Permit Application Status

PRRES20213320


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213320
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
06/28/2021
07/01/2021
12/25/2021
06/15/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,296.86 $1,296.86 Paid 07/01/2021
Right of Way Permit Fee $80.00 $80.00 Paid 07/01/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/01/2021
8331507-Sewer Connection Fee $630.00 $630.00 Paid 07/01/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 07/01/2021
Water Meter Fee $455.54 $455.54 Paid 07/01/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/9/2021 8/9/2021 08/09/2021
Underslab Plumbing Inspection - Residential Failed 9/15/2021 9/15/2021 09/15/2021
Misc
Corrective Action Required
09/15/2021
REMOVE ALL GRAVEL COVER FROM DWV, JOINT FITTINGS TO ALLOW FOR INSPECTION
Underslab Plumbing Inspection - Residential Passed 9/16/2021 9/16/2021 09/16/2021
Misc
Resolved
09/16/2021
Sewer Service Inspection - R Passed 10/26/2021 (8:15) 10/26/2021 10/26/2021
Water Service Inspection - R Passed 10/26/2021 (8:30) 10/26/2021 10/26/2021
Electrical Service Inspection Passed 2/8/2022 2/8/2022 02/08/2022
Gas Service Inspection - Residential Passed 2/8/2022 2/8/2022 02/08/2022
All Rough Inspection - Residential Failed 2/8/2022 2/8/2022 02/08/2022
Misc
Corrective Action Required
02/08/2022
-maintain gravel filter -address studs not full length front right and left of garage -nail off stud shoes at SE Cable in garage -strike plate at NM N garage corner -Protect NM within 6’ of attic access garage and 2nd floor -strap top plate above garage entry both sides -seal upward penetrations at garage entry -garage wall and bath 4 exterior wall not tied together -hanger at header above owners entry both ends (bath 4 entry wall to be non load bearing) -nail off h2.5 bath 4 -seal Unused hole bat 4 floor -Mid way strap all dwv 2” or less in diameter -truss hangers per plans in garage, bed 5, and at covered patio -furr out ductwork in pantry and fire block -fire block hvac chase right and left of fridge -fire block archway and kitchen /garage wall -fire block right and left of great room windows vertically to horizontally -provide support for dwv in joist space -seal bottom plated left of fire place -repair broken duct work in plumbing chase -address plans show dining door way to enter at foyer. Doorway at great room from dining in bearing wall -provide support for girder truss (2) h2.5 bed 2 -seal upward penetrations bed 2 -complete bath exhaust in all upstairs bathrooms -provide proper slope for dwv at bath 3 -protection plate for dwv at bath one studs -h2.5 at trusses above stairwell -nail all intersecting wall corners 12” OC see stairwell wall -add stud under double header at stair landing basement -anchor all steel columns -solid blocking for floor joists under kitchen island per plans -lvl in basement not per plans
All Rough Inspection - Residential Failed 2/14/2022 2/14/2022 02/14/2022
Misc
Corrective Action Required
02/08/2022
-maintain gravel filter -address studs not full length front garage corner -nail off stud shoes at SE Cable in garage -strike plate at NM N garage corner -Protect NM within 6’ of attic access garage and 2nd floor -strap top plate above garage entry BOTH SIDES -seal upward penetrations at garage entry -hanger at header above owners entry both ends (bath 4 entry wall to be non load bearing) -seal Unused holes bath 4 floor -truss hangers per plans in garage, bed 5, and at covered patio -furr out ductwork in pantry and fire block -fire block hvac chase right of fridge -fire block right of great room windows vertically to horizontally -seal bottom plated left of fire place -repair broken duct work in plumbing chase -address plans show dining door way to enter at foyer. Doorway at great room from dining in bearing wall -seal upward penetrations bed 2 near entry -complete bath exhaust in all upstairs bathrooms -provide proper slope for dwv at bath 3 -nail all intersecting wall corners 12” OC see stairwell wall landing to basement -nails both sides (4) lvl in basement
All Rough Inspection - Residential Failed 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
02/14/2022
-address studs not full length front garage corner -strike plate at NM N garage corner -truss hangers per plans in garage, bed 5, and at covered patio -fire block hvac chase right of fridge into furr down in garage
All Rough Inspection - Residential Passed 2/28/2022 2/28/2022 02/28/2022
Misc
Resolved
02/28/2022
-address studs not full length front garage corner -strike plate at NM N gara -truss hangers per plans in garage, bed 5, and at covered patio -fire block hvac chase
Driveway Inspection Passed 4/7/2022 4/7/2022 04/07/2022
Misc
Informational
04/07/2022
On Thursday, 4-07-2022 I performed and passed a drive approach inspection for concrete placement.
Sidewalk Inspection Passed 4/7/2022 4/7/2022 04/07/2022
Misc
Informational
04/07/2022
On Thursday, 4-07-2022 I performed and passed sidewalk inspection concrete placement.
Piers/Caissons Inspection - Residential Passed 5/19/2022 05/19/2022
Misc
Informational
05/19/2022
Addressed in third party footing inspection.
Occupancy Inspection - Codes Residential Failed 5/19/2022 5/19/2022 05/19/2022
Misc
Corrective Action Required
05/19/2022
- sod -seal all exterior penetrations -un cover water meter for inspection -submit as graded plot plan -address to be of contrasting colors -seal top of -guard rail as required by code at front stoop -security screws at back door -seal underneath furr out wall in garage -attic access cover -outlet at A/c not working -
Occupancy Inspection - Codes Residential Temporary C of O 5/26/2022 5/26/2022 05/26/2022
Misc
Corrective Action Required
05/19/2022
- sod -submit as graded plot plan -check water meter height at time of fine sod -guard rail at from a Stoop where more than 30” from ground 36” out.
Occupancy Inspection - Codes Residential Failed 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
05/26/2022
-submit as graded plot plan
Plot Plan Inspection Passed 6/15/2022 06/15/2022
Erosion Control Inspection Residential Passed 6/15/2022 06/15/2022
Occupancy Inspection - Codes Residential Full C of O 6/15/2022 6/15/2022 06/15/2022
Misc
Resolved
06/15/2022
-submit as graded plot plan
Documents & Images
Date Uploaded File Type Document Name
06/28/2021 HT #141 - PERMIT APP
06/28/2021 Approved Plans Approved Truss Layout
06/28/2021 Approved Plans Approved Truss Package
06/28/2021 Approved Plans Approved Drawings
06/28/2021 Permit Codes Residential Plan Review
06/30/2021 Plot Plan Approved Plot Plan
06/30/2021 Permit Codes Residential Plan Review
07/01/2021 Permit DS Building Permit
07/01/2021 Receipt Receipt for transaction:2021-005264
08/09/2021 141 Hawthorne Ridge FTNG
08/09/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/16/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/11/2022 HT 141 Framing Revision (002)
02/14/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter Codes Temporary Certificate of Occupancy
06/13/2022 Letter INSPECTION SUMMARY
06/14/2022 Plot Plan Approved As Graded Plot Plan
06/15/2022 Letter Codes Final Certificate of Occupancy
06/15/2022 Letter Field Certificate of Occupancy
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: