Permit Application Status

PRRES20214363


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20214363
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
08/23/2021
08/26/2021
09/22/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $360.00 $360.00 Paid 08/26/2021
Right of Way Permit Fee $85.00 $85.00 Paid 08/26/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/26/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 08/26/2021
Water Meter Fee $479.24 $479.24 Paid 08/26/2021
Valuation Fee New Single Family $1,004.50 $1,004.50 Paid 08/26/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/28/2021 9/28/2021 09/28/2021
Misc
Informational
09/28/2021
APPROVED PER BRADLEY HUXOL 9/24/21
Sewer Service Inspection - R Passed 11/2/2021 (1:00) 11/2/2021 11/02/2021
Water Service Inspection - R Passed 11/3/2021 (1:00) 11/3/2021 11/03/2021
Erosion Control Inspection Residential Failed 11/9/2021 11/09/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 11/9/2021 11/9/2021 11/09/2021
All Rough Inspection - Residential Failed 5/31/2022 5/31/2022 05/31/2022
Misc
Corrective Action Required
05/31/2022
inspection denied erosion control not in compliance
Gas Service Inspection - Residential Failed 5/31/2022 5/31/2022 05/31/2022
Misc
Corrective Action Required
05/31/2022
inspection denied erosion control not in compliance
Electrical Service Inspection Failed 5/31/2022 5/31/2022 05/31/2022
Misc
Corrective Action Required
05/31/2022
inspection denied erosion control not in compliance
Erosion Control Inspection Residential Failed 5/31/2022 05/31/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/31/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM5 ESC INSP DENIED
Corrective Action Required
05/31/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Misc
Corrective Action Required
05/31/2022
Maintain gravel filter
Electrical Service Inspection Passed 6/3/2022 6/3/2022 06/03/2022
Misc
Resolved
06/03/2022
inspection denied erosion control not in compliance
Gas Service Inspection - Residential Passed 6/3/2022 6/3/2022 06/03/2022
Misc
Resolved
06/03/2022
inspection denied erosion control not in compliance
All Rough Inspection - Residential Failed 6/3/2022 6/3/2022 06/03/2022
Misc
Resolved
06/03/2022
inspection denied erosion control not in compliance
Misc
Corrective Action Required
06/03/2022
-anchor bolts to be in with in 12” of plate breaks but not closer than 7x the diameter of the bolt -anchor bolts to be in the middle 1/3 of sill plate -fire block hvac chase at garage entry -rear dining room windows framed and nailed to plans. DO NOT OVER NAIL -provide clearance as required for fireplace per manufacture specifications -GB Bracing to be checked at time of completion -seal penetration in top plate in master bed -complete bath fan vent install -provide clearance at front stoop from patio siding from slab -nail lib bracing as required foyer -cs-pf at basement rear slider -fire block all furr down ends -seal penetrations in and complete all vertical to horizontal fire-blocking in basement -furr down for dwv and pex in basement wall bar area -solid block under kitchen island per plans -have engineer address basement Rec room window framing -anchor bolts to be in middle 1/3 of sill plate in basement -complete all exterior nailing to plans
All Rough Inspection - Residential Failed 6/9/2022 6/9/2022 06/09/2022
Misc
Corrective Action Required
06/03/2022
-anchor bolts to be in the middle 1/3 of sill plate -fire block hvac chase at garage entry -rear dining room windows framed and nailed to plans. DO NOT OVER NAIL (over nailed) -GB Bracing to be checked at time of completion -fire block all furr down ends -seal penetrations in and complete all vertical to horizontal fire-blocking in basement -furr down for dwv and pex in basement wall bar area fire block -have engineer address basement Rec room window framing -anchor bolts to be in middle 1/3 of sill plate in basement -complete all exterior nailing to plans
All Rough Inspection - Residential Failed 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/09/2022
-GB Bracing to be checked at time of completion -fire block above electrical panel behind furr down -seal penetrations in all vertical to horizontal fire-blocking in basement
All Rough Inspection - Residential Failed 6/14/2022 6/14/2022 06/14/2022
Misc
Corrective Action Required
06/13/2022
-GB Bracing to be checked at time of completion -okay to insulate
All Rough Inspection - Residential Passed 6/23/2022 6/23/2022 06/23/2022
Misc
Resolved
06/23/2022
-GB Bracing to be checked at time of completion -okay to insulate
Driveway Inspection Passed 6/23/2022 6/23/2022 06/23/2022
Misc
Informational
06/23/2022
On Thursday, 6-23-2022. I performed a driveway inspection and passed drive for placement of concrete.
Piers/Caissons Inspection - Residential Passed 9/8/2022 09/08/2022
Misc
Informational
09/08/2022
Addressed in third party footing inspection.
Plot Plan Inspection Passed 9/8/2022 09/08/2022
Erosion Control Inspection Residential Passed 9/8/2022 09/08/2022
DCM5 ESC INSP DENIED
Resolved
09/08/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Misc
Resolved
09/08/2022
Maintain gravel filter
Occupancy Inspection - Codes Residential Failed 9/8/2022 9/8/2022 09/08/2022
Misc
Corrective Action Required
09/08/2022
-provide permanent address properly illuminated and of contrasting color to background -hardware at rear sliding doors -secure decking -flood lamp at rear of home -open junction box above deck -garage stairs risers greater than 7 3/4” , more than 3/8 difference in risers -remove gas gauge and cap off
Occupancy Inspection - Codes Residential Full C of O 9/22/2022 9/22/2022 09/22/2022
Misc
Resolved
09/22/2022
-provide permanent address properly illuminated and of contrasting color to backgroun -hardware at rear sliding doors -secure decking -flood lamp at rear of home -open junction box above deck -garage stairs risers greater than 7 3/4” , more than 3/8 difference in risers -remove gas gauge and cap off
Documents & Images
Date Uploaded File Type Document Name
08/23/2021 H3 #12 - PERMIT APP
08/23/2021 Approved Plans APPROVED PLANS
08/23/2021 Approved Plans APPROVED TRUSS DRAWINGS
08/23/2021 Approved Plans APPROVED TRUSS LAYOUT
08/23/2021 Plot Plan APPROVED PLOT PLAN
08/24/2021 Permit Codes Residential Plan Review
08/26/2021 Permit DS Building Permit
08/26/2021 Receipt Receipt for transaction:2021-006848
09/24/2021 12 Hawthorne Ridge FTNG
09/28/2021 Letter INSPECTION SUMMARY
11/02/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/10/2022 12 Hawthonre Ridge Letter
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter INSPECTION SUMMARY
09/07/2022 LOT 12 ASBUILT
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
09/22/2022 Letter Field Certificate of Occupancy
09/22/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home