Permit Application Status

PRRES20211709


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211709
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
04/09/2021
04/19/2021
10/13/2021
10/07/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
CURTIS@SABHOMES.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/20/2021 04/16/2021
Brandon Kalwei
Basement elevation
Corrective Action Required
04/16/2021

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) trying to clarify basement, it say's daylight and under deck it says walkout, walk-out walkup?
As-graded plot plan
Corrective Action Required
04/16/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 04/20/2021 04/16/2021
Brandon Kalwei
Misc
Corrective Action Required
04/16/2021

Plans show walkout basement, plot plan and MDP show daylight, need letter from design profesional saying that walkout is okay
Plot Plan Review Rejected 04/14/2021 04/12/2021
Brandon Kalwei
Basement elevation
Corrective Action Required
04/12/2021

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) trying to clarify basement, it say's daylight and under deck it says walkout, walk-out walkup?
As-graded plot plan
Corrective Action Required
04/12/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Rejected 04/14/2021 04/12/2021
Brandon Kalwei
Misc
Corrective Action Required
04/12/2021

Plans show walkout basement, plot plan and MDP show daylight, need letter from design profesional saying that walkout is okay
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,094.78 $1,094.78 Paid 04/19/2021
8331507-Sewer Connection Fee $480.00 $480.00 Paid 04/19/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/19/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/19/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/19/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/19/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
repair erosion control. clean gravel out of street recall for inspection
Footing Inspection - Residential Passed 7/30/2021 07/30/2021
Informational
07/30/2021
Footing approved by David Ainsworth on 7-1-21
Underslab Plumbing Inspection - Residential Passed 7/30/2021 7/30/2021 07/30/2021
Misc
Resolved
07/30/2021
repair erosion control. clean gravel out of street recall for inspection
Piers/Caissons Inspection - Residential Passed 8/27/2021 08/27/2021
Misc
Informational
08/27/2021
(3) 24 X 36 PIERS
Sewer Service Inspection - R Passed 9/30/2021 (10:15) 9/30/2021 09/30/2021
Water Service Inspection - R Passed 12/14/2021 (9:45) 12/14/2021 12/14/2021
Electrical Service Inspection Passed 1/18/2022 1/18/2022 01/18/2022
Gas Service Inspection - Residential Passed 1/18/2022 1/18/2022 01/18/2022
All Rough Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-Boca plate protection for dwv in basement to extend 2” above bottom plate -anchor bolts within 12” of plate breaks -provide 1 1/2” bearing on bottom of rafter at sheathed valley -provide 75% bearing at hip to wall connection -remove roof support to ceiling joist in garage, move to bearing wall (ridge and hip above garage entry door) -provide collar ties per code -fire stop garage to stairway dead space -address roof lid landing on ceiling joist over laundry/pantry -strap top plate breaks rear garage wall where breaks less that 24” apart -solid block cripple wall above great room/kitchen -strap top plate with rear family room and dining room meet -address thermostat wiring in return air -uncover covered deck for inspection -provide (2) 1/2” through bolts at deck post to beam connections -provide supposed for furr down joist -address over notched studs west basement wall -seal penetrations in vertical to horizontal fire blocking -vertical to horizontal fire blocking every 10’ see sw wall -provide fire blocking at furred down ends and beam ends in basement -basement bearing wall add header and stud where top plates cut -provide protection for ward flex above basement stairs -provide stud pack per plans -provide 3” bearing on lvl to exterior wall bearing to basement floor
All Rough Inspection - Residential Failed 3/23/2022 3/23/2022 03/23/2022
Misc
Corrective Action Required
01/18/2022
-fire stop garage to stairway dead space (seal all gaps -uncover covered deck for inspection -provide (2) 1/2” through bolts at deck post to beam connections -address over notched studs west basement wall -seal penetrations in vertical to horizontal fire blocking -provide fire blocking at furred down ends and beam ends in basement -basement bearing wall and stud where top plate cut for return air (and protect NM at this location)
All Rough Inspection - Residential Passed 3/29/2022 3/29/2022 03/29/2022
Misc
Resolved
03/29/2022
-provide (2) 1/2” through bolts at deck post to beam connections -seal penetrations in vertical to horizontal fire blocking -basement bearing wall and stud where top plate cut for return air (and protect NM at this location)
Erosion Control Inspection Residential Failed 3/29/2022 03/29/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/29/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter maintain silt fence Mitchell Schwarz 03/29/2022 2:33 PM
Driveway Inspection Partial 5/20/2022 05/20/2022
Misc
Informational
05/20/2022
Driveway was framed up with aggregate in and compacted. 5/20/22 ES
Driveway Inspection Passed 5/27/2022 5/27/2022 05/27/2022
Misc
Informational
05/20/2022
Driveway was framed up with aggregate in and compacted. 5/20/22 ES
Misc
Informational
05/27/2022
Driveway meets LS and ADA spec. 5/27/22 ES
Plot Plan Inspection Passed 8/22/2022 08/22/2022
Erosion Control Inspection Residential Failed 8/22/2022 08/22/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
08/22/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter maintain silt fence Mitchell Schwarz 03/29/2022 2:33 PM
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/22/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. erosion control to remain in place until sod
Occupancy Inspection - Codes Residential Failed 9/23/2022 9/23/2022 09/23/2022
Misc
Corrective Action Required
09/23/2022
-Open electrical box at garage door exterior -Provide handrail at garage entry -Anchor column base at mechanical room -Provide ledger to house connection per code -Provide missing joist hangers at deck
Erosion Control Inspection Residential Passed 09/23/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
09/23/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. erosion control to remain in place until sod
Occupancy Inspection - Codes Residential Failed 09/23/2022
Misc
Corrective Action Required
09/23/2022
-Open electrical box at garage door exterior -Provide handrail at garage entry -Anchor column base at mechanical room -Provide ledger to house connection per code -Provide missing joist hangers at deck -Obtain irrigation permit and backflow certification
Occupancy Inspection - Codes Residential Failed 9/29/2022 9/29/2022 09/29/2022
Misc
Corrective Action Required
09/23/2022
-Obtain irrigation permit and backflow certification
Occupancy Inspection - Codes Residential Full C of O 10/7/2022 10/7/2022 10/07/2022
Misc
Resolved
10/07/2022
-Obtain irrigation permit and backflow certification
Documents & Images
Date Uploaded File Type Document Name
04/09/2021 Application Form APPLICATION
04/09/2021 Application Form excise tax
04/09/2021 E729 - Air Combustion Calculation
04/09/2021 E729 - Final Plot Plan
04/09/2021 E729 - Final Engineered Plans 4_9_21
04/12/2021 Letter Codes Residential Plan Review
04/12/2021 Plot Plan APPROVED PLOT PLAN
04/12/2021 Approved Plans APPROVED PLANS
04/16/2021 E729 - Olsson Letter
04/16/2021 Engineer Report/Study ENGINEER REPORT
04/19/2021 Receipt Receipt for transaction:2021-002050
04/19/2021 Letter DS Building Permit
07/02/2021 M L Crose 2357 SW Old Port Rd LSMO Eagle Creek Lot 729 SAB Homes P 2021-1709 3rd Party Footing Inspection Report 7-1-21
07/23/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
08/19/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter Field Certificate of Occupancy
10/07/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home