Summary
PRRES20210648
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
02/18/2021
03/23/2021
09/04/2021
02/28/2024
Locations
Contacts
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
SPELLERBERG ENTERPRISES LLC, Address:613 NE VIEWPARK DR, Phone:(816) 550-5535  
SPELLERBERGENTERPRISES@GMAIL.COM  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
NEW HEIGHTS ELECTRIC LLC, Address:P O BOX 163, Phone:(816) 625-9504  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/10/2021 03/08/2021
Brandon Kalwei
Rear yard dimension
Corrective Action Required
03/08/2021

The rear yard demision(s) must be provided on the plot plan.
Building elevations
Corrective Action Required
03/08/2021

Existing and finished elevations at building footprint corners must be provided on the plot plan. NW corner of house
Residential Plan Review Approved 03/10/2021 03/08/2021
Brandon Kalwei
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
03/08/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Unfinished basement sq. ft. do not match between plans and application
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
03/08/2021

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315)detectors needed in finsished basement
Plot Plan Review Rejected 02/22/2021 02/18/2021
Brandon Kalwei
Rear yard dimension
Corrective Action Required
02/18/2021

The rear yard demision(s) must be provided on the plot plan.
Building elevations
Corrective Action Required
02/18/2021

Existing and finished elevations at building footprint corners must be provided on the plot plan. NW corner of house
Residential Plan Review Rejected 02/22/2021 02/18/2021
Brandon Kalwei
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
02/18/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Unfinished basement sq. ft. do not match between plans and application
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
02/18/2021

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315)detectors needed in finsished basement
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,619.99 $1,619.99 Paid 03/23/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 03/23/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/23/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 03/23/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/23/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/23/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/07/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $100.00 $100.00 Paid 01/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/30/2021 03/30/2021
Sewer Service Inspection - R Passed 4/21/2021 (11:15) 4/21/2021 04/21/2021
Water Service Inspection - R Partial 4/21/2021 4/21/2021 04/21/2021
Misc
Informational
04/21/2021
-partial inspection on pex
Water Service Inspection - R Passed 4/22/2021 (1:00) 4/22/2021 04/22/2021
Misc
Resolved
04/22/2021
Underslab Plumbing Inspection - Residential Passed 5/4/2021 5/4/2021 05/04/2021
Erosion Control Inspection Residential Failed 5/27/2021 5/27/2021 05/27/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/27/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN EROSION CONTROL
Erosion Control Inspection Residential Failed 6/25/2021 6/25/2021 06/25/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/25/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AND GRAVEL FROM STREET
Erosion Control Inspection Residential Failed 7/2/2021 7/2/2021 07/02/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AND GRAVEL FROM STREET
All Rough Inspection - Residential Not Ready 9/15/2021 9/15/2021 09/15/2021
Misc
Corrective Action Required
09/15/2021
INSPECTION DENIED REPAIR DAMAGED SILT FENCE FRONT OF LOT NO CITY STAMPED PLANS ON SITE
Electrical Service Inspection Passed 9/17/2021 9/17/2021 09/17/2021
Gas Service Inspection - Residential Passed 9/17/2021 9/17/2021 09/17/2021
All Rough Inspection - Residential Failed 9/17/2021 9/17/2021 09/17/2021
Misc
Corrective Action Required
09/15/2021
-Unable to determine nail pattern for sheathing to header at garage PFH due to siding cover -Nail complete Jack stud straps at garage PFH -Add joist hangers at tail joist to header connections at garage attic access -Fireblock vertical to horizontal at garage furred down, Fireblock around DWV and pex vertical to furred down -Fur down for insulation at HVAC garage ceiling and fur out for HVAC at garage wall -Add stud shoe at DWV kitchen wall -Dbl top plate requires 24” offset between plate breaks-strap top plates- see 1st floor pantry, 2nd floor stair landing, 2nd floor front bedroom -12” oc nailing at all abutting and intersecting wall corners for braced walls -seal all top plate penetration -see basement stair wall at great room, master bedroom -Fireblock all tub traps -CS-PF braced wall design all locations per plans -LIB bracing at mud 1st floor, 2nd floor rear bedroom per plans -(3) stud pack at bearing ends (2) 2X10 steel flitch beam at breakfast -Garage PFH design per plans -Nail complete Jack straps at CS-PF 2nd floor front bedroom -Secure all vertical DWV 2” or less at mid point- see 2nd floor -Add joist hanger tail joist at attic access 2nd floor laundry -security blocking master bed covered deck -seal unused bottom plate bore 2nd floor rear bedroom -2nd floor, 2 studs at load bearing walls as shown on plans for roof support bearing -double ceiling joists master bed covered deck per plans -Support ridge at 2nd floor hall -Purlin struts not less than 45 degree angle -Anchor all SCH 40 steel columns to floor at basement -Fireblock vertical to horizontal at furred down soffit ends at basement -Secure/support NM (romex) ever 4.5’ through furred downs at basement -Fireblock deadspace between walls at basement bath shower -Add box and secure conduit for sump pump receptacle
All Rough Inspection - Residential Failed 9/28/2021 9/28/2021 09/28/2021
Misc
Corrective Action Required
09/17/2021
-Add joist hangers at tail joist to header connections at garage attic access -same cj requires hanger at header for hip opposite end of attic access -Fireblock around DWV and pex vertical at garage furred down -CS-PF braced wall design all locations per plans -Secure all vertical DWV 2” or less at mid point- see 2nd floor master bath -Anchor all SCH 40 steel columns to floor at basement -Fireblock deadspace between walls at basement bath shower
All Rough Inspection - Residential Failed 10/4/2021 10/4/2021 10/04/2021
Misc
Corrective Action Required
09/28/2021
-CS-PF braced wall design all locations per plans -insulate and install osb per engineer letter, reinspect after osb install -Fireblock deadspace between walls at basement bath shower - if using loose unfaced insulation it needs to be packed tight into cavity as insulation is falling from cavity **OK TO UNSULATE**
All Rough Inspection - Residential Passed 10/6/2021 10/6/2021 10/06/2021
Misc
Resolved
10/06/2021
Driveway Inspection Passed 10/20/2021 10/20/2021 10/20/2021
Misc
Informational
10/20/2021
On 10/20/2021 I performed a driveway inspection and pass the subgrade to pour concrete. On 1-06-2021. I performed a visual inspection of the driveway and found the driveway to pass city standard.
Plot Plan Inspection Passed 1/5/2022 01/05/2022
Occupancy Inspection - Codes Residential Failed 1/5/2022 1/5/2022 01/05/2022
Misc
Corrective Action Required
01/05/2022
*Pay all fees* -complete sidewalk inspection -Complete hardware at front door -garage outlets must comply with code section E3901.9 of the IRC -label all non GFCI outlets -complete cook top ventilation in island -complete fire place install -sheer off screw at anti Siphon device in basement -A/c breaker incorrect size, lockout on oven breaker
Sidewalk Inspection Passed 12/9/2021 01/06/2022
Misc
Informational
12/09/2021
On Thursday 12.09.2021 I performed a sidewalk inspection and pass the sub-grade to pour concrete On Thursday, 1-06-2022. I performed a visual field inspection of the installed sidewalk and found it to pass city standard
Sidewalk Inspection Passed 1/6/2022 1/6/2022 01/06/2022
Misc
Informational
12/09/2021
On Thursday 12.09.2021 I performed a sidewalk inspection and pass the sub-grade to pour concrete
Misc
Informational
01/06/2022
Inspector: JJACKSON Sidewalk passed final inspection 1/06/22.
Erosion Control Inspection Residential Passed 1/10/2022 01/10/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/02/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AND GRAVEL FROM STREET
Occupancy Inspection - Codes Residential Temporary C of O 1/10/2022 1/10/2022 01/10/2022
Misc
Corrective Action Required
01/05/2022
*Pay all fees* TCO until 1/24/22
Piers/Caissons Inspection - Residential Failed 1/20/2022 01/20/2022
Misc
Corrective Action Required
01/20/2022
PIERS POURED WITHOUT INSPECTION
Occupancy Inspection - Codes Residential Full C of O 02/28/2024
Misc
Resolved
02/28/2024
*Pay all fees* TCO until 1/24/22
Documents & Images
Date Uploaded File Type Document Name
02/18/2021 Application Form APPLICATION
02/18/2021 63 Summit View Farms
02/18/2021 SVF 63 LSMO
02/18/2021 Letter Codes Residential Plan Review
02/25/2021 Plot Plan APPROVED PLOT PLAN
03/08/2021 SVF 63 LSMO (2)
03/08/2021 Approved Plans APPROVED PLANS
03/23/2021 Receipt Receipt for transaction:2021-001449
03/23/2021 Letter DS Building Permit
03/30/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/22/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
10/01/2021 Approved Plans CHANGED BAY WINDOW DETAIL
10/04/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
10/20/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/06/2022 Letter INSPECTION SUMMARY
01/06/2022 Letter INSPECTION SUMMARY
01/06/2022 Letter INSPECTION SUMMARY
01/06/2022 Letter INSPECTION SUMMARY
01/07/2022 Receipt Receipt for transaction:2022-000124
01/10/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter Codes Temporary Certificate of Occupancy
01/20/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home