Permit Application Status

PRRES20212067


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212067
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
04/28/2021
04/28/2021
10/07/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
CRAIG@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/30/2021 04/28/2021
Kim Brennan
Residential Plan Review Approved 04/30/2021 04/28/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,058.61 $1,058.61 Paid 04/28/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/28/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 04/28/2021
8331504-EFHB Middle Big Creek, Full $502.20 $502.20 Paid 04/28/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 04/28/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/28/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/28/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/12/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $100.00 $100.00 Paid 09/12/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/3/2021 8/3/2021 08/03/2021
Misc
Informational
08/03/2021
APPROVED PER BRADLEY HUXOL 7/7/21
Underslab Plumbing Inspection - Residential Passed 8/3/2021 8/3/2021 08/03/2021
Sewer Service Inspection - R Passed 11/8/2021 (10:00) 11/8/2021 11/08/2021
Water Service Inspection - R Partial 11/9/2021 11/09/2021
Misc
Informational
11/09/2021
pex ran 20' from foundation
Water Service Inspection - R Passed 11/10/2021 (11:30) 11/10/2021 11/10/2021
Misc
Resolved
11/10/2021
pex ran 20' from foundation
Erosion Control Inspection Residential Failed 11/10/2021 11/10/2021 11/10/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/10/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 3/8/2022 3/8/2022 03/08/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/08/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/08/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. ADDRESS EROSION CONTROL ON LOT GRAVEL FILTER REQUIRED, MIN 6" LIFT 3/4" GRAVEL CLEAN ALL MUD FROM STREET
Electrical Service Inspection Passed 3/30/2022 3/30/2022 03/30/2022
Gas Service Inspection - Residential Failed 3/30/2022 3/30/2022 03/30/2022
Misc
Corrective Action Required
03/30/2022
Gas line bond required
All Rough Inspection - Residential Failed 3/30/2022 3/30/2022 03/30/2022
Misc
Corrective Action Required
03/30/2022
-No approved truss plans on site, have at reinspection, corrections list subject to change -Exterior not inspected at first rough, will inspect at reinspection, corrections list subject to change -nail all exterior sheathing at garage PFH per plans -all sheathing splices within the garage portal PFH must be within the middle 24” of the portal leg -tighten all anchor bolts -anchor bolts required within 12” of plate break at garage and basement -address the rafters on (5) block for covered front porch framing, required to land on top plate per code -support ridge at ends front covered porch -fur out at HVAC garage wall to allow for insulation -secure all NM at garage,laundry per code -fireblock between studs at ceiling soffit line 2x6 wall garage -Install H2.5 truss hold down clips all trusses throughout -Instal H2.5 truss clips on both sides of triple/dbl girder trusses -address stud overnotched at anchor bolt, sgl car bay east corner -12” oc nailing at all abutting and intersecting wall corner -support all DWV every 48” oc -top plate to top plate corner connection as required by code, great room exterior wall connection to breakfast and master bedroom corners -fireblock fireplace master bed wall above top plate open to attic space -fireblock between furring strips at top plate garage wall -top plate to top plate corner connection as required by code at front entry wall -nail all exterior sheathing per plans, there are nails that missed a lot of studs throughout -min 24” offset required between plate breaks - see front bedroom, master closet -nail protection plates all NM 1 1/4” or less from end of plate, see master closet -nail all girder trusses together per plans -address the dbl girder truss that spans along master bed wall to front entry has (1) ply not supported at plate for bearing below -LIB bracing laundry per plans -CS-PF bracing at dining room windows sliding glass door and master bedroom per plans, nail all exterior sheathing per plans -WSP bracing per plans at interior of fireplace, extend interior WSP panel to interior edge of wall per plans Add joist hangers to joist connection to dbl rim joist above great room windows -plans show storage at NW corner basement unfinished but looks like it is being finished? If this room is being finished complete framing and revise plans -fireblock vertical every 10’ between studs and foundation/framing at finished basement -fireblock vertical to horizontal at furred down soffit ends -fur down for HVAC at basement den -sister 2x6 studs to studs at basement that have been overnotched around anchor bolts -add protection plate at top plate pex, basement bedroom -fireblock top plate at duct basement bedroom closet -Is the unfinished mechanical being finished? If so fireblock and complete framing, plans will need to be revised -add joist hangers at joist to trpl rim joist connect basement bed#3 -nail all dbl joists together per code -fireblock between top plates at dbl wall basement bath -provide (2) 2x4 trimmer studs at basement bed #4 door to bath per plans -fireblock between top plate and foundation wall/framing finished basement, block all annular spaces and seal all penetrations through fireblock material -Gas line bond required
Erosion Control Inspection Residential Partial 3/30/2022 3/30/2022 03/30/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
03/30/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. ADDRESS EROSION CONTROL ON LOT GRAVEL FILTER REQUIRED, MIN 6" LIFT 3/4" GRAVEL CLEAN ALL MUD FROM STREET
Misc
Corrective Action Required
03/30/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Gas Service Inspection - Residential Passed 4/18/2022 4/18/2022 04/18/2022
Misc
Resolved
04/18/2022
All Rough Inspection - Residential Failed 4/18/2022 4/18/2022 04/18/2022
Misc
Corrective Action Required
03/30/2022
-provide deck ledger attachment to house per code -(2) 1/2” through bolts required at each post/beam connection at deck per code -provide truss hangers at B7 truss per plans -provide all truss lateral bracing per plans -address the rafters on (5) block for covered front porch framing, required to land on top plate per code (upload engineer letter to portal) -Install H2.5 truss clips on both sides of triple/dbl girder trusses (both end plys) -top plate to top plate corner connection as required by code, great room exterior wall to master bedroom corners -fireblock between furring strips at top plate garage wall (open to attic space) -min 24” offset required between plate breaks - see master closet -address the D1 dbl girder truss that spans along master bed wall to front entry has (1) ply not supported at plate for bearing below -CS-PF bracing at dining room windows sliding glass door and master bedroom per plans, nail all exterior sheathing per plans (nail all exterior sheathing per plans/IRC R602.10.6.4) -WSP bracing per plans at interior of fireplace, extend interior WSP panel to interior edge of wall per plans (upload engineer report to portal, make all corrections and nail sheathing per the engineer letter) -Add joist hangers to joist connection to dbl rim joist above great room windows -plans show storage at NW corner basement unfinished but looks like it is being finished? If this room is being finished complete framing and revise plans -fireblock vertical every 10’ between studs and foundation/framing at finished basement -fireblock top plate at duct basement bedroom closet -Is the unfinished mechanical being finished? If so fireblock and complete framing, plans will need to be revised -add joist hangers at joist to trpl rim joist connect basement bed#3 -provide (2) 2x4 trimmer studs at basement bed #4 door to bath per plans (shim the trimmers short of header to provide bearing)
Erosion Control Inspection Residential Partial 4/18/2022 4/18/2022 04/18/2022
Misc
Corrective Action Required
03/30/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Erosion Control Inspection Residential Partial 5/4/2022 5/4/2022 05/04/2022
Misc
Corrective Action Required
04/18/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 5/4/2022 5/4/2022 05/04/2022
Misc
Corrective Action Required
04/18/2022
-Have engineer clarify requirements for braced wall changes submitted at great room exterior wall, nail all exterior sheathing per engineer letter -fireblock top plate at duct basement bedroom closet
All Rough Inspection - Residential Not Ready 5/9/2022 5/9/2022 05/09/2022
Misc
Corrective Action Required
05/04/2022
-Have engineer clarify requirements for braced wall changes submitted at great room exterior wall, nail all exterior sheathing per engineer letter **5/9/22 HAVE NOT RECEIVED ANY DOCUMENTATION FOR CLARIFICATION OF ENGINEER LETTER WE DISCUSSED ON SITE AT LAST ROUGH INSPECTION 5/4/22 OK TO INSULATE
All Rough Inspection - Residential Passed 5/11/2022 5/11/2022 05/11/2022
Misc
Resolved
05/11/2022
Erosion Control Inspection Residential Partial 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/04/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Driveway Inspection Partial 06/22/2022
Misc
Informational
06/22/2022
On 6.23.2022 Wednesday I performed a driveway inspection and pass the sub-grade to pour concrete.
Sidewalk Inspection Partial 6/22/2022 6/22/2022 06/22/2022
Misc
Informational
06/22/2022
On 6.22.2022 Wednesday I performed a sidewalk inspection and pass the sub-grade to pour concrete.
Occupancy Inspection - Codes Residential Failed 8/18/2022 8/18/2022 08/18/2022
Misc
Corrective Action Required
08/18/2022
-resolve outstanding inspection fees -final driveway and sidewalk inspections required contact development services to schedule -final grade and sod -splash blocks -provide code compliant deck ledger lags, truss structural screws not approved for deck ledger attachment -install attic access cover garage -label all breaker locations -provide ladder basement egress well
Driveway Inspection Passed 9/1/2022 9/1/2022 09/01/2022
Misc
Informational
06/22/2022
On 6.23.2022 Wednesday I performed a driveway inspection and pass the sub-grade to pour concrete. 9-1-22 RH. Driveway meets LS and ADA Specification.
Sidewalk Inspection Passed 9/1/2022 9/1/2022 09/01/2022
Misc
Informational
06/22/2022
On 6.22.2022 Wednesday I performed a sidewalk inspection and pass the sub-grade to pour concrete. 9-1-22 RH. Sidewalk meets LS and ADA Specification.
Occupancy Inspection - Codes Residential Ready for Temp CO 9/9/2022 9/9/2022 09/09/2022
Misc
Corrective Action Required
08/18/2022
-resolve outstanding inspection fees -final grade and sod -splash blocks
Occupancy Inspection - Codes Residential Temporary C of O 9/12/2022 09/12/2022
Misc
Corrective Action Required
09/09/2022
-resolve outstanding inspection fees -final grade and sod -splash blocks
Erosion Control Inspection Residential Passed 9/29/2022 9/29/2022 09/29/2022
Misc
Resolved
09/29/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Occupancy Inspection - Codes Residential Failed 9/29/2022 9/29/2022 09/29/2022
Misc
Corrective Action Required
09/12/2022
-splash blocks -clean all construction debris and old silt fence behind rear lot
Plot Plan Inspection Passed 10/7/2022 10/7/2022 10/07/2022
Occupancy Inspection - Codes Residential Full C of O 10/7/2022 10/7/2022 10/07/2022
Misc
Resolved
10/07/2022
Documents & Images
Date Uploaded File Type Document Name
04/28/2021 Application Form Permit Application and License Tax Form
04/28/2021 Approved Plans Approved Drawings
04/28/2021 Approved Plans Approved Truss Layout
04/28/2021 Approved Plans Approved Truss Package
04/28/2021 Receipt Receipt for transaction:2021-002317
04/28/2021 Letter DS Building Permit
06/17/2021 RR #75 - Scope of Work Statement
06/17/2021 Plot Plan Approved Revised Plot Plan
08/02/2021 75 Reserve at Stoney Creek FTNG
08/03/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
05/04/2022 75 Reserve at Stoney Creek - Letter
05/04/2022 75 Reserve at Stoney Creek Field Issue2
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
05/10/2022 75 Reserve at Stoney Creek Field Issue - REV
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/12/2022 Receipt Receipt for transaction:2022-007445
09/12/2022 Letter Codes Temporary Certificate of Occupancy
09/29/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter Field Certificate of Occupancy
10/07/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home