Letter INSPECTION SUMMARY
12/05/2022 Letter INSPECTION SUMMARY
12/05/2022 Letter INSPECTION SUMMARY
12/09/2022 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
03/20/2023 Letter INSPECTION SUMMARY
03/20/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter Field Certificate of Occupancy
04/24/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home