Summary
PRRES20214340
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - finished and UNFINISHED BASEMENT - ROOF TRUSSES - COVERED PATIO
08/20/2021
08/26/2021
09/28/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $540.00 $540.00 Paid 08/26/2021
Right of Way Permit Fee $85.00 $85.00 Paid 08/26/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/26/2021
Valuation Fee New Single Family $1,260.79 $1,260.79 Paid 08/26/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 08/26/2021
Water Meter Fee $479.24 $479.24 Paid 08/26/2021
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 09/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/12/2021 10/12/2021 10/12/2021
Misc
Informational
10/12/2021
APPROVED PER BRADLEY HUXOL 10/8/21
Sewer Service Inspection - R Passed 10/25/2021 (10:15) 10/25/2021 10/25/2021
Water Service Inspection - R Partial 10/25/2021 10/25/2021
Misc
Informational
10/25/2021
water service ran apox 20' from foundation.
Water Service Inspection - R Passed 10/26/2021 (9:45) 10/26/2021 10/26/2021
Misc
Resolved
10/26/2021
water service ran apox 20' from foundation.
Erosion Control Inspection Residential Failed 10/26/2021 10/26/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/26/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Failed 11/10/2021 11/10/2021 11/10/2021
Misc
Corrective Action Required
11/10/2021
Inspection denied no address
Erosion Control Inspection Residential Failed 11/10/2021 11/10/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/26/2021
fix downed silt fence EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 11/11/2021 11/11/2021 11/11/2021
Misc
Resolved
11/11/2021
Electrical Service Inspection Passed 6/15/2022 6/15/2022 06/15/2022
Gas Service Inspection - Residential Passed 6/15/2022 6/15/2022 06/15/2022
All Rough Inspection - Residential Failed 6/15/2022 6/15/2022 06/15/2022
Misc
Corrective Action Required
06/15/2022
- lib bracing in garage to plans -seal furr out walls into furr down -seal top plate penetration garage E wall -seal penetrations in powder room/garage wall into furr down -fireblock hvac chase to 2nd floor -provide venting for dwv at kitchen sink -fire block hvac chase at slider -seal gas line penetration at fireplace -strap top plate cut for duct work -address holes drilled closer than 2” from each other in joist for pex near slider -nail cspf to plans at office -Support duct above office -strap top plate to code cut for duct work -solid block sheathing breaks at stairwell landing -bed 4 top plate penetration near tub -fire block hvac chase into attic. Seal gaps -sold block sheathing breaks master bed -seal penetrations to ceiling space in master -complete bath fan in master bath -seal penetration into ceiling space at master toilet -fireblock furr down end basement rec room -seal penetrations in vertical to horizontal fireblocking -missing nails in hanger above Rex room -secure and protect service cable in furr down in basement bed closet -seal all gaps and penetrations in furr down basement closet -vertical to horizontal fire blocking every 10’ see basement bed -solid blocking to plans under kitchen island -missing double 2x10 above basement bed -
All Rough Inspection - Residential Failed 6/24/2022 6/24/2022 06/24/2022
Misc
Corrective Action Required
06/15/2022
-missing nails in hanger above Rec room -seal all gaps and penetrations in furr down basement closet -okay to insulate do not cover any items still in need of inspection
All Rough Inspection - Residential Failed 6/29/2022 6/29/2022 06/29/2022
Misc
Corrective Action Required
06/24/2022
-seal all gaps and penetrations in furr down basement closet seal around I beam -okay to insulate do not cover any items still in need of inspection
All Rough Inspection - Residential Passed 6/30/2022 6/30/2022 06/30/2022
Misc
Resolved
06/30/2022
-seal all gaps and penetrations in furr down basement closet seal around I beam -okay to insulate do not cover any items still in need of inspection
Driveway Inspection Passed 7/7/2022 07/07/2022
Misc
Informational
07/07/2022
Driveway has been formed with rock and has been compacted this morning. I drove by this afternoon and the driveway was poured and appears to meet all city standards.Steve Robbins 07/07/2022 3:59 PM
Piers/Caissons Inspection - Residential Passed 9/26/2022 09/26/2022
Occupancy Inspection - Codes Residential Failed 9/26/2022 9/26/2022 09/26/2022
Misc
Corrective Action Required
09/26/2022
-pay all fees -meter well to grade level -provide attic access above garage -handrail at garage stairs to code -provide ladder to code in basement window well -uncover covered manhole
Plot Plan Inspection Passed 9/28/2022 09/28/2022
Erosion Control Inspection Residential Passed 9/28/2022 09/28/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/28/2022
fix downed silt fence EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Documents & Images
Date Uploaded File Type Document Name
08/20/2021 H4 #106 - PERMIT APP
08/20/2021 Approved Plans APPROVED PLANS
08/20/2021 Approved Plans APPROVED TRUSS LAYOUT
08/20/2021 Approved Plans APPROVED TRUSS DRAWINGS
08/20/2021 Plot Plan APPROVED PLOT PLAN
08/23/2021 Permit Codes Residential Plan Review
08/26/2021 Permit DS Building Permit
08/26/2021 Receipt Receipt for transaction:2021-006849
10/11/2021 106 Hawthorne Ridge FTNG-permit
10/12/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
03/21/2022 H4 #106 - SCOPE OF WORK
03/21/2022 Approved Plans APPROVED BASEMENT FINISH
03/31/2022 Letter Codes 140 Day Letter
05/10/2022 Letter Codes 180 Day Letter
06/01/2022 Letter Codes 180 Day Letter
06/14/2022 H4 106 Request for Extension
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/20/2022 106 Hawthorne Ridge Letter (002)
06/24/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
08/04/2022 LOT 106 ASBUILT ROUGH (003)
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Receipt Receipt for transaction:2022-007802
09/28/2022 Letter Codes Final Certificate of Occupancy
09/28/2022 Letter Field Certificate of Occupancy
09/28/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home