Summary
PRRES20215607
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. COVERED DECK. ROOF TRUSSES.
10/26/2021
11/02/2021
04/26/2022
10/05/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
LOREN@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $450.00 $450.00 Paid 11/02/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 11/02/2021
Water Meter Fee $479.24 $479.24 Paid 11/02/2021
Right of Way Permit Fee $85.00 $85.00 Paid 11/02/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/02/2021
Valuation Fee New Single Family $1,150.72 $1,150.72 Paid 11/02/2021
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 09/14/2022
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 09/14/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/9/2021 12/9/2021 12/09/2021
Misc
Corrective Action Required
12/09/2021
APPROVED PER BRADLEY HUXOL 11/16/21
Underslab Plumbing Inspection - Residential Passed 12/14/2021 12/14/2021 12/14/2021
Sewer Service Inspection - R Passed 1/13/2022 (1:00) 1/13/2022 01/14/2022
Water Service Inspection - R Passed 1/14/2022 (10:45) 1/14/2022 01/14/2022
Erosion Control Inspection Residential Failed 1/14/2022 01/14/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 6/10/2022 6/10/2022 06/10/2022
Gas Service Inspection - Residential Passed 6/10/2022 6/10/2022 06/10/2022
All Rough Inspection - Residential Failed 6/10/2022 6/10/2022 06/10/2022
Misc
Corrective Action Required
06/10/2022
inspection denied no city stamped plans on site. Mitchell Schwarz 06/10/2022 8:46 AM
All Rough Inspection - Residential Failed 6/17/2022 6/17/2022 06/17/2022
Misc
Resolved
06/17/2022
inspection denied no city stamped plans on site. Mitchell Schwarz 06/10/2022 8:46 AM
Misc
Corrective Action Required
06/17/2022
-Complete electrical at pfh -fireblock at dwv into furr down at fridge and seal all gaps -fire block hvac chase to 2nd floor -complete bath vent at owners entry -address holes drilled for pex closer than 2” above powder room -address over drilled floor joist for dwv above powder/kitchen -fireblock right and left of great room windows into furr down -address holes in floor joist above great room windows closer than 2” for pex -address all studs left of fireplace drilled to close to edges -seal return air space above -address/complete RA a entry dead space -install blocking at front entry window per plans -seal top plate penetrations bed 4 closet -protect all NM With in 6’ of attic access -
All Rough Inspection - Residential Failed 6/27/2022 6/27/2022 06/27/2022
Misc
Corrective Action Required
06/17/2022
-Complete electrical at pfh -address all studs left of fireplace drilled to close to edges have engineer readdress more than one stud over drilled -address/complete RA a entry dead space seal penetrations -seal top plate penetration bed 4 closet
All Rough Inspection - Residential Failed 6/29/2022 6/29/2022 06/29/2022
Misc
Corrective Action Required
06/27/2022
-address all studs left of fireplace drilled to close to edges have engineer readdress more than one stud over drilled -okay to insulate do not cover any items still I. need of inspection
All Rough Inspection - Residential Passed 6/30/2022 6/30/2022 06/30/2022
Misc
Resolved
06/30/2022
-address all studs left of fireplace drilled to close to edges have engineer readdress more than one stud over drilled -okay to insulate do not cover any items still I. need of inspection
Driveway Inspection Passed 7/14/2022 7/14/2022 07/14/2022
Misc
Informational
07/14/2022
On Thursday, 7-14-2022. I performed and passed driveway for concrete placement.
Sidewalk Inspection Passed 7/14/2022 7/14/2022 07/14/2022
Misc
Informational
07/14/2022
On Thursday, 7-14-2022. I performed an passed a sidewalk inspection for placement of concrete.
Piers/Caissons Inspection - Residential Passed 9/21/2022 09/21/2022
Misc
Informational
09/21/2022
Addressed in third party footing inspection
Erosion Control Inspection Residential Passed 9/21/2022 09/21/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/21/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 9/21/2022 9/21/2022 09/21/2022
Misc
Corrective Action Required
09/21/2022
-provide as graded plot plan -splash blocks to extend 36” from foundation -uncover covered water meter -address stairs at front stoop greater than 3/8 difference in risers -install kitchen hood or teammate electrical to box -handrail in garage to be to code -attic access cover in laundry -install handrail at stairs to basement as required by code -hand rail at basement steps to be to code -install handrail at stairs in basement To code -basement steps to meet code not to be greater than 7 3/4” See code sections R311.7.5 and code section R311.7.8
Occupancy Inspection - Codes Residential Failed 10/4/2022 10/4/2022 10/04/2022
Misc
Corrective Action Required
09/21/2022
-provide as graded plot plan -install handrail at stairs to basement as required by code -hand rail at basement steps to be to code -install handrail at stairs in basement To code -basement steps to meet code not to be greater than 7 3/4” See code sections R311.7.5 and code section R311.7.8
Plot Plan Inspection Passed 10/5/2022 10/05/2022
Documents & Images
Date Uploaded File Type Document Name
10/26/2021 H4 #133 - PERMIT APP
10/28/2021 Approved Plans APPROVED DRAWINGS
10/28/2021 Approved Plans APPROVED TRUSS LAYOUT
10/28/2021 Approved Plans APPROVED TRUSS PACKAGE
10/28/2021 Permit Codes Residential Plan Review
11/02/2021 Plot Plan APPROVED PLOT PLAN
11/02/2021 Permit Codes Residential Plan Review
11/02/2021 Permit DS Building Permit
11/02/2021 Receipt Receipt for transaction:2021-008451
12/06/2021 133 Hawthorne Ridge FDTN
12/07/2021 133 Hawthorne Ridge FTNG
12/09/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
01/14/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter Codes 140 Day Letter
06/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/25/2022 H4 133 Engineer Letter
06/27/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 133 Hawthorne Ridge Field Issue Letter REV
06/30/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
09/14/2022 Receipt Receipt for transaction:2022-007497
09/21/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter INSPECTION SUMMARY
10/04/2022 H4 133 plot plan
10/05/2022 Letter Codes Final Certificate of Occupancy
10/05/2022 Letter Field Certificate of Occupancy
10/05/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home