Permit Application Status

PRRES20211944


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211944
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 08/13/2021 12:00 AM by username 'Robb Popp'. STOP WORK ORDER removed on 08/20/2021 12:00 AM by username 'Patrick Schonfeldt'.
04/21/2021
06/16/2021
10/19/2021
07/14/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
JIM@SABHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 05/19/2021 05/17/2021
Kim Brennan
Right-of-way
Corrective Action Required
05/17/2021

The right-of-way with dimensions must be provided on the plot plan. Please add street name and ROW dimensions.
Sidewalks
Corrective Action Required
05/17/2021

Sidewalks with dimensions must be provided on the plot plan.
Drainage swales/berms
Corrective Action Required
05/17/2021

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
As-graded plot plan
Corrective Action Required
05/17/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 05/19/2021 05/17/2021
Kim Brennan
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
05/17/2021

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Plot Plan Review Rejected 04/26/2021 04/22/2021
Kim Brennan
Right-of-way
Corrective Action Required
04/22/2021

The right-of-way with dimensions must be provided on the plot plan. Please add street name and ROW dimensions.
Sidewalks
Corrective Action Required
04/22/2021

Sidewalks with dimensions must be provided on the plot plan.
Drainage swales/berms
Corrective Action Required
04/22/2021

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
As-graded plot plan
Corrective Action Required
04/22/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Rejected 04/26/2021 04/22/2021
Kim Brennan
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
04/22/2021

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,276.40 $1,276.40 Paid 06/15/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/15/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/15/2021
8331507-Sewer Connection Fee $480.00 $480.00 Paid 06/15/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/15/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/15/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/01/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/01/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/01/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/01/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/01/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/08/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 8/20/2021 (8:00) 8/20/2021 08/13/2021
Miscellaneous Correction
Corrective Action Required
08/13/2021
-No erosion control present. See photo attached to permit. 3rd party footing denied. -Provide erosion control within 2 days
Erosion Control Inspection Residential Passed 8/20/2021 08/20/2021
Footing Inspection - Residential Passed 8/20/2021 08/20/2021
Miscellaneous Correction
Corrective Action Required
08/13/2021
APPROVED PER DAVID P AINSWORTH 8/12/21
Sewer Service Inspection - R Partial 9/24/2021 (1:15) 9/24/2021 09/24/2021
Misc
Informational
09/24/2021
Partial from house to clean out across driveway. Ok to cover what has been inspected.
Sewer Service Inspection - R Passed 9/27/2021 (10:00) 9/27/2021 09/27/2021
Misc
Resolved
09/27/2021
Water Service Inspection - R Passed 9/28/2021 (10:45) 9/28/2021 09/28/2021
Underslab Plumbing Inspection - Residential Passed 10/4/2021 10/4/2021 10/04/2021
Miscellaneous Correction
Corrective Action Required
10/04/2021
-Maintain gravel filter and silt fence
Piers/Caissons Inspection - Residential Passed 10/19/2021 (8:15) 10/19/2021 10/19/2021
All Rough Inspection - Residential Not Ready 2/9/2022 2/9/2022 02/09/2022
Misc
Corrective Action Required
02/09/2022
INSPECTION DENIED -maintain erosion control and gravel filter -provide city stamped plans on site -remove all insulation for inspection
Erosion Control Inspection Residential Failed 2/9/2022 2/9/2022 02/09/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/09/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 2/11/2022 02/11/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/09/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/11/2022 1:55 PM
All Rough Inspection - Residential Not Ready 2/11/2022 2/11/2022 02/11/2022
Misc
Corrective Action Required
02/09/2022
INSPECTION DENIED -maintain erosion control and gravel filter -provide city stamped plans on site -remove all insulation for inspection
Misc
Corrective Action Required
02/11/2022
ALL LISTED ITEMS STILL NOT IN COMPLIANCE Mitchell Schwarz 02/11/2022 1:54 PM
All Rough Inspection - Residential Not Ready 2/17/2022 2/17/2022 02/17/2022
Misc
Corrective Action Required
02/11/2022
INSPECTION DENIED -maintain erosion control and gravel filter -provide city stamped plans on site -remove all insulation for inspection ALL INSULATION NEED BE REMOVED BEFORE INSPECTION Mitchell Schwarz 02/17/2022 11:04 AM
Misc
Corrective Action Required
02/11/2022
ALL LISTED ITEMS STILL NOT IN COMPLIANCE Mitchell Schwarz 02/11/2022 1:54 PM
All Rough Inspection - Residential Not Ready 2/24/2022 2/24/2022 02/24/2022
Misc
Corrective Action Required
02/17/2022
INSPECTION DENIED -maintain erosion control and gravel filter -provide city stamped plans on site -remove all insulation for inspection ALL INSULATION NEED BE REMOVED BEFORE INSPECTION Mitchell Schwarz 02/17/2022 11:04 AM
Misc
Corrective Action Required
02/17/2022
ALL LISTED ITEMS STILL NOT IN COMPLIANCE Mitchell Schwarz 02/11/2022 1:54 PM
Misc
Corrective Action Required
02/24/2022
home still insulated Remove ALL insulation from home
Erosion Control Inspection Residential Failed 3/7/2022 03/07/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/11/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/11/2022 1:55 PM
Misc
Corrective Action Required
03/07/2022
MAINTAIN EROSION CONTROL AND GRAVEL FILTER Mitchell Schwarz 03/07/2022 11:11 AM
All Rough Inspection - Residential Not Ready 3/8/2022 3/8/2022 03/08/2022
Misc
Corrective Action Required
02/24/2022
INSPECTION DENIED -provide city stamped plans on site -remove all insulation for inspection ALL INSULATION NEED BE REMOVED BEFORE INSPECTION Mitchell Schwarz 02/17/2022 11:04 AM
Misc
Corrective Action Required
02/24/2022
ALL LISTED ITEMS STILL NOT IN COMPLIANCE Mitchell Schwarz 02/11/2022 1:54 PM
Misc
Corrective Action Required
02/24/2022
home still insulated Remove ALL insulation from home
Misc
Corrective Action Required
03/08/2022
HOME IS STILL INSULATED DO NOT RESCEDULE UNTIL ALL INSULATION IS REMOVED Mitchell Schwarz 03/08/2022 8:54 AM
Gas Service Inspection - Residential Passed 3/9/2022 03/09/2022
Electrical Service Inspection Passed 3/9/2022 03/09/2022
All Rough Inspection - Residential Failed 3/9/2022 3/9/2022 03/09/2022
Misc
Resolved
03/09/2022
INSPECTION DENIED -provide city stamped plans on site -remove all insulation for inspection ALL INSULATION NEED BE REMOVED BEFORE INSPECTION Mitchell Schwarz 02/17/2022 11:04 AM
Misc
Resolved
03/09/2022
ALL LISTED ITEMS STILL NOT IN COMPLIANCE Mitchell Schwarz 02/11/2022 1:54 PM
Misc
Resolved
03/09/2022
home still insulated Remove ALL insulation from home
Misc
Resolved
03/09/2022
HOME IS STILL INSULATED DO NOT RESCEDULE UNTIL ALL INSULATION IS REMOVED Mitchell Schwarz 03/08/2022 8:54 AM
Misc
Corrective Action Required
03/09/2022
-Properly secure fire place -seal penetrations at fire place for csst,low voltage & water -support Dwv above owners entry bath -add stud at center return air in owners entry bath load bearing wall -remove covering for covered front and back patio so show framing for inspection -security blocking at back door -strap BOTH top plates above lvl in gray room. Right and left end (2 places) -strap top plate where not lapped 24” bed 2 NW corner -nail intersecting wall corners master closet and front entry wall -protect NM within 6ft of attic access -provide protection for dwv at hvac chase -provide double joist hanger near ufer ground -double joist under kitchen island per plan
All Rough Inspection - Residential Failed 3/11/2022 3/11/2022 03/11/2022
Misc
Corrective Action Required
03/09/2022
-seal penetrations at fire place for csst,low voltage & water -support Dwv above owners entry bath -add stud at center return air in owners entry bath load bearing wall -remove covering for covered front and back patio so show framing for inspection -provide protection for dwv at hvac chase
All Rough Inspection - Residential Passed 3/15/2022 3/15/2022 03/15/2022
Misc
Resolved
03/15/2022
-seal penetrations at fire place for csst,low voltage & water -remove covering for covered front and back patio so show framing for inspection
Driveway Inspection Partial 4/27/2022 04/27/2022
Misc
Informational
04/27/2022
On 4.26.2022 I performed a driveway inspection and pass the subgrade to pour concrete.
Sidewalk Inspection Partial 4/27/2022 4/27/2022 04/27/2022
Misc
Informational
04/27/2022
On 4.27.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete.
Occupancy Inspection - Codes Residential Failed 6/30/2022 6/30/2022 06/30/2022
Miscellaneous Correction
Corrective Action Required
06/30/2022
Provide front door hardware Uncover smoke detectors Wiring at door bell exposed Step to patio over 7 3/4” and more than 3/8” variance on risers Entry at garage must latch Provide lock outs in electrical panel Land trace wire at grade Sump discharge minimum of 36” from foundation Final grading and sod Splash blocks Seal exterior penetrations Seal meter can and A/ C disconnect Sidewalk inspection pending Driveway inspection pending Pay fees Obtain irrigation permit and submit back flow certification if installing
Erosion Control Inspection Residential Failed 6/30/2022 06/30/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/30/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
06/30/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 02/11/2022 1:55 PM
Misc
Resolved
06/30/2022
MAINTAIN EROSION CONTROL AND GRAVEL FILTER Mitchell Schwarz 03/07/2022 11:11 AM
Miscellaneous Correction
Corrective Action Required
06/30/2022
Maintain erosion control at front of lot until sod is down
Driveway Inspection Passed 07/01/2022
Misc
Informational
04/27/2022
On 4.26.2022 I performed a driveway inspection and pass the subgrade to pour concrete. 7.1.2022 Driveway appears to compliant
Sidewalk Inspection Passed 07/01/2022
Misc
Informational
04/27/2022
On 4.27.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete. 7.1.2022 Sidewalk appears to be compliant
Occupancy Inspection - Codes Residential Ready for Temp CO 7/8/2022 7/8/2022 07/08/2022
Miscellaneous Correction
Corrective Action Required
06/30/2022
Final grading and sod Splash blocks
Occupancy Inspection - Codes Residential Temporary C of O 7/8/2022 07/08/2022
Misc
Corrective Action Required
07/08/2022
TCO paid for so i am generating this letter in repsonce to Jim's email. Final grading and sod Splash blocks
Plot Plan Inspection Passed 7/14/2022 07/14/2022
Erosion Control Inspection Residential Passed 07/14/2022
Miscellaneous Correction
Resolved
07/14/2022
Maintain erosion control at front of lot until sod is down
Occupancy Inspection - Codes Residential Full C of O 7/14/2022 7/14/2022 07/14/2022
Misc
Resolved
07/14/2022
Documents & Images
Date Uploaded File Type Document Name
04/21/2021 Application Form Permit Application
04/21/2021 Application Form License Tax Form
04/22/2021 Letter Codes Residential Plan Review
05/17/2021 Approved Plans Approved Drawings
05/17/2021 Plot Plan Approved Plot Plan
06/15/2021 Permit DS Building Permit
06/15/2021 Receipt Receipt for transaction:2021-004461
08/13/2021 M L Crose 2354 SW Old Port Rd LSMO Eagle Creek Lot 721 SAB Permit 2021-1944 3rd Party Footing Inspection Report 8-12-21
08/13/2021 Letter Stop Work Order
08/13/2021 8-14-21 footing inspection .jpeg
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/27/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
10/04/2021 Letter INSPECTION SUMMARY
10/19/2021 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/17/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
03/07/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/09/2022 Letter INSPECTION SUMMARY
03/09/2022 Letter INSPECTION SUMMARY
03/09/2022 Letter INSPECTION SUMMARY
03/11/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
06/20/2022 Plot Plan Approved As Graded Plot Plan
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/01/2022 Receipt Receipt for transaction:2022-005458
07/08/2022 Receipt Receipt for transaction:2022-005600
07/08/2022 Letter Codes Temporary Certificate of Occupancy
07/14/2022 Letter Codes Final Certificate of Occupancy
07/14/2022 Letter Field Certificate of Occupancy
07/14/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home