Summary
PRRES20213827
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
07/23/2021
08/20/2021
01/22/2022
12/11/2023
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Nick Zvacek, Address:1009 Industrial Drive, Phone:(816) 325-3440  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
JEFF.BOEHM@ZVACEKCONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 08/20/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 08/20/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 08/20/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/20/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/20/2021
9110078-Valuation Fee New Single Family $1,441.35 $1,441.35 Paid 08/20/2021
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 11/5/2021 (1:00) 11/5/2021 11/05/2021
Water Service Inspection - R Partial 11/5/2021 11/05/2021
Underslab Plumbing Inspection - Residential Passed 11/8/2021 11/8/2021 11/08/2021
Water Service Inspection - R Passed 11/9/2021 11/09/2021
Erosion Control Inspection Residential Failed 3/8/2022 03/08/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/08/2022
DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Piers/Caissons Inspection - Residential Failed 3/8/2022 3/8/2022 03/08/2022
Misc
Corrective Action Required
03/08/2022
-DIG PIER HOLES DOWN TO MIN 36" BELOW GRADE
Piers/Caissons Inspection - Residential Passed 3/8/2022 (1:00) 3/8/2022 03/08/2022
Misc
Resolved
03/08/2022
-DIG PIER HOLES DOWN TO MIN 36" BELOW GRADE
All Rough Inspection - Residential Passed 4/4/2022 4/4/2022 04/04/2022
Misc
Corrective Action Required
04/04/2022
-Connect ducting to all bath fans -Provide fall protection for bedroom windows -Fb wall plate penetration by dryer duct -At rear master bedroom wall, strap top plates and protect plumbing -Protect plumbing at master toilet wall top plate -Nail siding at roof flashing at left master closet wall -Strap across cut top plates at front bedroom gable wall -Protect plumbing at wet bar -Nail joist hanger above basement bottom stair landing -Blocking cantilevered joists over wall **OK TO INSULATE
Electrical Service Inspection Passed 4/4/2022 4/4/2022 04/04/2022
Gas Service Inspection - Residential Passed 4/4/2022 4/4/2022 04/04/2022
All Rough Inspection - Residential Failed 4/4/2022 4/4/2022 04/04/2022
Misc
Corrective Action Required
04/04/2022
-Strap garage PFH wall header -Connect ducting to all bath fans -Provide fall protection for bedroom windows -Fb wall plate penetration by dryer duct -At rear master bedroom wall, strap top plates and protect plumbing -Protect plumbing at master toilet wall top plate -Nail siding at roof flashing at left master closet wall -Strap across cut top plates at front bedroom gable wall -Protect plumbing at wet bar -Nail joist hanger above basement bottom stair landing -Blocking cantilevered joists over wall **OK TO INSULATE
Driveway Inspection Partial 4/12/2022 04/12/2022
Misc
Informational
04/12/2022
4-12-22 AN. Forms are in place and aggregate is present and compacted
Driveway Inspection Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/12/2022
4-12-22 AN. Forms are in place and aggregate is present and compacted
Misc
Informational
04/14/2022
Driveway was framed up with aggregate in and compacted. 4/14/22 ES
All Rough Inspection - Residential Failed 4/15/2022 4/15/2022 04/15/2022
Misc
Corrective Action Required
04/04/2022
-Strap garage PFH wall header -Provide fall protection for bedroom windows -Fb wall plate penetration by dryer duct -At rear master bedroom wall, strap top plates and protect plumbing -Connect duct to fan above master toilet room -Nail siding at roof flashing at left master closet wall -Strap across cut top plates at front bedroom gable wall **OK TO INSULATE
All Rough Inspection - Residential Failed 4/21/2022 4/21/2022 04/21/2022
Misc
Corrective Action Required
04/15/2022
-Strap garage PFH wall header **get longer straps. Strap to extend min 2 ft beyond header -Provide fall protection for bedroom windows -Strap across cut top plates at front bedroom gable wall
Driveway Inspection Passed 4/22/2022 4/22/2022 04/25/2022
Misc
Informational
04/14/2022
4-12-22 AN. Forms are in place and aggregate is present and compacted
Misc
Informational
04/14/2022
Driveway was framed up with aggregate in and compacted. 4/14/22 ES
Misc
Informational
04/25/2022
4-25-22 AN driveway looks good and has expansion joints at curb and right of way
All Rough Inspection - Residential Passed 4/26/2022 4/26/2022 04/26/2022
Misc
Informational
04/26/2022
-Provide fall protection for bedroom windows. Check at final
Plot Plan Inspection Passed 9/2/2022 09/02/2022
Footing Inspection - Residential Passed 3/31/2023 03/31/2023
Informational
03/31/2023
FOOTING APPROVED BY ENGINEER
Sidewalk Inspection Failed 4/6/2023 04/06/2023
Misc
Corrective Action Required
04/06/2023
4-6-2023 NS. Site visited the sidewalk needs to be cleaned before I can do a final inspection.
Sidewalk Inspection Partial 4/20/2023 4/25/2023 04/25/2023
Misc
Corrective Action Required
04/06/2023
4-6-2023 NS. Site visited the sidewalk needs to be cleaned before I can do a final inspection. 4-25-23 NS the sidewalk has been cleaned but water meter has not been moved from being in the sidewalk. I will schedule this out to July
Sidewalk Inspection Not Ready 6/13/2023 6/13/2023 06/13/2023
Misc
Corrective Action Required
04/25/2023
4-6-2023 NS. Site visited the sidewalk needs to be cleaned before I can do a final inspection. 4-25-23 NS the sidewalk has been cleaned but water meter has not been moved from being in the sidewalk. I will schedule this out to July 6-13-23 NS Site visited for a sidewalk inspection pre-pour and the sidewalk had forms but did not have 4 inches of rock. Not ready I called and let the contractor know what he needs to do for it to pass.
Sidewalk Inspection Partial 6/13/2023 6/20/2023 06/20/2023
Misc
Corrective Action Required
06/13/2023
4-6-2023 NS. Site visited the sidewalk needs to be cleaned before I can do a final inspection. 4-25-23 NS the sidewalk has been cleaned but water meter has not been moved from being in the sidewalk. I will schedule this out to July 6-13-23 NS Site visited for a sidewalk inspection pre-pour and the sidewalk had forms but did not have 4 inches of rock. Not ready I called and let the contractor know what he needs to do for it to pass. 6-20-23 NS Site visited for a sidewalk inspection pre-pour and it appears that sidewalk passes pre-pour inspection. I will come back in a couple weeks to check the sidewalk ADA.
Sidewalk Inspection Passed 7/10/2023 7/20/2023 07/20/2023
Misc
Corrective Action Required
06/20/2023
4-6-2023 NS. Site visited the sidewalk needs to be cleaned before I can do a final inspection. 4-25-23 NS the sidewalk has been cleaned but water meter has not been moved from being in the sidewalk. I will schedule this out to July 6-13-23 NS Site visited for a sidewalk inspection pre-pour and the sidewalk had forms but did not have 4 inches of rock. Not ready I called and let the contractor know what he needs to do for it to pass. 6-20-23 NS Site visited for a sidewalk inspection pre-pour and it appears that sidewalk passes pre-pour inspection. I will come back in a couple weeks to check the sidewalk ADA. 7-20-23 NS Site visited and the sidewalk and driveway pass ADA standards.
Occupancy Inspection - Codes Residential Temporary C of O 7/20/2023 7/20/2023 07/20/2023
Corrective Action Required
07/20/2023
Corrective Action Required
07/20/2023
Corrective Action Required
07/20/2023
Erosion Control Inspection Residential Passed 7/24/2023 07/24/2023
DCM2 ESC DEFICIENT INSTALLATION
Resolved
07/24/2023
Occupancy Inspection - Codes Residential Full C of O 12/11/2023 12/11/2023
Documents & Images
Date Uploaded File Type Document Name
07/23/2021 Lot 110 Residental Permit Application_1
07/23/2021 Lot 110 License_Tax_Application
07/26/2021 Approved Plans Approved Drawings
07/26/2021 Permit Codes Residential Plan Review
08/18/2021 Plot Plan Approved Plot Plan
08/18/2021 Permit Codes Residential Plan Review
08/20/2021 Permit DS Building Permit
08/20/2021 Receipt Receipt for transaction: 2021-006704
09/15/2021 M L Crose 4709 NE Freehold Dr LSMO Monticello Lot 110 NZC P 2021-3827 3rd Party Footing Inspection Report Submittal 9-13-21
11/05/2021 Letter INSPECTION SUMMARY
11/05/2021 Letter INSPECTION SUMMARY
11/05/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
09/01/2022 Plot Plan Approved As Graded Plot Plan
09/02/2022 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/20/2023 Certificate/License Codes Temporary Certificate of Occupancy
07/24/2023 Letter INSPECTION SUMMARY
12/11/2023 Letter Codes Final Certificate of Occupancy
12/11/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home