Permit Application Status

PRRES20210587


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210587
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 03/31/2021 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 04/01/2021 12:00 AM by username 'Patrick Schonfeldt'.
02/12/2021
02/16/2021
12/10/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
PERMITTING@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/17/2021 02/12/2021
Brandon Kalwei
As-graded plot plan
Corrective Action Required
02/12/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 02/17/2021 02/12/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,361.06 $1,361.06 Paid 02/16/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 02/16/2021
Right of Way Permit Fee $80.00 $80.00 Paid 02/16/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/16/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 02/16/2021
Water Meter Fee $455.54 $455.54 Paid 02/16/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 11/09/2021
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 11/09/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 3/31/2021 3/31/2021 03/31/2021
Misc
Corrective Action Required
03/31/2021
-FOOTING POURED WITHOUT INSPECTION, SUBMIT ENGINEER REPORT. THIRD PARTY INSPECTION REPORT REQUIRED TO BE SUBMITTED TO PERMIT WITHIN (2) DAYS OF INSPECTION
Footing Inspection - Residential Passed 4/1/2021 4/1/2021 04/01/2021
Misc
Resolved
04/01/2021
-FOOTING POURED WITHOUT INSPECTION, SUBMIT ENGINEER REPORT. THIRD PARTY INSPECTION REPORT REQUIRED TO BE SUBMITTED TO PERMIT WITHIN (2) DAYS OF INSPECTION
Underslab Plumbing Inspection - Residential Passed 5/4/2021 5/4/2021 05/04/2021
Erosion Control Inspection Residential Failed 6/25/2021 6/25/2021 06/25/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/25/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Sewer Service Inspection - R Passed 6/30/2021 (1:00) 6/30/2021 06/30/2021
Water Service Inspection - R Passed 7/1/2021 (9:00) 7/1/2021 07/01/2021
All Rough Inspection - Residential Failed 7/29/2021 7/29/2021 07/29/2021
Misc
Corrective Action Required
07/29/2021
-Fireblock vertical to horizontal at furred down in garage see around pex and DWV -solid blocking required at panel splices at garage portal with 3” oc nailing both edges of sheathing -DBL top plate requires 24” offset between plate breaks - strap plate- see above kitchen window, above fireplace great room, -Fireblock chases great room -(2) floor joists overboard for DWV, 1st floor great room near fireplace, replace or submit engineer letter -support all Vertical DWV 2” or less at mid point -LIB bracing all locations per plans -provide proper support of covered porch beam at front bed#5 1st corner -seal top plate penetrations- bed#5 1st floor -Seal all floor penetrations at fireplace, 2nd floor low volt at HVAC chase master bed -Ensure access for jacuzzi tub motors at finish -Nail all dbl truss girders together per plans -fireblock all tub/shower traps -Add joist hangers at sgl joist to dbl joist connection at fireplace cantilever basement -Anchor bolts required within 12” of plate breaks in basement -support DWV every 48” oc, traps not considered support -Provide return air for HVAC at 1st/2nd floor per design -Complete open hot pex near furnace, above beam/gas line basement -Nail all exterior sheathing per plans
All Rough Inspection - Residential Failed 8/6/2021 8/6/2021 08/06/2021
Misc
Corrective Action Required
07/29/2021
-Fireblock chases great room around DWV gaps -LIB bracing all locations per plans - see garage -seal top plate penetrations- bed#5 1st floor -Seal floor penetrations at 2nd floor low volt at HVAC chase master bed -add receptacle for jacuzzi tub motor electrical
All Rough Inspection - Residential Passed 8/10/2021 8/10/2021 08/10/2021
Misc
Resolved
08/10/2021
Electrical Service Inspection Passed 8/26/2021 8/26/2021 08/26/2021
Gas Service Inspection - Residential Passed 8/26/2021 8/26/2021 08/26/2021
Driveway Inspection Passed 9/16/2021 9/16/2021 09/17/2021
Misc
Informational
09/17/2021
On Thursday, 9-16-2021. I performed a driveway inspection and passed drive for concrete placement.
Occupancy Inspection - Codes Residential Failed 11/8/2021 11/8/2021 11/08/2021
Misc
Corrective Action Required
11/08/2021
-obtain sprinkler permit -Open junction box front right and left of garage -guard rail at front stoop where more than 30” from grade -anti tilt device on oven -open junction box garage ceiling -handrail required at basement steps -spacing at deck guard rail must comply with code section R312.1.3 -Provide inside joist hanger at rim joists on deck -siding must be 6” above grade -seal top of meter can And all other exterior penetrations -Sump pump discharge and all other exterior drainage to be 36” from foundation
Plot Plan Inspection Passed 12/3/2021 12/03/2021
Piers/Caissons Inspection - Residential Passed 12/3/2021 12/03/2021
Misc
Informational
12/03/2021
3rd party inspection
Erosion Control Inspection Residential Failed 12/3/2021 12/03/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
12/03/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
12/03/2021
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTING FURTHER INSPECTIONS.
Occupancy Inspection - Codes Residential Failed 12/3/2021 12/3/2021 12/03/2021
Misc
Corrective Action Required
11/08/2021
-anti tilt device on oven -SUMP PUMP DISCHARGE, SPLASH BLOCKS AND ALL OTHER EXTERIOR DRAINAGE TO BE 36" FROM FOUNDATION
Erosion Control Inspection Residential Passed 12/10/2021 12/10/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
12/10/2021
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTING FURTHER INSPECTIONS.
Occupancy Inspection - Codes Residential Full C of O 12/10/2021 12/10/2021 12/10/2021
Misc
Resolved
12/10/2021
-anti tilt device on oven -SUMP PUMP DISCHARGE, SPLASH BLOCKS AND ALL OTHER EXTERIOR DRAINAGE TO BE 36" FROM FOUNDATION
Documents & Images
Date Uploaded File Type Document Name
02/12/2021 Application Form APPLICATION
02/12/2021 Approved Plans APPROVED PLANS
02/12/2021 Approved Plans APPROVED TRUSS DRAWINGS
02/12/2021 Approved Plans APPROVED TRUSS LAYOUT
02/12/2021 Plot Plan APPROVED PLOT PLAN
02/16/2021 Receipt Receipt for transaction:2021-000718
02/16/2021 Letter DS Building Permit
03/31/2021 Letter Stop Work Order
03/31/2021 Lot 26 Hawthorne Ridge Footing Inspection
03/31/2021 Lot 26 Hawthorne Ridge Wall Inspection
04/01/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
06/30/2021 Letter INSPECTION SUMMARY
07/01/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
08/04/2021 Master Replacement Proposal.doc
08/05/2021 26 Hawthorne Ridge hole in floor joists letter
08/06/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/09/2021 Receipt Receipt for transaction:2021-008616
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter Field Certificate of Occupancy
12/10/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home