Summary
PRRES20215864
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
11/09/2021
11/10/2021
04/19/2023
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
Curtis Tate, Address:PO box 942   
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
CURTIS@SABHOMES.COM  
Zack Bryant, Address:200 NW Commerce Court  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 11/10/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/10/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 11/10/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 11/10/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 11/10/2021
9110078-Valuation Fee New Single Family $1,514.60 $1,514.60 Paid 11/10/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/02/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/24/2021 11/24/2021
Misc
Informational
11/24/2021
3rd party inspection ufer located about 5' back from the front right corner in the right sidewall
Sewer Service Inspection - R Passed 12/8/2021 12/08/2021
Water Service Inspection - R Passed 12/9/2021 (2:00) 12/9/2021 12/09/2021
Erosion Control Inspection Residential Failed 12/9/2021 12/09/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 12/10/2021 12/10/2021 12/10/2021
Piers/Caissons Inspection - Residential Passed 12/17/2021 (1:30) 12/17/2021 12/17/2021
Electrical Service Inspection Passed 4/15/2022 4/15/2022 04/15/2022
Gas Service Inspection - Residential Passed 4/15/2022 4/15/2022 04/15/2022
All Rough Inspection - Residential Failed 4/15/2022 4/15/2022 04/15/2022
Misc
Corrective Action Required
04/15/2022
-complete pfg (nailing) -fire block hvac chase to ceiling space -seal penetrations in RA mud hall -seal penetrations in joist space used for RA above mud hall -fire block half bath to to garage furr down W wall -5 2x4 at garage beam ends -missing lvls above front entry -nail all intersecting wall corners 12” OC -address rafter/ceiling joists to top plate connection rafters not tied to ceiling joists of top plate -seal penetration in RA panning above coat closet/washer dryer -fire block above fire place into ceiling space -jacuzzi tub motor and outlet to remain accessible at time of finish to code -roof boots to be installed -strap top plate where plate breaks lapped less than 24” master closet exterior wall -all bolts at beam to wood connection above kitchen area to have nuts and washers to plans and be tight -properly secure column to beam -provide support under double lvl at stairway entry -fire block top of stairs 2nd floor exterior 2x4 furred out wall to ceiling space -fire block at loft entry left to ceiling space -snow blocking at back loft wall -missing 2 2x12 above stairwell -seal penetrations for low voltage in bed 4 -seal penetrations in top plate for dwv in jack and Jill bath -address rafters above front entry landing on multiple plates -seal penetration into attic space at dwv near bed 2 bath -anchor bolts to be in the middle 1/3 of sill plate and tight. See basement -secure main floor column to beam below -address joist cut for column from first floor -solid block under cantilever
All Rough Inspection - Residential Failed 4/26/2022 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/15/2022
-seal penetrations in joist space used for RA above mud hall -address rafter/ceiling joists to top plate connection rafters not tied to ceiling joists of top plate -seal penetration in RA panning above coat closet/washer dryer
All Rough Inspection - Residential Not Ready 4/29/2022 4/29/2022 04/29/2022
Misc
Corrective Action Required
04/26/2022
-seal penetrations in joist space used for RA above mud hall -address rafter/ceiling joists to top plate connection rafters not tied to ceiling joists of top plate
All Rough Inspection - Residential Passed 5/9/2022 5/9/2022 05/09/2022
Misc
Resolved
05/09/2022
-seal penetrations in joist space used for RA above mud hall -address rafter/ceiling joists to top plate connection rafters not tied to ceiling joists of top plate
Driveway Inspection Partial 8/18/2022 8/18/2022 08/18/2022
Misc
Informational
08/18/2022
8.18.2022 I performed a driveway inspection and pass the subgrade to pour concrete
Sidewalk Inspection Partial 8/18/2022 8/18/2022 08/18/2022
Misc
Informational
08/18/2022
8.18.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete
Driveway Inspection Passed 8/24/2022 8/24/2022 08/24/2022
Misc
Informational
08/18/2022
8.18.2022 I performed a driveway inspection and pass the subgrade to pour concrete 8-24-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 8/24/2022 8/24/2022 08/24/2022
Misc
Informational
08/18/2022
8.18.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete 8-24-22 RH. Sidewalk meets LS and ADA specification.
Erosion Control Inspection Residential Failed 10/26/2022 10/26/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/26/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/26/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:01 PM
Occupancy Inspection - Codes Residential Failed 1/23/2023 1/23/2023 01/23/2023
Misc
Corrective Action Required
01/23/2023
No further inspections until erosion control is in compliance -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -garage door to be self closing and latching -open junction box under cabinets in kitchen -spark ring at outlet above fireplace -open junction box at stairs for switches -hardware for rear slider -open junction box in raised floor area 2nd floor -handrail for deck stairs
Erosion Control Inspection Residential Failed 1/6/2023 01/23/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
01/23/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:01 PM
Misc
Corrective Action Required
01/23/2023
Erosion control at rear of lot, not in compliance
Erosion Control Inspection Residential Passed 4/13/2023 04/13/2023
Misc
Resolved
04/13/2023
Erosion control at rear of lot, not in compliance
Occupancy Inspection - Codes Residential Failed 4/13/2023 4/13/2023 04/13/2023
Misc
Corrective Action Required
01/23/2023
-handrail for deck stairs
Plot Plan Inspection Passed 4/13/2023 04/13/2023
Occupancy Inspection - Codes Residential Full C of O 4/19/2023 4/19/2023 04/19/2023
Misc
Resolved
04/19/2023
-handrail for deck stairs
Documents & Images
Date Uploaded File Type Document Name
11/09/2021 hf22 excise tax app
11/09/2021 hf22 permit app
11/09/2021 Approved Plans APPROVED PLANS
11/10/2021 Plot Plan APPROVED PLOT PLAN
11/10/2021 Permit Codes Residential Plan Review
11/10/2021 Permit DS Building Permit
11/10/2021 Receipt Receipt for transaction:2021-008656
11/23/2021 2613 SW Hook Farm Ln LSMO Hook Farms Lot 22 SAB P 2021-5864 3rd Party Footing Inspection Report
11/24/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/17/2021 Letter INSPECTION SUMMARY
12/17/2021 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/20/2022 DW FRAMING ADDENDUM Stratoga 2613 SW Hook Farm Ln HF22
04/26/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/04/2022 DW RAFTER LETTER Exp Stratoga 2613 SW Hook Farm Lane HF22
05/09/2022 Letter INSPECTION SUMMARY
07/29/2022 20220729_085138
07/29/2022 20220729_085122
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
09/02/2022 Receipt Receipt for transaction:2022-007226
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter Field Certificate of Occupancy
04/19/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home