Permit Application Status

PRRES20211034


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211034
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UFNINISHED BASEMENT - ROOF TRUSSES
03/09/2021
03/12/2021
02/10/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/11/2021 03/09/2021
Brandon Kalwei
Residential Plan Review Approved 03/11/2021 03/09/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,629.84 $1,629.84 Paid 03/12/2021
8331507-Sewer Connection Fee $660.00 $660.00 Paid 03/12/2021
Right of Way Permit Fee $80.00 $80.00 Paid 03/12/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/12/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 03/12/2021
Water Meter Fee $455.54 $455.54 Paid 03/12/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 02/07/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 02/07/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 02/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/27/2021 (1:00) 4/27/2021 04/27/2021
Misc
Informational
04/27/2021
UFER LOCATED FOUNDATION WALL REAR OF GARAGE
Underslab Plumbing Inspection - Residential Failed 6/11/2021 6/11/2021 06/10/2021
Misc
Corrective Action Required
06/10/2021
vent basement shower, cannot wet vent between floors
Underslab Plumbing Inspection - Residential Passed 6/14/2021 6/14/2021 06/14/2021
Misc
Resolved
06/14/2021
Sewer Service Inspection - R Partial 9/20/2021 09/20/2021
Misc
Informational
09/20/2021
PARTIAL SEWER HOUSE TO MIDDLE OF OVERHEAD DOOR
Sewer Service Inspection - R Passed 9/21/2021 (11:30) 9/21/2021 09/21/2021
Misc
Resolved
09/21/2021
PARTIAL SEWER HOUSE TO MIDDLE OF OVERHEAD DOOR
Water Service Inspection - R Passed 9/23/2021 (8:45) 9/23/2021 09/23/2021
Erosion Control Inspection Residential Failed 10/13/2021 10/13/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/13/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - CLEAN STREET -
Gas Service Inspection - Residential Passed 10/13/2021 10/13/2021 10/13/2021
Electrical Service Inspection Passed 10/21/2021 10/21/2021 10/21/2021
All Rough Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
Miscellaneous Correction
Corrective Action Required
10/21/2021
Furr out HVAC ducts garage to allow for insulation Tighten anchor bolts garage Provide anchor bolt single car garage Solid block above house to garage wall Fire block top plate 2nd story landing Nail studs at intersecting wall corners per plan Provide 4 stud pack at GT bearing points per plan Provide H2.5s girder truss loft Strap top plate bed 1 near shower Replace stud behind shower bed 2 Provide boca plate bath 2 vanity Solid block & nail sheathing breaks at 1st landing & front door Fire block HVAC chase at stairway Fire block HVAC chase near patio door Seal HVAC chase pantry Address cut floor joist near clean outs & radon basement Double every other floor joist above furnace per plan Nail exterior wall sheathing per code
All Rough Inspection - Residential Not Ready 10/26/2021 10/26/2021 10/26/2021
Miscellaneous Correction
Corrective Action Required
10/21/2021
Furr out HVAC ducts garage to allow for insulation ( needs fire blocking ) Tighten anchor bolts garage ( north wall ) Solid block above house to garage wall Fire block top plate 2nd story landing ( solid block & nail per code) Nail studs at intersecting wall corners per plan Provide 4 stud pack at GT bearing points per plan Replace stud behind shower bed 2 Provide boca plate bath 2 vanity Solid block & nail sheathing breaks south of front door Fire block HVAC chase at stairway Fire block HVAC chase near patio door Seal HVAC chase pantry Nail exterior wall sheathing per code
Driveway Inspection Partial 11/3/2021 11/3/2021 11/03/2021
Misc
Informational
11/03/2021
Driveway was framed and had 4” of aggregate in and compacted. Meets LS and ADA spec. 11/3 ES
All Rough Inspection - Residential Failed 11/5/2021 11/5/2021 11/05/2021
Miscellaneous Correction
Corrective Action Required
10/26/2021
Furr out HVAC ducts garage to allow for insulation ( needs fire blocking ) Seal upward penetration for dwv at house/garage wall Provide 4 stud pack at GT bearing point bedroom 2 per plan(in wrong location) Solid block & nail sheathing breaks south of front door Fire block HVAC chase at stairway Fire block HVAC chase near patio door Seal HVAC chase
Sidewalk Inspection Partial 11/8/2021 11/8/2021 11/08/2021
Misc
Informational
11/08/2021
Sidewalk is framed in, has aggregate in place and compacted. Meets LS and ADA specs. 11/8 ES
All Rough Inspection - Residential Not Ready 11/9/2021 11/9/2021 11/09/2021
Miscellaneous Correction
Corrective Action Required
11/05/2021
Furr out HVAC ducts garage to allow for insulation ( needs fire blocking when complete ) Fire block HVAC chase at stairway Fire block HVAC chase near patio door ( refer to R302.11 2018 IRC )
All Rough Inspection - Residential Passed 11/10/2021 11/10/2021 11/10/2021
Miscellaneous Correction
Resolved
11/10/2021
Sidewalk Inspection Passed 11/12/2021 11/12/2021 11/12/2021
Misc
Informational
11/08/2021
Sidewalk is framed in, has aggregate in place and compacted. Meets LS and ADA specs. 11/8 ES
Misc
Informational
11/12/2021
Sidewalk meets LS and ADA spec. 11/12 ES
Driveway Inspection Failed 11/12/2021 11/12/2021 11/12/2021
Misc
Informational
11/03/2021
Driveway was framed and had 4” of aggregate in and compacted. Meets LS and ADA spec. 11/3 ES
Misc
Corrective Action Required
11/12/2021
Driveway approach is out of tolerance through the 5’ sidewalk lane and doesn’t meet LS/ADA spec. Need to remove and replace. 11/12 ES
Occupancy Inspection - Codes Residential Not Ready 11/15/2021 11/15/2021 11/15/2021
Driveway Inspection Passed 01/11/2022
Misc
Informational
11/12/2021
Driveway was framed and had 4” of aggregate in and compacted. Meets LS and ADA spec. 11/3 ES
Misc
Corrective Action Required
11/12/2021
Driveway approach is out of tolerance through the 5’ sidewalk lane and doesn’t meet LS/ADA spec. Need to remove and replace. 11/12 ES
Misc
Informational
01/11/2022
Finished driveway meets LS and ADA specs. RP 1-11-22
Plot Plan Inspection Passed 2/4/2022 02/04/2022
Occupancy Inspection - Codes Residential Failed 2/4/2022 2/4/2022 02/04/2022
Miscellaneous Correction
Corrective Action Required
02/04/2022
- Pay all fees - Submit back flow certification - Security screws in back door - Garage entry door must be self closing - Remove dust covering from smoke detectors - Provide steps for Egress window basement
Occupancy Inspection - Codes Residential Full C of O 2/10/2022 2/10/2022 02/10/2022
Miscellaneous Correction
Corrective Action Required
02/04/2022
Documents & Images
Date Uploaded File Type Document Name
03/09/2021 Application Form APPLICATION
03/09/2021 86 WOODSIDE RIDGE TRUSS LAYOUT
03/09/2021 W0 #86 - Prescott - Mediterranean - Sheets- signed
03/09/2021 210285
03/09/2021 LOT 86 FINAL
03/09/2021 Approved Plans APPROVED PLANS
03/09/2021 Approved Plans APPROVED TRUSS DRAWINGS
03/09/2021 Approved Plans APPROVED TRUSS LAYOUT
03/09/2021 Plot Plan APPROVED PLOT PLAN
03/12/2021 Receipt Receipt for transaction:2021-001235
03/12/2021 Letter DS Building Permit
04/27/2021 Letter INSPECTION SUMMARY
06/10/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
09/20/2021 Letter INSPECTION SUMMARY
09/21/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/05/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
01/11/2022 Letter INSPECTION SUMMARY
02/04/2022 Letter INSPECTION SUMMARY
02/04/2022 Letter INSPECTION SUMMARY
02/07/2022 Receipt Receipt for transaction:2022-000634
02/10/2022 Letter Field Certificate of Occupancy
02/10/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home