Summary
PRRES20211296
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - UNINFISHED BASEMENT STOP WORK ORDER generated on 03/29/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 04/12/2022 12:00 AM by username 'Diana Johnson'.
03/23/2021
03/25/2021
08/09/2022
Locations
Contacts
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
BILL KENNEY & ASSOCIATES, Address:P O BOX 291, Phone:(816) 838-0552  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
BILLKENNEY9@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/26/2021 03/24/2021
Brandon Kalwei
Residential Plan Review Approved 03/26/2021 03/24/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,412.52 $1,412.52 Paid 03/25/2021
8331507-Sewer Connection Fee $510.00 $510.00 Paid 03/25/2021
Right of Way Permit Fee $80.00 $80.00 Paid 03/25/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/25/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 03/25/2021
Water Meter Fee $455.54 $455.54 Paid 03/25/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Passed 8/4/2021 (11:00) 8/4/2021 08/04/2021
Electrical Service Inspection Passed 9/21/2021 9/21/2021 09/21/2021
Gas Service Inspection - Residential Passed 9/21/2021 9/21/2021 09/21/2021
All Rough Inspection - Residential Failed 9/21/2021 9/21/2021 09/21/2021
Misc
Corrective Action Required
09/21/2021
-No under slab inspection performed, dye test required before reinspect on all rough -fur down for duct at garage beam -Supoort ridge at garage -Tighten all anchor bolts at garage -pan off cantilevers at garage -fir out HVAC for insulation at garage ceiling and wall -seal all top plate penetrations at garage -Add boots at roof Vent penetrations garage -Fireblock deadspace between shower and kitchen wall 1st floor bath -seal all penetrations through air returns -Install back door at patio -Fireblock vertical to horizontal at DWV/pex chase great room -Install floor receptacle at great room -Land NM to box bundled up at great room ceiling near fireplace -add stud shoes DWV kitchen exterior wall -Floor joist at great room notched for trap with DWV bored less than 2” from notch, pex is also bored less than 2” from DWV bore-replace or submit engineer letter for field fix -support all vertical DWV 2” or less at mid point -Add joist hangers at ceiling joists to dbl 2x10 at bed#3 hall, bed#3 entry wall is not load bearing -Header cut studs at master bath HVAC/b vent box out chase, fireblock between studs at wall open for vertical to horizontal at attic space -Color code GEC at service panel and UFER -Land NM to box at furnace -Anchor all SCH 40 steel columns to floor at basement -Address sewer clean out under basement stair not accessible
Footing Inspection - Residential Passed 9/21/2021 9/21/2021 09/21/2021
Misc
Informational
09/21/2021
FOOTING APPROVED PER DAVID AINSWORTH 5/3/21
Underslab Plumbing Inspection - Residential Failed 9/21/2021 9/21/2021 09/21/2021
Misc
Corrective Action Required
09/21/2021
BASEMENT SLAB POURED WITHOUT INSPECTION OF UNDERSLAB PLUMBING, DYE TEST REQUIRED TO BE PERFORMED BEFORE ALL ROUGH REINSPECT
Sewer Service Inspection - R Passed 9/30/2021 (1:00) 9/30/2021 09/30/2021
Underslab Plumbing Inspection - Residential Failed 9/30/2021 9/30/2021 09/30/2021
Misc
Corrective Action Required
05/02/2022
9/30/21 - INSPECTED DYE TEST FOR UNDERSLAB PLUMBING WASTE PERFORMED BY PLUMBING CONTRACTOR, DYE TEST ACCEPTABLE, NO VISUAL INSPECTION OF UNDERSLAB PLUMBING PERFORMED, UNDERSLAB WAS POURED WITHOUT INSPECTION SUBMIT LETTERS FROM BUILDER, PLUMBER, AND INTERIOR DRAIN TILE CONTRACTORS AS REQUESTED BY INSPECTION MANAGER MARK HARDING
Water Service Inspection - R Passed 10/4/2021 (10:30) 10/4/2021 10/04/2021
All Rough Inspection - Residential Failed 10/11/2021 10/11/2021 10/11/2021
Misc
Corrective Action Required
09/21/2021
-fir out and down at HVAC for insulation at garage ceiling and wall -add stud shoes DWV kitchen exterior wall -secure all vertical DWV 2” or less at mid point -see 2nd floor **OK TO INSULATE**
All Rough Inspection - Residential Passed 10/15/2021 10/15/2021 10/15/2021
Misc
Resolved
10/15/2021
Driveway Inspection Passed 11/30/2021 12/03/2021
Misc
Informational
11/30/2021
On Tuesday 11/30/2021 I performed a driveway inspection and pass the subgrade to pour concrete
Erosion Control Inspection Residential Failed 3/16/2022 03/16/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sidewalk Inspection Partial 4/12/2022 04/12/2022
Misc
Informational
04/12/2022
On Tuesday 4.12.2021 I performed A sidewalk inspection and pass the subgrade to pour concrete Erosion control installed on property front yard.
Erosion Control Inspection Residential Failed 4/13/2022 04/13/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
04/13/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Resolved
04/13/2022
Erosion control still not in compliance Mitchell Schwarz 03/29/2022 3:02 PM
Misc
Corrective Action Required
04/13/2022
Clean storm inlet
Erosion Control Inspection Residential Passed 4/29/2022 04/29/2022
Misc
Resolved
04/29/2022
Erosion Control Inspection Residential Passed 3/29/2022 04/29/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
03/29/2022
Erosion control still not in compliance Mitchell Schwarz 03/29/2022 3:02 PM
Occupancy Inspection - Codes Residential Failed 4/29/2022 4/29/2022 04/29/2022
Miscellaneous Correction
Corrective Action Required
04/29/2022
- Driveway inspection pending - Final grading and sod - Provide Splash blocks - Irrigation incomplete - kitchen island outlets dead - Outlets in garage not tripping gfci - Smoke detectors have dust covering on - Label all non GFCI outlets - Missing screw back door hing - Sump discharge minimum of 36” from foundation
Underslab Plumbing Inspection - Residential Passed 5/2/2022 05/02/2022
Misc
Resolved
05/02/2022
9/30/21 - INSPECTED DYE TEST FOR UNDERSLAB PLUMBING WASTE PERFORMED BY PLUMBING CONTRACTOR, DYE TEST ACCEPTABLE, NO VISUAL INSPECTION OF UNDERSLAB PLUMBING PERFORMED, UNDERSLAB WAS POURED WITHOUT INSPECTION SUBMIT LETTERS FROM BUILDER, PLUMBER, AND INTERIOR DRAIN TILE CONTRACTORS AS REQUESTED BY INSPECTION MANAGER MARK HARDING
Sidewalk Inspection Passed 5/3/2022 5/3/2022 05/03/2022
Misc
Informational
04/12/2022
On Tuesday 4.12.2021 I performed A sidewalk inspection and pass the subgrade to pour concrete
Occupancy Inspection - Codes Residential Temporary C of O 5/3/2022 5/3/2022 05/03/2022
Miscellaneous Correction
Corrective Action Required
04/29/2022
TCO until 6/3/22 - Driveway and sidewalk inspection pending - Final grading and sod - Provide Splash blocks - Irrigation incomplete -obtain lawn irrigation permit - Sump discharge minimum of 36” from foundation
Driveway Inspection Passed 5/3/2022 5/3/2022 07/08/2022
Misc
Informational
11/30/2021
On Tuesday 11/30/2021 I performed a driveway inspection and pass the subgrade to pour concrete
Plot Plan Inspection Passed 8/9/2022 08/09/2022
Occupancy Inspection - Codes Residential Full C of O 8/9/2022 8/9/2022 08/09/2022
Miscellaneous Correction
Resolved
08/09/2022
TCO until 6/3/22 - Driveway and sidewalk inspection pending - Final grading and sod - Provide Splash blocks - Irrigation incomplete -obtain lawn irrigation permit - Sump discharge minimum of 36” from foundation
Documents & Images
Date Uploaded File Type Document Name
03/23/2021 Application Form APPLICATION
03/23/2021 PLAT PLAT 62-SVF_000090
03/23/2021 Engineered Permit Plan Lot 62 Summit View Farms 3118 SW Blue Ribbon
03/24/2021 Approved Plans APPROVED PLANS
03/24/2021 Plot Plan APPROVED PLOT PLAN
03/25/2021 Receipt Receipt for transaction:2021-001530
03/25/2021 Letter DS Building Permit
05/03/2021 M L Crose 3118 Sw Blue Ribbon St LSMO Summit View Farms Lot Kenny P 2021-1296 Footing Inspection Report 5-3-21
08/04/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/29/2021 City of LS Inspection UnderSlab
09/30/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
10/04/2021 Letter INSPECTION SUMMARY
10/05/2021 3118 Blue Ribbon Letter A Bright
10/05/2021 City of LS Inspection UnderSlab
10/05/2021 Burke Drain Tile Receipt 59-62_000145
10/09/2021 3118 SW Blue Ribbon Joist Certification
10/11/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
03/16/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter Stop Work Order
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter Codes Temporary Certificate of Occupancy
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
07/08/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter Field Certificate of Occupancy
08/09/2022 Letter Codes Final Certificate of Occupancy
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home